SciELO - Scientific Electronic Library Online

 
vol.116 issue3Optimization of mill performance by using online ball and pulp measurementsThe effect of grinding media performance on milling and operational behaviour author indexsubject indexarticles search
Home Pagealphabetic serial listing  

Services on Demand

Article

Indicators

Related links

  • On index processCited by Google
  • On index processSimilars in Google

Share


Journal of the Southern African Institute of Mining and Metallurgy

On-line version ISSN 2411-9717
Print version ISSN 2225-6253

Abstract

RAHMANPOUR, M.  and  OSANLOO, M.. Determination of value at risk for long-term production planning in open pit mines in the presence of price uncertainty. J. S. Afr. Inst. Min. Metall. [online]. 2016, vol.116, n.3, pp.229-236. ISSN 2411-9717.  http://dx.doi.org/10.17159/2411-9717/2016/v116n3a3.

Mine planning is a multidisciplinary procedure that aims to guarantee the profitability of a mining operation in changing and uncertain conditions. Mine plans are normally classified as long-term, intermediate-term, and short-term plans, and many factors affect the preciseness of these plans and cause deviations in reaching the objectives. Commodity price is the heart of mine planning, but it has a changing and uncertain nature. Therefore, the determination of mine plans in the presence of uncertain mineral price is a challenge. A robust mine plan reduces the risk of early mine closure. A procedure is presented to determine the value at risk (VaR) in any possible mine planning alternative. VaR is considered together with downside risk and upside potential in order to select the most profitable and least risky plan. The model is tested on a small iron ore deposit.

Keywords : mine planning; value at risk; downside risk; upside potential; price uncertainty.

        · text in English     · English ( pdf )

 

Creative Commons License All the contents of this journal, except where otherwise noted, is licensed under a Creative Commons Attribution License