South African Journal of Industrial Engineering, Volume: 34, Issue: 2, Published: 2023South African Journal of Industrial Engineering, Volume: 34, Issue: 2, Published: 2023
| Documents |
|---|
|
General Articles Development of a maintenance possession scheduler for a railway Cillié, D. J.Bekker, None Abstract in English: Maintenance of rail infrastructure is an important element in rail operations to keep traffic moving. However, maintenance causes infrastructure to be taken out of service, which impacts traffic flow. In this study, the requirements of a maintenance possession scheduler for a South African application were investigated and a proposed solution was developed. The main objective of the scheduler was to minimise the deviation of the train service on a subset of rail infrastructure while ensuring that the required maintenance was done. An application case -the railway infrastructure between Bellville and Wellington in the Western Cape province of South Africa - was identified. A novel mixed-integer linear programming model that could do possession scheduling for 24 hours on a microscopic level was formulated for this case, and implemented in the software Cplex, after which it was validated. Finally, several experiments were conducted to investigate the model's performance and the results. It was found that the model delivered optimal results in less than nine minutes, which makes it a feasible maintenance possession scheduler for day-to-day work in the immediate planning horizon.Abstract in af: Instandhouding van spoorinfrastruktuur is 'n belangrike element in spoorwegoperasies ten einde verkeervloei te verseker. Instandhouding veroorsaak egter dat infrastruktuur uit diens geneem word wat verkeer weer belemmer. In hierdie studie was die vereistes van 'n besitskeduleerder vir instandhouding vir 'n Suid-Afrikaanse toepassing ondersoek, en die voorgestelde oplossing was daarna ontwikkel. Die hoofdoelwit van die skeduleerder was om die afwykings van die treindiens te minimeer op 'n gedeelte van spoorinfrastruktuur terwyl verseker word dat die nodige instandhouding gedoen word. 'n Gevallestudie vir toepassing van 'n besitskeduleerder vir instandhouding is identifiseer as die spoorweginfrastruktuur tussen Bellville en Wellington in die Wes-Kaap provinsie van Suid-Afrika. 'n Nuwe gemengde heeltal-lineêre programmeringmodel was geformuleer vir hierdie gevallestudie en in die programmatuur Cplex implementeer, waarna dit gevalideer is. Die model kan besitskedulering vir 24 uur doen op mikrovlak. Verskeie eksperimente is uitgevoer om die prestasie en resultate van die model waar te neem. Dit is bevind dat die model optimale resultate in minder as nege minute kon lewer, wat dit 'n aanvaarbare instandhouding besitskeduleerder maak vir dag-tot-dag werk in die nabye beplanningshorison. |
|
General Articles Applying dematel to discuss key factors in shaping organisational culture of lean management Lu, M.L. Fan, P.H. Abstract in English: This study aimed to discuss the factors in shaping organisational culture when an organisation promotes lean management. It also aimed to explore which factors are critical among these factors. This study applied a survey questionnaire methodology, and obtained the consent of ten experts and scholars through purposive sampling. The survey was implemented by respondents completing the questionnaires themselves or through telephone interviews. The data were analysed by applying a decision-making trial and evaluation laboratory to understand the degree of causality and correlation between the criteria. According to the data analysis results, three dimensions - 'Lean management has substantial benefits', 'Prevent process waste', and 'Implement lean management programmes and activities/methods and tools' - had the highest degree of correlation; and three dimensions - 'Lean management has substantial benefits', 'Base your management decisions on a longterm philosophy', and 'Prevent process waste' - had the highest degree of causality. Together these dimensions formed the group of causes. However, the degree of causality of 'Lean management has substantial benefits' was far greater than that of the other dimensions. This indicated its significance and