Goal programming model for production planning in a toothpaste factory
A.D. AdeyeyeI; O.E. Charles-OwabaII
IDepartment of Industrial and Production Engineering, University of Ibadan, Ibadan, Nigeria ademola.adeyeye@mail.ui.edu.ng
IIDepartment of Industrial and Production Engineering, University of Ibadan, Ibadan, Nigeria oeowaba@yahoo.com
ABSTRACT
The GP model was developed for production planning in a toothpaste factory. Two objectives were distinguished: minimization of processing cost, and maximization of the capacity utilization of production facilities. Two priority structures were used to explore the trade-off options. When processing cost minimization was assigned the first priority, the utilizations of Processing Plant 1 and Filling Machine 2 were 20.32% and 0.18% respectively. When capacity utilization was assigned first priority, the processing cost increased by 7.55% but capacity utilization improved. The least utilized facility was Filling Machine 1 with a utilization of 43.85%.
OPSOMMING
Die GP-model is ontwikkel vir die beplanning van produksie van 'n tandepastafabriek. Twee doelwitte is gestel w die beplanning naamlik minimisering van produksiekoste, en maksimering van prosesbesetting. Wanneer minimisering van koste gebruik word as eerste prioriteit is die besettingswaardes van prosesseringaanleg 1 20.32% en van vulmasjien 2 0.18%. Wanneer prosesbesetting gebruik word as eerste prioriteit neem die proseskoste toe met 7.55% en styg die prosesbesetting. Vulmasjien 1 se gevolglike besetting was 43.85%.
“Full text available only in PDF format”
REFERENCES
[1] Sundraham, R.M. 1988. An application of Goal Programming Technique in metal cutting, International Journal of Production Research, 16(5), pp 375-382 [ Links ]
[2] Zanakis, S.H. and Smirth, J.S.1980. Chemical production via Goal Programming, International Journal of Production Research,18(16), pp 687-697 [ Links ]
[3] Zaloom, V., Tolgga, A. and Chu, H. 1986. Bank funds management by Goal Programming, Computer and Industrial Engineering, 11(1-4), pp 132-135 [ Links ]
[4] Chames, A. and Cooper, W.W. 1962 Management models and industrial applications of linear programming, Vol. 1. New York: Wiley [ Links ]
[5] Giannikos, loannis. 1994. A preemptive Goal Programming model for locating obnoxious facilities, Studies in Regional and Urban Planning, 3(1), pp 141- 152 [ Links ]
[6] Lawrence, K.D. and Burbridge. 1976. A multiple goal linear programming model for coordinated production and logistics planning, International Journal of Production Research, 14(2), pp 215-222 [ Links ]
[7] Biswas, Animesh and Bijay Baran Pal. 2005. Application of fuzzy goal programming technique to land use planning in an agricultural system. Omega 33(5), pp 391-398 [ Links ]
[8] Esfandiari, Bijan, Aryanezhad, Mir Bahador, and Abrishamifar, S. Amir. 2004. Open pit optimization including mineral dressing criteria using 0-1 non-linear goal programming: Mining technology, IMM Transactions, Section A, 133(1), pp 3-16 [ Links ]
[9] Gokcen, Hadi and Agpak, Kursad. 2006. A Goal Programming approach to simple u-line balancing problem. European Journal of Operational Research. 171(2), pp 577-585 [ Links ]
[10] Baykasoghlu, Adi I. and Tolunay, Gochen. 2006. A Tabu search approach to fuzzy goal programs and an application to aggregate production planning, Engineering Optimization 38(2), pp 155-177 [ Links ]
[11] Hillier, F. S. and Lieberman, G.J. 1990. Introduction to operation research. McGraw-Hill, pp 267-291 [ Links ]