SciELO - Scientific Electronic Library Online

 
vol.19 issue2 author indexsubject indexarticles search
Home Pagealphabetic serial listing  

Services on Demand

Article

Indicators

Related links

  • On index processCited by Google
  • On index processSimilars in Google

Share


South African Journal of Industrial Engineering

On-line version ISSN 2224-7890
Print version ISSN 1012-277X

Abstract

ADEYEYE, A.D.  and  CHARLES-OWABA, O.E.. Goal programming model for production planning in a toothpaste factory. S. Afr. J. Ind. Eng. [online]. 2008, vol.19, n.2, pp.197-209. ISSN 2224-7890.

Die GP-model is ontwikkel vir die beplanning van produksie van 'n tandepastafabriek. Twee doelwitte is gestel w die beplanning naamlik minimisering van produksiekoste, en maksimering van prosesbesetting. Wanneer minimisering van koste gebruik word as eerste prioriteit is die besettingswaardes van prosesseringaanleg 1 20.32% en van vulmasjien 2 0.18%. Wanneer prosesbesetting gebruik word as eerste prioriteit neem die proseskoste toe met 7.55% en styg die prosesbesetting. Vulmasjien 1 se gevolglike besetting was 43.85%.

        · abstract in English     · text in English     · English ( pdf )

 

Creative Commons License All the contents of this journal, except where otherwise noted, is licensed under a Creative Commons Attribution License