Open-access Seismic monitoring of the Northparkes Lift 2 block cave - Part 2 production caving

Abstract

Production caving started for Lift 2 at Northparkes in August 2004. In a period of less than 3 months, more than 10 000 seismic events were recorded. Events up to local magnitude +2.9 were induced near the mine during caving, with event rates of up to 500 per day. This paper documents the seismicity related to cave initiation and cave propagation during the initial production of Lift 2. The seismogenic zone of events initially moved at a rate of about 0.5 metres per day, accelerating to 2 to 3 metres per day after a few months of cave production. Seismic data analysis infers that the crown pillar between Lift 1 and Lift 2 was destressed over a vertical height of about 100 metres. As the seismogenic zone approached the crown pillar, a macroseismic episode occurred, with more than 20 events of at least local magnitude +1 occurring in a two-week period. Based on the seismicity recorded for Lift 2 at Northparkes Mines, a caving mechanics model is proposed. Comments and suggestions are made for seismic data analysis and design of seismic monitoring systems in block caving mines.


SYNOPSIS

Production caving started for Lift 2 at Northparkes in August 2004. In a period of less than 3 months, more than 10 000 seismic events were recorded. Events up to local magnitude +2.9 were induced near the mine during caving, with event rates of up to 500 per day.
This paper documents the seismicity related to cave initiation and cave propagation during the initial production of Lift 2. The seismogenic zone of events initially moved at a rate of about 0.5 metres per day, accelerating to 2 to 3 metres per day after a few months of cave production. Seismic data analysis infers that the crown pillar between Lift 1 and Lift 2 was destressed over a vertical height of about 100 metres. As the seismogenic zone approached the crown pillar, a macroseismic episode occurred, with more than 20 events of at least local magnitude +1 occurring in a two-week period.
Based on the seismicity recorded for Lift 2 at Northparkes Mines, a caving mechanics model is proposed. Comments and suggestions are made for seismic data analysis and design of seismic monitoring systems in block caving mines.

“Full text available only in PDF format”

References

  • 1. BUTCHER, R. Caving Geomechanics. ACG Seminar, Australian Centre for Geomechanics, Perth, 2003.
  • 2. GLAZER, S.N. and HEPWORTH, N. Crown pillar failure mechanism-case study based on seismic data from Palabora Mine. IMM Transactions-Mining Technology, vol. 115, no. 2, 2006, pp. 75-84.
  • 3. DUPLANCIC, P. Characterisation of caving mechanisms through analysis of stress and seismicity. Unpublished PhD Thesis, Department of Civil and Resource Engineering, University of Western Australia, 2001, 227 pp.
  • 4. GLAZER, S.N. and HEPWORTH, N. Seismicity induced by cave mining, Palabora experience. Proceedings 6th International Symposium on Rockburst and Seismicity in Mines. Potvin, Y. and Hudyma, M.R. (eds.) Perth, Australia. Australian Centre for Geomechanics, 2005, pp: 281-289.
  • 5. DOOLAN, J. An analysis of microseismic activity at Northparkes mines during undercutting of the Lift 2 block cave project. Unpublished Undergraduate Thesis. RMIT, 2004, 77 pp.
  • 6. HUDYMA, M.R. and MILNE, D. Analysis of caving induced mine seismicity at Ridgeway Gold Mine. Technical Research Report-Australian Centre for Geomechanics-Mine Seismicity and Rockburst Risk Management Project, 2004, 67 pp.

Publication Dates

  • Publication in this collection
    25 Jan 2017
  • Date of issue
location_on
The Southern African Institute of Mining and Metallurgy The Southern African Institute of Mining and Metallurgy, 5 Hollard Street, P.O. Box 61127, Marshalltown, Johannesburg, Gauteng, ZA, 2107, Tel: +27 11 834 1273, Tel: +27 11 834 1277 - E-mail: journal@saimm.co.za
rss_feed Acompanhe os números deste periódico no seu leitor de RSS
Ir para o topo