influence. The degree of causality of 'Implement lean management programmes and activities/methods' was far less than that of the other dimensions, indicating that this dimension was the effect and was influenced by the other five dimensions. Overall, 'Lean management has substantial benefits' was the most critical factor with the highest degree of causality and correlation. Regarding management implications, a business organisation must encourage its members to regard this dimension as the most critical element when it promotes and shapes the organisational culture of lean management.Abstract in af: Hierdie studie het ten doel gehad om die faktore in die vorming van organisasiekultuur te bespreek wanneer 'n organisasie lenige bestuur bevorder, asook om te ondersoek watter faktore van hierdie faktore van kritieke belang is. Hierdie studie het 'n opnamevraelysmetodologie toegepas en die terugvoer van tien kundiges verkry deur doelgerigte steekproefneming. Die opname is geïmplementeer deur skriftelike vraelyste het of telefoniese onderhoude. Die data is ontleed deur 'n besluitnemingsproef en evaluering toe te pas om die mate van oorsaaklikheid en korrelasie tussen die kriteria te verstaan. Volgens die data-analise resultate het drie dimensies - 'Lenige bestuur het aansienlike voordele', 'Voorkom prosesvermorsing', en 'Implementeer lenige bestuursprogramme en aktiwiteite/metodes en gereedskap' - die hoogste graad van korrelasie gehad; en drie dimensies - Lenige bestuur hou aansienlike voordele in', 'Baseer jou bestuursbesluite op 'n langtermynfilosofie', en 'Voorkom prosesvermorsing' - het die hoogste mate van oorsaaklikheid gehad. Saam het hierdie dimensies die groep oorsake gevorm. Die mate van oorsaaklikheid van 'Lenige bestuur het aansienlike voordele' was egter veel groter as dié van die ander dimensies. Dit het die betekenis en invloed daarvan bevestig. Die graad van oorsaaklikheid van 'Implementeer lenige bestuursprogramme en aktiwiteite/metodes' was veel minder as dié van die ander dimensies, wat aandui dat hierdie dimensie die effek was en deur die ander vyf dimensies beïnvloed is.Oor die algemeen was 'Lenige bestuur het aansienlike voordele' die mees kritieke faktor met die hoogste graad van oorsaaklikheid en korrelasie. Wat bestuursimplikasies betref, moet 'n besigheidsorganisasie sy lede aanmoedig om hierdie dimensie as die mees kritieke element te beskou wanneer dit die organisasiekultuur van lenige bestuur bevorder en vorm. |
|
General Articles Project management maturity and project management success in developing countries Pretorius, S. Steyn, H. Bond-Barnard, T.J. Abstract in English: This paper explores whether organisations in a developing country have become more mature over time in their project management practices, and compares the current state to findings from a similar study conducted in 2010. It thus contributes to the scant literature on project management maturity in developing countries. Six hundred responses to a project management maturity questionnaire were used to investigate the perceived project management success of 9 389 projects. The results indicated that the perceived average project management maturity dropped from the 2010 value of 2.88 to 2.64 in 2020. Despite this, most of the projects surveyed were still perceived as successful.Abstract in af: Hierdie artikel ondersoek of organisasies in 'n ontwikkelde land meer volwasse geword het in hulle projekbestuurspraktyke, en vergelyk die huidige situasie met bevindings in 'n soortgelyke studie wat in 2010 onderneem is. Dit dra dus by tot die skaars literatuur rakende projekbestuurvolwassenheid in onwikkelende lande. Seshonderd terugvoere vir 'n projekbestuursvolwassenheid vraelys is gebruik om die projekbestuursukses van 9 389 projekte te ondersoek. Resultate wys dat die gemiddelde waargenome projekbestuursvolwassenheid gedaal het van 2.88 in 2010 tot 2.64 in 2020. Ten spyte hiervan is die meeste projekte steeds as suksesvol beskou. |
|
