SciELO - Scientific Electronic Library Online

 
vol.118 issue3Breakage mechanisms and an encouraging correlation between the Bond parameters and the friability value author indexsubject indexarticles search
Home Pagealphabetic serial listing  

Services on Demand

Journal

Article

Indicators

    Related links

    • On index processCited by Google
    • On index processSimilars in Google

    Share


    Journal of the Southern African Institute of Mining and Metallurgy

    On-line version ISSN 2411-9717Print version ISSN 2225-6253

    Abstract

    BUTLER, T.  and  SIMSER, B.. Early access microseismic monitoring using sensors installed in long boreholes. J. S. Afr. Inst. Min. Metall. [online]. 2018, vol.118, n.3, pp.251-257. ISSN 2411-9717.  https://doi.org/10.17159/2411-9717/2018/v118n3a8.

    For deep mines where a microseismic monitoring programme will be implemented, one of the obstacles during the early stages of mine development is how to obtain adequate three-dimensional microseismic monitoring coverage with minimal access to the rock volume. The ability to utilize existing or planned exploration or geological boreholes for seismic sensor placement is offered as a cost-effective solution to this problem. For existing mines planning to mine new, deeper ore zones, the ability to install seismic sensors in long boreholes is especially important where long ramps are being developed in high-stress/burst-prone ground where rockbursting could be expected and microseismic monitoring is required as part of a comprehensive ground control safety programme. Lessons learned from the installation and operation of seismic systems at Glencore's Nickel Rim South and Fraser Morgan mines are presented and suggested strategies for establishing new seismic monitoring systems at new mines are discussed. A case study is presented from Glencore's Nickel Rim Deep Project in Sudbury, Ontario, Canada showing how seismic sensors installed in subhorizontal geological 'scout-holes' drilled ahead of the ramp development end are being used for monitoring ramp and infrastructure development of a new mining zone in deep high-stress ground.

    Keywords : microseismicity; three-dimensional monitoring; longhole sensors.

            · text in English     · English ( pdf )