Tabla de contenido
South African Journal of Industrial Engineering, Volumen: 19, Numero: 2, Publicado: 2008South African Journal of Industrial Engineering, Volumen: 19, Numero: 2, Publicado: 2008
| Documents |
|---|
|
General Articles Architectural concepts for Value Chains Janse van Rensburg, A.C. Resumen en Inglés: The Porter Value Chain has been widely adopted by the business community as a mechanism to understand and comprehend complexity in business environments, with the ultimate goal of structuring the business to maximize its competitive advantage. Implementing the Value Chain is not easy: a number of organizations can testify to their failure to derive any benefits at all from this concept. To overcome this problem, an approach is presented to assist the organization in creating a Value Chain reference model within the broader context of the organization's enterprise architecture.Resumen en af: Die "Porter Waardeketting" is 'n algemene aanvaarde praktyk wat deur maatskappye gebruik word om die kompleksiteit van besigheidsomgewings mee te verstaan. Die uiteindelike doel hiervan is om die besigheid se mededings voordele te optimiseer. Om die Waardekettingkonsep te implementeer, is nie 'n maklike taak nie - verskeie organisasies kan getuig van mislukte implementeringspogings. Hierdie artikel beskryf 'n benadering beskryf wat gebruik kan word om die organisasie te help om 'n Waardekettingmodel te skep in die bree konteks van die organisasie se besigheidsargitektuur. |
|
General Articles Managing the cold chain: A case study at a South African ice cream company Grobler, J. Yadavalli, V.S.S. Resumen en Inglés: This paper documents the results of a supply chain management (SCM) case study conducted at Centurion Ice Cream and Sweets CC, a producer of ice cream in the greater Gauteng area. The current SCM environment was first analyzed before the distribution function was identified as a prime candidate for further analysis. A Monte Carlo simulation was subsequently performed to investigate the effect of different distribution scenarios. The paper concludes with an investigation into information technology (IT) as the enabler for improved supply chain performance.Resumen en af: Hierdie artikel dokumenteer die resultate van 'n voorsieningskanaalgevallestudie uitgevoer by Centurion Ice Cream and Sweets CC, 'n roomysvervaardiger in die Gauteng-area. Die voorsieningskanaal is eers ontleed voordat die distribusiefunksie geïdentifiseer is as 'n kandidaat vir verdere analise. 'n Monte Carlo-simulasie uitgevoer om die effek van verskillende distribusiescenarios te ondersoek. Die artikel sluit af met 'n ondersoek na inligtingstegnologie as katalisator vir verbeterde voorsieningskanaalprestasie. |
|
Developing a framework for evaluating spent nuclear fuel management options for South Africa
Twala, V.G.
Auf der Heyde, T.
Bredell, P.J.
Pretorius, L.
Resumen en Inglés: The search for consensus on spent fuel management (SFM) strategies in the nuclear industry has become complex, not least in the South African context. This study identifies three SFM options: reprocessing-and-recycling, direct disposal, and indefinite storage. From the contentious issues surrounding the SFM options, a framework for evaluating the options and selecting a preferred SFM option for South Africa is proposed. It consists of evaluation criteria categorised into nine dimensions: technological, safety, environmental, proliferation, security, economic, sociopolitical, ethical, and institutional. The framework's comprehensiveness shows that SFM options have developed to a stage where South Africa can make an informed policy decision on the strategy it wishes to pursue.Resumen en af: Die soeke na eenstemmigheid rondom strategieë vir die hantering van verbruikte kernafvalbrandstof (SFM) is kompleks. Hierdie artikel identifiseer drie SFM-opsies: Herprosessering en herwinning, direkte verwydering, en onbepaalde berging. Vanuit die sensitiewe kwessies wat die SFM-opsies beinvloed, word 'n raamwerk ontwikkel waarmee 'n voorkeuropsie vir Suid-Afrika daargestel word. Die raamwerk bestaan uit evalueringskriteria wat in nege dimensies gerangskik word: tegnologies, veiligheid, omgewing, proliferasie, sekuriteit, ekonomies, sosio-polities, eties, en institusioneel. Die omvang van die raamwerk dui daarop dat SFM opsies tot so 'n stand ontwikkel het dat Suid Afrika 'n ingeligte beleidsbesluit kan neem oor die strategie wat hy sou wou volg. |
|