Case Studies Technology transfer perspectives: the KU Leuven case study Steenkamp, R.J. Abstract in English: The technology transfer office (TTO) is central to the Belgian university KU Leuven Research and Development (LRD) department, and is commendable with respect to the challenges of technology transfer. Together with the current industrial revolution, the case study focuses on a contemporary problem with several dimensions. Background is provided on philosophical perspectives, academic power, technology transfer platforms, and technology readiness. The exemplary characteristics of KU Leuven and evidence of impressive artefacts obtained through personal observation of the LRD are presented. Essentially, the case study explains the primary functions of a multidisciplinary TTO for effective technology transfer to ecosystems, with platforms such as the library, university hospitals, and others.Abstract in af: Die beroepsgerigte gevallestudie omvat die tegnologie-oordrag verskynsel vanuit 'n konseptuele en pragmatiese perspektief. In die soeke na die beste-praktykstandaard vir tegnologie-oordrag is die geval van die Belgiese universiteit KU Leuven se Navorsing en Ontwikkeling (LRD) department as maatstaf gebruik. Die tegnologie-oordragkantoor (TTO) is sentraal tot die Leuven navorsing en ontwikkeling departement (LRD) en is voortreflik met verwysing na die uitdagings van tegnologie-oordrag. Tesame met die industriële revolusie fokus die gevallestudie op 'n kontemporêre multi-dimensionele probleem. Die agtergrond sluit filosofiese perspektiewe in sowel as akademiese mag, tegnologie-oordragplatvorms, en tegnologie gereedheid. Die uitnemende eienskappe van KU Leuven Universiteit en persoonlike observasie van die LRD getuig van verskeie indrukwekkende artefakte. In essensie verduidelik die gevallestudie die primêre funksies van 'n multidissiplinêre TTO vir effektiewe tegnologie-oordrag na ekosisteme met platvorms soos die biblioteek, Universiteit hospitale and andere. |
|
Case Studies Capturing the reality of industry 4.0 readiness dimensions and indicators in a developing country: an analysis of applying I4.0 in Indonesia Hasbullah, H. Bareduan, S.A. Abstract in English: Indonesia has the lowest Industry 4.0 (I4.0) readiness in South East Asia, and uses the INDI 4.0 instrument (Indonesia Industry 4.0 readiness index), which is not as comprehensive and accurate as it could be. An Initial survey confirmed that only 56.86% of respondents agreed that INDI 4.0 accurately measured readiness in manufacturing operations. Unlike the primary I4.0 indices, INDI 4.0 lacks comprehensive I4.0 dimensions and characteristics. This paper aims to identify the dimensions and indicators of I4.0 readiness to enhance INDI 4.0 through an exploratory mixed-method research approach with a multiphase research design. The first phase consisted of a qualitative approach through a documentary review, interviews, and observations to explore the dimensions and indicators of I4.0 readiness. This phase successfully identified four dimensions that experts, academics, and practitioners validated: technology, data life cycle, I4.0 design principles, and smart factory. These dimensions were broken down into 27 indicators of I4.0 readiness, then validated again through a statistical approach before being affirmed by a survey with a Pearson's correlation > 0.361 and Cronbach's alpha of 0.987, which indicated validity and reliability. The second phase, using a quantitative approach through a survey, confirmed the four dimensions and 27 indicators for measuring I4.0 readiness levels; these were 'not ready', 'early stage', 'moderate readiness', 'readiness ripe', and 'already implemented'. This finding comprehensively measured I4.0 readiness based on feedback from industries struggling to adopt I4.0, especially in developing countries such as Indonesia. This finding also differed from existing indices (Acatech, RAMI 4.0, Dreamy, SIMMI 4.0. IMPULS) from developed countries and industries already stable in implementing 14.0.Abstract in af: Indonesië het die laagste industrie 4.0 (14.0) gereedheid in Suidoos-Asië, en gebruik die Indonesië Industrie 4.0 indeks (INDI 4.0) instrument, wat nie so omvattend en akkuraat is as wat dit kan wees nie. 