Sumário
Journal of Construction Project Management and Innovation, Volume: 16, Número: 1, Publicado: 2026Journal of Construction Project Management and Innovation, Volume: 16, Número: 1, Publicado: 2026
| Documents |
|---|
|
Articles Predicting the Likelihood of Cost Overruns in Tunnel Projects in Australia Adams, Ishmael Reddy, Vishnuvardhan Mukhiya, Prithivi Ampratwum, Godslove Resumo em Inglês: Cost overruns remain a persistent challenge in tunnel construction projects, yet their predictive assessment, particularly within the Australian context, has received limited scholarly attention. The purpose of this study is to develop a probabilistic, distribution-based framework for understanding and predicting the likelihood and magnitude of cost overruns in Australian tunnel projects, while explicitly examining the influence of project contract size on cost overrun risk. Using historical data from 27 completed tunnel projects, the study applies descriptive and inferential statistical techniques, goodness-of-fit testing, and probability modelling to characterise cost overrun behaviour. The analysis addresses two key questions: (1) What are the statistical properties and best-fit probability distribution of cost overruns? (2) How does contract size influence the likelihood and magnitude of overruns? The results indicate an average cost overrun of 46.60%, accompanied by pronounced variability and positive skewness (2.50). The Dagum distribution provides the best fit for the overall dataset, while the Generalised Extreme Value (GEV) and Gamma distributions best represent projects valued below and above AUD 1 billion, respectively. Although ANOVA results reveal no statistically significant difference in mean cost overruns between small and large projects (p-value = 0.89), smaller projects exhibit substantially greater variability, reflecting distinct underlying risk structures. Probability analysis further demonstrates a 77.34% likelihood of exceeding a 5% cost overrun threshold. By shifting the focus from mean-based assessment to distribution-driven risk modelling, this study contributes a quantitative, tunnel-specific approach for predicting cost overruns. The findings support more informed contingency allocation, probabilistic cost estimation, and risk-aware decision-making for infrastructure stakeholders involved in tunnel project planning and delivery in Australia. |
|
Articles Modelling Organizational Performance in Kenya's Construction Sector: A Canonical Correlation Approach Simon, Shadrack Mutungi Njuguna, Mugwima Resumo em Inglês: Local contractors in Kenya face persistent challenges, including operational inefficiencies and weak management structures, which undermine their ability to compete with international firms. While previous research has focused narrowly on project-level success-emphasizing cost, time, and quality-this study addresses a critical conceptual gap by shifting the analysis to the organizational level. Further, existing literature often treats firm performance as a unidimensional construct and fails to model the complex multivariate relationships between organizational determinants and performance outcomes. The research sought to establish the relationship between ten dimensions of organizational performance and ten key determinants. A canonical correlation analysis (CCA) of the criterion (dimensions) and the predictor (determinants) variables is presented herein using perceptual data from 378 dual-perspective respondents (235 contractors, 143 consultants) drawn from a 612-sample of NCA-registered Kenyan firms (response rate=62%). The results of CCA showed a significant relationship between the dimensions and determinants of organizational performance. The model was statistically significant, with a Wilks's lambda, λ, of .05197, F (100, 1551.20) = 7.93263, p<0.001. Significance across all multivariate tests indicated a good overall model fit. The findings reveal that the most influential drivers of performance are the firm's organizational structure, quality of service, and strategic planning practices. These determinants most strongly impact non-financial outcomes such as employee satisfaction, managerial capability, and overall firm growth. The results were validated using a second dataset, confirming the robustness of the model. For contractors, these findings offer a diagnostic roadmap: to improve profitability and growth, firms must prioritize management flexibility and formalize strategic planning rather than focusing solely on project-specific tasks. For policymakers and regulators, the study underscores the need for institutional support that incentivizes organizational capacity building. By shifting the focus from individual project metrics to holistic firm health, stakeholders can enhance the long-term sustainability and competitiveness of the local construction sector in alignment with national development goals. |
|