General Articles A risk management methodology for non-metallic process equipment Viviers, J.J. Visser, J.K. Resumen en Inglés: Many companies in South Africa have implemented the risk-based inspection (RBI) methodology as a maintenance strategy. The risk involved in operating a piece of equipment, past history, non-destructive examination techniques, failure modes, and many other aspects determine the frequency of inspections required to meet legislation. The main purpose of the RBI methodology is to prevent failures of process equipment. The methodology for risk-based inspection for metal equipment is well-established and has been proven in industry, becoming the norm nationally and internationally. However, it is not possible to apply all the techniques to non-metallic equipment owing to vast differences between the two types of materials. This paper discusses the results of data gathered on the RBI methodology for non-metallic equipment, and proposes a risk-based model that can be used to perform a risk assessment for non-metallic equipment in a process plant. The risk assessment can be used to formulate the next inspection interval for the asset.Resumen en af: Verskeie maatskappye in Suid-Afrika het reeds die metodologie van risiko-gebaseeerde inspeksie (RBI) geïmplementeer as deel van 'n omvattende instandhoudingstrategie. Die risiko betrokke by 'n fisiese item, bedryfsgeskiedenis, nie-vernietigende toetstegnieke, falingsmodusse, en vele ander aspekte bepaal die frekwensie van inspeksies wat benodig word om aan wetlike vereistes te voldoen. Die hoofdoel van die risiko-gebaseerde metodologie is om faling van prosestoerusting te verhinder. Die metodologie vir risiko-gebaseerde inspeksie van metaaltoerusting is goed bekend en word suksesvol toegepas in die industrie. Dis is egter nie moontlik om al die tegnieke toe te pas op nie-metaaltoerusting nie weens die groot verskeidenheid van materiaaltipes. Hierdie artikel bespreek die data wat ingewin is op die risiko-gebaseerde metodologie vir nie-metaaltipeprosestoerusting, en stel 'n nuwe risiko-gebaseerde model voor wat gebruik kan word om die risiko te bepaal vir nie-metaal toerusting van 'n prosesaanleg. Die risikoprofiel kan gebruik word om die volgende inspeksie-interval vir die toerusting te formuleer. |
|
General Articles Risk categorisation of products used for the construction of electricity distribution assets le Roux, A.J. van Waveren, C.C. Resumen en Inglés: The balance between risk and reward is the very essence of business, and companies take risks in order to generate returns. Eskom, the electricity utility in South Africa, endeavors to construct networks that are reliable and safe for its employees as well as the public. To ensure that product reliability requirements align with company goals, products should be categorised according to the risk they pose to the business. Mitigating strategies can therefore be reviewed for high risk items. A 3x3 risk matrix was derived to identify the risk category for products. The application of the process should result in an improvement in product profitability, either directly through a reduction in purchasing cost, or indirectly through avoiding the various consequential costs associated with poor risk management.Resumen en af: Om 'n balans te bereik tussen risiko en vergoeding vorm deel van die dinamiese bestaan van sakeondernemings wat risiko's moet loop om opbrengste te genereer. Eskom, die voorsiener van elektrisiteit in Suid Afrika, poog om netwerke op te rig. Terplaatse produkte wat hiervoor aangewend word en die betroubaarheidsdoelwitte eerbiedig, moet gekategoriseer word teen die tafereel van ondernemingsrisiko. 'n Risikomatriks wat versagtende strategieë voorhou, word daarvoor aangewend. Die gebruik van die metode poog om die winsgewendheid van die onderneming te verbeter teen die agtergrond van verkrygingskoste en die gevolglike koste van swak risikobestuur. |
|
General Articles The technology assessment of demand side bidding in the South African context Grover, H.K. Pretorius, M.W. Resumen en Inglés: South Africa is currently in the grip of a severe power supply capacity constraint. January 2007 saw blackouts throughout the country, and worse was expected in the months to come. As a measure of immediate remedy Eskom has turned to demand side bidding (DSB), a methodology whereby the demand side has an opportunity to sell back flexible load to the supply side. This paper assesses DSB with the aim of evaluating and gauging the current and potential future standing of DSB as a technology product within the South African context.Resumen en af: Suid-Afrika ervaar tans 'n ernstige vraagstuk in elektrisiteitsvoorsiening. Vanaf Januarie 2007 kom gereelde kragonderbrekings voor, en volgens alle aanduidings lê die ergste nog voor. As 'n korttermynmaatreël beoog ESKOM 'n strategie van aanvraagbestuur en spesifiek aanvraag-bie, 'n metodologie waarvolgens verbruikers die geleentheid kry om elektrisiteit aan die verskaffer terug te verkoop. Hierdie artikel assesseer die metodologie ten einde die huidige en toekomstige gebruikers-moontlikhede daarvan as 'n tegnologieproduk binne Suid-Afrikaanse konteks te bepaal. |
|