'n Aanvanklike opname het bevestig dat slegs 56,86% van die respondente saamgestem het dat INDI 4.0 die gereedheid in vervaardigingsbedrywighede akkuraat gemeet het. Anders as die primêre I4.0-indekse, het INDI 4.0 nie omvattende I4.0-dimensies en -eienskappe nie. Hierdie artikel het ten doel om die dimensies en aanwysers van I4.0-gereedheid te identifiseer om INDI 4.0 te verbeter deur 'n verkennende gemengde-metode navorsingsbenadering met 'n multifase navorsingsontwerp. Die eerste fase het bestaan uit 'n kwalitatiewe benadering deur 'n literatuur oorsig, onderhoude en waarnemings om die dimensies en aanwysers van 14.0-gereedheid te verken. Hierdie fase het vier dimensies suksesvol geïdentifiseer wat deur kundiges, akademici en praktisyns bevestig is: tegnologie, datalewensiklus, I4.0-ontwerpbeginsels en slim fabriek. Hierdie dimensies is opgebreek in 27 aanwysers van I4.0 gereedheid, dan weer bekragtig deur 'n statistiese benadering voordat dit bevestig is deur 'n opname met 'n Pearson se korrelasie > 0.361 en Cronbach se alfa van 0.987, wat geldigheid en betroubaarheid aangedui het. Die tweede fase, met behulp van 'n kwantitatiewe benadering deur 'n opname, het die vier dimensies en 27 aanwysers vir die meting van I4.0-gereedheidsvlakke bevestig; dit was 'nie gereed', 'vroeë stadium', 'matige gereedheid', 'gereedheid ryp', en 'reeds geïmplementeer'. Hierdie bevinding het I4.0-gereedheid omvattend gemeet op grond van terugvoer van nywerhede wat sukkel om I4.0 aan te neem, veral in ontwikkelende lande soos Indonesië. Hierdie bevinding het ook verskil van bestaande indekse (Acatech, RAMI 4.0, Dreamy, SIMMI 4.0. IMPULS) van ontwikkelde lande en nywerhede wat reeds stabiel is in die implementering van I4.0. |
|
Case Studies Assessing organisations' readiness to adopt green information technology: the case of a South African information technology services vendor Muranganwa, I. R.Naidoo, None Abstract in English: Green information technology (IT) adoption is an important topic in the fields of information systems, business sustainability, and corporate social responsibility. This case study applies the green IT adoption model (GITAM) to perform a systematic and qualitative readiness assessment at a major South African IT services vendor. Thematic data analysis was used to analyse the data collected from managers and specialist IT staff. The assessment revealed that the main organisational adoption readiness barriers were the lack of a formal green IT policy, an unclearly defined green IT governance framework, and a lack of green performance management. The main drivers of adoption were economic imperatives and regulatory and ethical requirements. Interestingly, a contextual variable - an exogenous shock caused by COVID-19 and the robustness of the organisation's crisis response during the pandemic -rapidly increased the rate of green IT adoption at the firm.Abstract in af: Aanneming van groen inligtingstegnologie (IT) is 'n belangrike onderwerp op die gebied van inligtingstelsels, besigheidsvolhoubaarheid en korporatiewe sosiale verantwoordelikheid. Hierdie gevallestudie pas die groen IT-aannemingsmodel (GITAM) toe om 'n sistematiese en kwalitatiewe gereedheidsbeoordeling by 'n groot Suid-Afrikaanse IT-diensverskafferorganisasie uit te voer. Tematiese data-analise is gebruik om die data wat van bestuurders en spesialis IT-personeel ingesamel is, te ontleed. Die assessering het aan die lig gebring dat die vernaamste hindernisse vir organisatoriese aanvaardingsgereedheid die gebrek aan 'n formele groen IT-beleid, 'n onduidelik gedefinieerde groen IT-bestuursraamwerk en 'n gebrek aan groen prestasiebestuur was. Die belangrikste dryfvere van aanneming was ekonomiese imperatiewe en regulatoriese en etiese vereistes. Interessant genoeg het 'n kontekstuele veranderlike - 'n eksogene skok veroorsaak deur COVID-19 en die robuustheid van die organisasie se krisisreaksie tydens die pandemie -die tempo van groen IT-aanneming by die firma vinnig laat toeneem. |
|