Articles Identifying the challenges hindering successful implementation of Just-in-Time management system on construction projects in Nigeria Albert, Idowu Ekundayo, Olurotimi Ijigah, Augustine Edoka Osadola, Opeyemi Ayodeji Resumo em Inglês: The Nigerian construction industry continues to face persistent challenges such as poor material control, escalating costs, and frequent project delays. Although the Just-in-Time (JIT) management system has demonstrated significant success in manufacturing by minimizing waste and improving efficiency, its adoption in construction remains limited within the Nigerian context. This study investigates the major challenges hindering the effective implementation of JIT in construction projects across Edo and Delta States, Nigeria. A quantitative research approach was employed using structured questionnaires randomly distributed to 324 registered construction professionals. Out of these, 203 valid responses were collected, representing 62.65%, and were analysed. Descriptive statistics and exploratory factor analysis were used to identify and categorize implementation challenges. Sixteen key challenges were identified, with inadequate planning, financial constraints, and supply chain disruptions emerging as the most critical. Factor analysis grouped these challenges into three major components: Planning Factors, Financial Factors, and Delay Factors. The study revealed that inadequate planning, financial constraints, and supply chain disruptions are the main challenges hindering project execution in the study area. To improve JIT readiness, the study advocates for strengthened planning mechanisms, increased supplier collaboration, investment in logistics infrastructure, and targeted professional training. Future research should focus on developing a localized JIT framework and exploring digital technologies such as BIM and IoT as enablers of lean material delivery. |
|
Articles Quality Management System Implementation and Timely Completion of Building Projects: Evidence from Rwanda Ndayizeye, Eric Ejiofor, Nnadi Ezekiel Fadugba, Olaolu George Uche, Chikadibia Kalu Awa Resumo em Inglês: The construction industry in rapidly developing economies is expanding in scale and complexity, placing greater pressure on contractors to deliver projects efficiently while maintaining quality standards. Where quality control systems are weak, defects and rework frequently translate into schedule overruns and reduced performance. Rwanda's fast-growing construction sector faces similar challenges, raising questions about whether structured Quality Management System (QMS) implementation can improve project timeliness. This study investigates the relationship between QMS implementation and the timely completion of building projects in Rwanda. A quantitative correlational design was used, from a dataset of 45 building projects executed by 15 construction firms between 2013 and 2024. QMS implementation was classified into four levels-full compliance, near compliance, minimal compliance, and non-compliance-based on documented quality control practices. Data analysis involved descriptive statistics, chi-square tests, Pearson correlation, and binary logistic regression to assess associations and predictive effects. Projects with full QMS compliance achieved the highest on-time completion rate (87%), compared with 50% among non-compliant projects. The Pearson correlation showed a weak positive relationship between QMS implementation and timely completion (r = 0.286, p = 0.057). However, logistic regression identified QMS level as a significant predictor of schedule performance (β = 0.92, p = 0.048), with higher compliance increasing the likelihood of on-time completion by approximately 2.51 times. Frequent inspections and continuous material testing were also linked to lower defect rates and shorter project durations. The findings indicate that systematic quality control practices-particularly inspections, documentation, and staff training-enhance schedule reliability and support staged QMS adoption in emerging construction environments. |
|
Articles Sustainable Roads for Sub-Saharan Africa: A Hybrid Construction 4.0 Approach Biney, Wilson Wellington Biney, Nelson Wellington Resumo em Inglês: Sub-Saharan economies face critical infrastructure deficits, including frameworks for adopting Construction 4.0 technologies in road development. This study addresses this gap by developing structured Hybrid Construction 4.0 adoption pathways tailored to resource-constrained contexts. Through semi-structured interviews with 30 Ghanaian construction experts, compromising construction engineers, project managers, local contractors, and road governing professionals, the study identified six compatible technologies: (i) BIM integrated with local norms and materials, (ii) mobile project management apps combined with manual supervision, (iii) low-cost IoT sensors embedded in indigenous subgrade materials, (iv) drones/UAVs supported by traditional surveys and community insights, (v) GIS/satellite data harmonized with local land-use knowledge, and (vi) modular mobile labs for on-site testing. The study further delineates distinct, cost-effective technology progression sequences for road typologies and firm sizes, advocating for a gradual transition that maximizes return on investment and minimizes operational disruption. This endeavour provides a novel-empirically driven framework for HC4.0 adoption, moving beyond theoretical barriers to offer a pragmatic, scalable pathway. By focusing on technological hybridization and phased sequencing within the specific socioeconomic and infrastructural realities of Sub-Saharan economies, this study offers a replicable model for sustainable infrastructure modernization in developing countries. |
Leia a Declaração de Acesso Aberto
