SciELO - Scientific Electronic Library Online

 
vol.116 número8Prediction of blast induced ground vibrations in Karoun III power plant and dam: A neural network índice de autoresíndice de materiabúsqueda de artículos
Home Pagelista alfabética de revistas  

Servicios Personalizados

Articulo

Indicadores

Links relacionados

  • En proceso de indezaciónCitado por Google
  • En proceso de indezaciónSimilares en Google

Compartir


Journal of the Southern African Institute of Mining and Metallurgy

versión On-line ISSN 2411-9717
versión impresa ISSN 2225-6253

Resumen

CHUNG, J.; TOPAL, E.  y  GHOSH, A.K.. Where to make the transition from open-pit to underground? Using integer programming. J. S. Afr. Inst. Min. Metall. [online]. 2016, vol.116, n.8, pp.801-808. ISSN 2411-9717.  http://dx.doi.org/10.17159/2411-9717/2016/v116n8a13.

The transition from open pit (OP) to underground (UG) operation is one of the challenging mining engineering issues. Mines that have the potential to transition from OP mining to UG mining will eventually come to a 'transition point' where the decision needs to be taken whether to extend the pit or switch to UG mining. In this paper we present a new integer programming (IP) formulation to obtain the optimal transition point from OP to UG mining. The proposed model is implemented on a three-dimensional (3D) gold deposit and a two-dimensional (2D) case study is used to demonstrate the validity of the model. Due to the large number of variables, strategies are proposed to shorten the solution time. The proposed model has successfully determined the optimal transition point and generated a significantly better undiscounted profit than that of the traditional approach.

Palabras clave : open pit; underground; transition point; mine optimization; integer programming.