Journal Comment |
| |
| · Mine optimization Dixon, JR
|
| |
President's Corner |
| |
| · Serious dialogue Dworzanowski, M.
|
| |
Special Articles |
| |
| · SAIMM Career Development Day - 13 August 2013 Duke, V.
|
| |
| · SAIMM Career Development Day: Report back on Mentoring Knottenbelt, P.J.
|
| |
| · International Honours for two Wits Engineers van Wyk, E.
|
| |
Conference Papers |
| |
| · The use of change management and behaviour-based training in an improvement project aimed at creating organizational sustainability in a multicultural mining environment in Zambia Prinsloo, H.B.; Claassen, J.O.
|
| |
| · Yield improvement at a mid-sized coal mine in the Witbank coalfields Claassen, J.O.
|
| |
| · A framework to simplify the management of throughput and constraints Cambitsis, A.
|
| |
| · Integrated optimization of underground mine design and scheduling Little, J.; Knights, P.; Topal, E.
|
| |
General Papers |
| |
| · Relating high-resolution tilt measurements to the source displacement of an M2.2 event located at Mponeng gold mine Share, P.; Milev, A.; Durrheim, R.; Kuijpers, J.; Ogasawara, H.
|
| |
| · The absence of strategy in orepass planning, design, and management Hadjigeorgiou, J.; Stacey, T.R.
|
| |
Erratum |
| |
| · Erratum
|
| |