This paper considers the problem of minimizing the number of tardy jobs with release time on a single machine. Given that the problem has been classified as strongly NP-Hard, three heuristics (EOO, HR2, and HR3) are proposed for this problem. They are compared with a heuristic by Dauzere-Perez (selected from the literature). Randomly-generated problems ranging from 3 to 500 jobs are solved. Experimental results show that one of the proposed heuristics (EOO) outperforms other heuristics, both in terms of quality of solution (effectiveness) and speed of execution (efficiency).