General Articles Overcurrent relay coordination effects on reliability indices Mazlumi, K. Abyaneh, H. Askarian Resumen en Inglés: Protection system failures are the main causes of cascading outages. There is a need to evaluate reliability indices, yet the effects of relay coordination methods have not yet been investigated in the existing literature. In this paper, an algorithm based on sequential Monte Carlo simulation is proposed to find the reliability indices for different overcurrent relay coordination methods. The proposed algorithm is applied to the results of three different relay coordination methods of a sample network. Then the reliability indices for the results of three different relay coordination methods are compared, and it is shown how the reliability indices are affected by the results of relay coordination methods.Resumen en af: Mislukkings van beveiligingstelsels is hoofsaaklik verantwoordelik vir kaskadeonderbrekings van elektriese netwerke. Derhalwe is dit noodsaaklik dat betroubaarheidsindekse geevaleer moet word teen die agtergrond dat min aandag gegee word aan relêkoördinasie. Monte-Carlo simulasie word voorgehou as oplossing van die koördinasievraagstuk. Die voorgestelde algoritme word toegepas op die afsonderlike koördinasiemetodes van 'n denkbeeldige network. Die resultate van die ondersoek toon dat die berekende betroubaarheidsindeks afhang van hoe koordinasiemetodes toegepas word. |
|
General Articles A performance modeling and decision support system for a feed water unit of a thermal power plant Gupta, S. Tewari, P.C. Sharma, A.K. Resumen en Inglés: The present paper discusses the performance modeling and decision support system for a feed water unit of a thermal power plant using the concept of performance analysis and modeling. A feed water unit ensures a proper supply of water for the sound functioning of a thermal power plant. The decision support system for a feed water unit has been developed with the help of performance modeling using a probabilistic approach. After drawing a transition diagram, differential equations are generated. After that, steady state probabilities are determined. Some decision matrices are also developed, which provide various performance levels for different combinations of failure and repair rates of all subsystems. Based upon various availability values obtained in decision matrices and plots of failure rates / repair rates of various subsystems, the performance of each subsystem is analyzed, and maintenance decisions are made for all subsystems.Resumen en af: Vertoningsanalise en -modellering word gedoen w'r die toevoerwatersisteem van 'n termiese kragstasie. Toevoerwater is 'n belangrike factor vir die doeltreffende bedryf van 'n kragstasie. Die vertoningsanalise en -model is probalisties van aard. 'n Toestandoorgangsdiagram en bypassende differensiaalvergelykings word gebruik, gevolg deur bepaling van die bestandige sisteemtoestand. Bykomende aandag word gegee aan relevante subsisteme. Die vertoning van subsisteme word gebasseer op verskeie beskikbaarheidswaardes om sodoende instandhouding to optimiseer. |
|
General Articles Decision-making and management of pre-investment in a programme of projects Botha, R.P. Steyn, H. Resumen en Inglés: Owing to ever-increasing business pressures and the resulting requirements of organisations, individual projects rarely fulfil all expectations; so it is quite often necessary to implement a programme of interdependent projects. In such programmes the matter of pre-investment (investing effort or money before the project results are required) is a recurring theme amongst programme managers. However, very few decision-making techniques or management guidelines on the topic of pre-investment are available. In this paper a framework is proposed to assist a programme or project manager in the decision-making and management of pre-investment in a programme. The framework is based on pre-investment propositions with high levels of support from a Delphi panel, in the context of a multi-billion Rand petrochemical programme. The results of the research are three matrices that provide guidance on the timing of pre-investment, tools and information required, and benefits of pre-investment. These guidelines all relate to four aspects of pre-investment: context, systems and procedures, timing, and scope. Even though the work was done in the context of a specific case, the pre-investment guidelines should be applicable in various industries.Resumen en af: Die steeds toenemende druk op besighede en die gevolglike vereistes wat ondernemings aan hulself stel, lei daartoe dat individuele projekte selde aan al die verwagtings voldoen. Dit is dus dikwels nodig om 'n program van interafhanklike projekte te implementeer. In sulke programme is voorafinvestering (investering van fondse of werk voordat projekresultate vereis word) 'n saak wat by herhaling deur programbestuurders opgehaal word. Daar bestaan egter tans geen besluitnemings-tegnieke of riglyne vir die bestuur van voorafinvestering nie. Hierdie artikel behandel 'n raamwerk om programbestuurders en projekbestuurders behulpsaam te wees met besluitneming oor en die bestuur van vooraf-investering. Die raamwerk is gebaseer op proposisies ten opsigte van vooraf-investering met 'n hoë vlak van aanvaarding van 'n Delphipaneel, in die konteks van 'n multi-biljoen Rand petrochemiese program. Die navorsing het drie matrikse opgelewer wat riglyne verskaf vir die tydsberekening vir vooraf-investering, hulpmiddels en inligting wat vereis word, en die voordele van vooraf-investering. Al hierdie riglyne hou verband met vier aspekte van vooraf-investering: konteks, stelsels en prosedures, tydsberekening, en bestek. Alhoewel die werk gedoen is in die konteks van 'n spesifieke geval, behoort die riglyne toepassing te vind in verskeie bedrywe. |
