SciELO - Scientific Electronic Library Online

 
vol.110 issue4Optimizing yield of metallic zinc tapped from a zinc smelter by studying factors causing zinc losses to dross author indexsubject indexarticles search
Home Pagealphabetic serial listing  

Services on Demand

Journal

Article

Indicators

    Related links

    • On index processCited by Google
    • On index processSimilars in Google

    Share


    Journal of the Southern African Institute of Mining and Metallurgy

    On-line version ISSN 2411-9717Print version ISSN 2225-6253

    Abstract

    NEALE, A.M.. Blast optimization at Kriel Colliery. J. S. Afr. Inst. Min. Metall. [online]. 2010, vol.110, n.4, pp.161-168. ISSN 2411-9717.

    Kriel Colliery has experienced some sub-standard blast results on the overburden. Blast results are considered poor when the fragmentation is too big, back break into the new highwall, capping is experienced and/or excess overburden material is thrown into the void. Poor blasting leads to lower productivity, equipment breakdowns, and poor drilling and blasting results on the adjacent blast, contamination of coal or loss of coal. A simulation was developed in Microsoft Excel to model blasting results while changing various parameters. From the simulation results, it could be seen that a change of blast design could be beneficial. As an example, smaller drilling patterns were simulated (10 m x 10 m to 8 m x 8 m, and 8 m x 8 m to 7 m x 7 m in Pit 5 and Pit 6 respectively) in combination with changes in explosives (P700 emulsion vs. ANFO) and drill bit diameter (311mm vs. 251mm). The results show that each of the options has a specific scenario that will be most beneficial to the mine. These results are quite specific and subject to variable inputs. The purpose of the example is to demonstrate how the simulation can be used as a tool to asses blast design variations

            · text in English     · English ( pdf )