SciELO - Scientific Electronic Library Online

 
vol.117 número4Coal clearance system at Zondagsfontein Colliery índice de autoresíndice de materiabúsqueda de artículos
Home Pagelista alfabética de revistas  

Servicios Personalizados

Articulo

Indicadores

Links relacionados

  • En proceso de indezaciónCitado por Google
  • En proceso de indezaciónSimilares en Google

Compartir


Journal of the Southern African Institute of Mining and Metallurgy

versión On-line ISSN 2411-9717
versión impresa ISSN 2225-6253

Resumen

DęBEK, C.; WASILEWICZ, A.  y  CZYZ, T.. Investigation and FEM analysis of mineshaft rope safety platforms in underground mining. J. S. Afr. Inst. Min. Metall. [online]. 2017, vol.117, n.4, pp.373-380. ISSN 2411-9717.  http://dx.doi.org/10.17159/2411-9717/2017/v117n4a9.

Both Polish and European hard coal mining nowadays faces the need of deepening shafts (significantly in some cases) or extending mining hoists, due to the exploitation of deeper coal deposits. In order to protect the crew working within a shaft, rope safety platforms (artificial shaft bottoms) are employed. Old solutions, based on rigid steel constructions with the external damping layers made of e.g. slag and up to several tens of metres long, are intended to absorb the energy of approximately 5 t mass falling a distance of 700 m. However, current requirements often assume a drop of 20 t to a depth of 1000 m or even more. More modern safety platform structures, made of one or more support rings with steel ropes stretched on them (rope platforms), are more compact (up to 3 m high) and lighter than traditional solutions. Multi-ring rope platforms with additional damping layers filling the empty spaces between the ropes are able to absorb sufficient energy to meet the current requirements. Single- and double-ring platforms have been employed in Poland to absorb the energy of approximately 5 t dropping to a depth of 900 m. They have been developed (and some have already been implemented) by SADEX Ltd. and are protected by various patents and patent applications. This paper presents a design for a triple-ring platform structure with six rope nets. FEM analysis was used to model the performance of the platform. According to the simulation, a 20 t mass falling from 1000 m (>100 m/s) will destroy all the nets, breaking most of the ropes and deforming the support steel boards placed on the nets, but will ultimately be stopped by the platform, as its kinetic energy falls to zero.

Palabras clave : rope safety platform; artificial bottom; underground mining; shaft; mining hoist.

        · texto en Inglés     · Inglés ( pdf )

 

Creative Commons License Todo el contenido de esta revista, excepto dónde está identificado, está bajo una Licencia Creative Commons