|
General Articles A procedure for determining optimal facility location and sub-optimal positions Dan, P.K. Resumen en Inglés: This research presents a methodology for determining the optimal location of a new facility, having physical flow interaction of various degrees with other existing facilities in the presence of barriers impeding the shortest flow-path as well as the sub-optimal iso-cost positions. It also determines sub-optimal iso-cost positions with additional cost or penalty for not being able to site it at the computed optimal point. The proposed methodology considers all types of quadrilateral barrier or forbidden region configurations to generalize and by-pass such impenetrable obstacles, and adopts a scheme of searching through the vertices of the quadrilaterals to determine the alternative shortest flow-path. This procedure of obstacle avoidance is novel. Software has been developed to facilitate computations for the search algorithm to determine the optimal and iso-cost co-ordinates. The test results are presented.Resumen en af: Die navorsing behandel 'n procedure vir die bepaling van optimum stigtingsposisie vir 'n onderneming met vloei vanaf ander bestaande fasiliteite in die teenwoordigheid van 'n verskeidenheid van randvoorwaardes. Die prodedure lewer as resultaat suboptimale isokoste-stigtingsplekke met bekendmaking van die koste wat onstaan a.g.v. afwyking van die randvoorwaardlose optimum oplossingskoste, die prosedure maak gebruik van 'n vindingryke soekmetode wat toegepas word op niersydige meerkundige voorstellings vir die bepaling van korste roetes wat versperring omseil. Die prosedure word onderskei deur programmatuur. Toetsresultate word voorgehou. |
|
General Articles User specifications for pressure vessels and technical integrity Johnston, K.S. Amadi-Echendu, J.E. Resumen en Inglés: Specifications translated from user requirements are prescribed in an attempt to capture and incorporate best practices with regards to the design, fabrication, testing, and operation of pressure vessels. The question as to whether these requirements affect the technical integrity of pressure vessels is often a subjective matter. This paper examines typical user requirement specifications against technical integrity of pressure vessels. The paper draws on a survey of a convenience sample of practising engineers in a diversified petrochemical company. When compared with failures on selected pressure vessels recorded by Phillips and Warwick, the respondent feedback confirms the user specifications that have the highest impact on technical integrity.Resumen en af: Gebruikersbehoeftes word saamgevat in spesifikasies wat lei tot goeie praktyk vir ontwerp, vervaarding, toetsing en bedryf van drukvate. Subjektiwiteit van die gebruikersbehoeftes mag soms die tegniese integriteit van 'n drukvat beinvloed. Die navorsing maak by wyse van monsterneming gebruik van die kennis van ingenieurs wat werk in 'n gediversifiseerde petrochemiese bedryf.Die terugvoering bevestig dat bogenoemde spesifikasies inderdaad die grootste invloed het op tegniese integriteit. |
|
General Articles Application of technology management strategies and methods to identify and assess cleaner production options: Cases in the South African automotive industry Pandey, A.K. Brent, A.C. Resumen en Inglés: Environmental degradation is a burgeoning problem owing to the continual expansion of industrial production, and high-levels of energy and material consumption associated with economic growth. Cleaner Production (CP) is a preventive environmental approach, aimed at increasing resource efficiency and reducing the generation of pollution and waste at source. CP is being implemented globally and in SA, but it is not just an environmental initiative; it also supports other productivity-oriented programmes and strategies. The research study summarised in this paper assessed CP improvement options using two different Technology Management (TM) methods. The objective was to develop a better understanding of CP from a TM perspective. Data was collected through direct participation in case studies within the SA automotive industry. The case studies identified CP focus areas and improvement techniques. Results from the TM assessment were used to suggest strategies to benefit managers of companies and other stakeholders.Resumen