SciELO - Scientific Electronic Library Online

 
vol.109 número2 índice de autoresíndice de assuntospesquisa de artigos
Home Pagelista alfabética de periódicos  

Serviços Personalizados

Artigo

Indicadores

Links relacionados

  • Em processo de indexaçãoCitado por Google
  • Em processo de indexaçãoSimilares em Google

Compartilhar


Journal of the Southern African Institute of Mining and Metallurgy

versão On-line ISSN 2411-9717
versão impressa ISSN 2225-6253

Resumo

GHOLAMNEJAD, J.. Incorporation of rehabilitation cost into the optimum cut-off grade determination. J. S. Afr. Inst. Min. Metall. [online]. 2009, vol.109, n.2, pp.89-94. ISSN 2411-9717.

Determination of the optimum cut-off grades is one of the most important aspects of mine production planning. A cut-off is a grade below which we choose not to process material. This material is treated as waste and dumped. Dumping waste is accompanied by the rehabilitation cost which will affect the overall cost of final production and also the optimum cut-off grade. Rehabilitation cost is the cost per ton of rehabilitating material of a particular type of rock after it has been dumped as waste. One of the most popular algorithms for determination of the optimum cut-off grade is Lane's method. Lane formulated the cut-off grade ptimization, but he did not consider rehabilitation cost during the optimization process. This cost item should be evaluated first, and then considered during the cut-off grade optimization process. In this paper the rehabilitation cost is inserted directly into the cut-off grade optimization process using Lane's theory. The cut-off grades obtained using the suggested method will be more realistic than ones using the original form of Lane's formulations.

        · texto em Inglês     · Inglês ( pdf )

 

Creative Commons License Todo o conteúdo deste periódico, exceto onde está identificado, está licenciado sob uma Licença Creative Commons