en af: Die degenerasie van die omgewing is 'n groeiende probleem weens die toenemende industriële produksie en hoë vlakke van energie- en materiaalgebruik geassosieer met ekonomiese groei. Skoner Produksie (SP) is 'n voorkomende omgewingsaanslag gemik op verhoging van hulpbroneffektiwiteit en die vermindering van besoedeling en afval by die oorsprong. SP word wêreldwyd geimplementeer, ook in Suid-Afrika, maar nie slegs as 'n omgewingsinisiatief nie; dit ondersteun ook ander produktiwi-teitsprogramme en -strategieë. Die navorsing het SP verbeteringsmoontlikhede evalueer mbv twee verskillende metodes van Tegnologiebestuur (TB). Die rede vir die studie was om SP beter te verstaan van 'n TB-perspektief. Data is ingesamel via direkte betrokkenheid in gevallestudies in die SA motorvervaardigingsindustrie. Die studies het SP fokusareas en verbeteringstegnieke uitgewys. Die resultate van die TB-evaluering is gebruik om strategieë voor te stel vir bestuurders van maatskappye en ander betrokke partye. |
|
General Articles Heuristics for minimizing the number of tardy jobs on a single machine with release time Oyetunji, E. O. Oluleye, A. E. Resumen en Inglés: This paper considers the problem of minimizing the number of tardy jobs with release time on a single machine. Given that the problem has been classified as strongly NP-Hard, three heuristics (EOO, HR2, and HR3) are proposed for this problem. They are compared with a heuristic by Dauzere-Perez (selected from the literature). Randomly-generated problems ranging from 3 to 500 jobs are solved. Experimental results show that one of the proposed heuristics (EOO) outperforms other heuristics, both in terms of quality of solution (effectiveness) and speed of execution (efficiency).Resumen en af: Die navorsing behandel die ministering van voltooiingstyd van die aantal draaltake by 'n enkele werktuig. As aanvaar word dat die problem geklassifiseer word as hoofsaaklike NP-hard, word voorgestel dat die vraagstuk bestudeer word deur gebruik te maak van drie heuristiese metodes (EOO, HR2, HR3). Die metodes word vergelyk ten opsigte van vertoning met die Dauzere-Perez-metode. Toevalsgegenereerde probleme wat strek vanaf 3 tot 500 draaltake word behandel. Die eksperimentele werk lewer bewys dat die EOO-metode ander metodes die loef afsteek ten opsigte van oplossingsgoedheid en -snelheid. |
|
General Articles Goal programming model for production planning in a toothpaste factory Adeyeye, A.D. Charles-Owaba, O.E. Resumen en Inglés: The GP model was developed for production planning in a toothpaste factory. Two objectives were distinguished: minimization of processing cost, and maximization of the capacity utilization of production facilities. Two priority structures were used to explore the trade-off options. When processing cost minimization was assigned the first priority, the utilizations of Processing Plant 1 and Filling Machine 2 were 20.32% and 0.18% respectively. When capacity utilization was assigned first priority, the processing cost increased by 7.55% but capacity utilization improved. The least utilized facility was Filling Machine 1 with a utilization of 43.85%.Resumen en af: Die GP-model is ontwikkel vir die beplanning van produksie van 'n tandepastafabriek. Twee doelwitte is gestel w die beplanning naamlik minimisering van produksiekoste, en maksimering van prosesbesetting. Wanneer minimisering van koste gebruik word as eerste prioriteit is die besettingswaardes van prosesseringaanleg 1 20.32% en van vulmasjien 2 0.18%. Wanneer prosesbesetting gebruik word as eerste prioriteit neem die proseskoste toe met 7.55% en styg die prosesbesetting. Vulmasjien 1 se gevolglike besetting was 43.85%. |
|
General Articles Purpose - Process - People: A lean approach to biomedical manufacturing Kahlen, F-J. Resumen en Inglés: Opportunities to improve production processes and access to markets through the implementation of lean manufacturing in biomedical manufacturing are presented. The importance of a unified definition of manufacturing, to which biomedical manufacturing is party, is emphasized, and the theory of "lean", summarized as "purpose, process, people", is elaborated. The requirements for the creation of value through the creation of flow and the elimination of wastes are highlighted in the context of biomedical manufacturing. Finally, case studies are presented to illustrate the approaches to "purpose, process, people".Resumen en af: Geleenthede vir die verbetering van produksieprosesse en marktoegang via die implementering van skraalvervaardiging in die biomediese vervaardigingsbedryf word voorgehou. Aandag word geskenk aan die betekenis van terme soos "skraal, doel, proses, menes" in die konteks van biomediese vervaardiging. Waardeskepping, vloei en vermorsing word onder die loep geneem. Gevallestudies word ter illustrasie van begrippe aangebied. |
|
Note from the Editor Note from the Editor Adendorff, Susan |
Lea la Declaración de Acceso abierto