Case Studies Lean Six Sigma methodology to reduce excess wastage in a brickyard: a case study Quiroz-Flores, J.C. Varas, I.F. Ali, A. Abstract in English: Peruvian companies' craft brick stands currently experience significant growth in sales. Thus brickyards seek to reduce the amount of waste to increase productivity and reduce cost overruns. In this study, the problem that has the greatest economic impact on a brick company is the excessive amount of waste. For this reason, the implementation of a model based on the Lean Six Sigma (LSS) methodology is proposed, applying Poka Yoke, Jidoka, Standardised Work, and Just in Time in order to reduce the number of defective bricks and cost overruns. The research project focused on the tambourine brick, the type whose percentage of generated waste is the highest in the production batch. To do this, the current situation was analysed; the main causes of the problem were identified and measured; and then Lean Six Sigma tools were used to attack the root cause. Finally, the proposed design reduced overheated bricks by 2.36%, wet bricks by 2.01%, and poorly stacked bricks by 1.8%, obtaining a 6.92% reduction in shrinkage and increasing the level of Six Sigma to 3.9, which contributed to the reduction of losses in the brickyard.Abstract in af: Tans ervaar Peruaanse handwerkbaksteenmaatskappye aansienlike groei in verkope. Daarom poog die steenwerwe om die hoeveelheid afval te verminder om produktiwiteit te verhoog en koste-oorskryding te verminder. In hierdie studie is die probleem wat die grootste ekonomiese impak vir die baksteenmaatskappy genereer die oormatige hoeveelheid afval. Om hierdie rede word die implementering van 'n model gebaseer op die Lean Six Sigma metodologie voorgestel, deur die toepassing van Poka Yoke, Jidoka, Standardised Work en Just in Time, met die doel om die aantal gebrekkige stene en koste-oorskryding te verminder. Die navorsingsprojek fokus op die tipe tamboerynsteen waarvan die persentasie afval wat gegenereer word die hoogste van sy produksiegroep is. Om dit te doen, is die huidige situasie ontleed, waar die hoofoorsake van die probleem geïdentifiseer en gemeet is, en daarna is Lean Six Sigma-instrumente gebruik om die hoofoorsaak aan te pak. Laastens verminder die voorgestelde ontwerp oorverhitte stene met 2.36%, nat stene met 2.01%, en swak gestapelde stene met 1.8%, wat 'n vermindering van 6.92% in krimping verkry en die vlak van Six Sigma tot 3.9 verhoog, wat bygedra het tot die vermindering van verliese in die baksteenwerf. |
|
Case Studies Investigating the technological growth of the drone industry in South Africa Mokoena, Q. Daniyan, I.A. Mpofu, K. Abisuga, O.A. Abstract in English: The regulation of drones is a huge challenge for most countries around the world. The regulation and application processes are as much a challenge in South Africa as they are elsewhere. The number of drones is growing at a rapid pace, and there is a need to improve the current status to benefit from the technology. The purpose of this paper is to evaluate the South African drone industry and to propose recommendations to enhance drone technology in South Africa. The research design applied in this paper was qualitative. Data was collected by interviewing drone operators who were interested in participating in this study. This was done to understand the drone approval process in South Africa and the perceptions of drone operators. The results indicated that commercial drone operators are being negatively impacted by the drone approval structure in South Africa and that it is holding the industry back. Key factors affecting the existing drone approval structure were identified and used to propose the strategies for improvement. The findings in this study could assist stakeholders in the South African drone industry to make effective decisions and to formulate policies that would promote the technological growth of the industry.Abstract in af: Die regulering van hommeltuie is 'n groot uitdaging vir die meeste lande regoor die wêreld. Die regulering en aansoekprosesse is net so 'n uitdaging in Suid-Afrika as elders. Die aantal hommeltuie groei vinnig, en daar is 'n behoefte om die huidige situasie te verbeter om voordeel te trek uit die tegnologie. Die doel van hierdie artikel is om die Suid-Afrikaanse hommeltuigbedryf te evalueer en om aanbevelings voor te stel om hommeltuigtegnologie in Suid-Afrika te verbeter. Die navorsingsontwerp wat in hierdie artikel toegepas is, was kwalitatief. Data is ingesamel deur onderhoude te voer met hommeltuigoperateurs wat belangstel om aan hierdie studie deel te neem. Dit is gedoen om die hommeltuiggoedkeuringsproses in Suid-Afrika en die persepsies van hommeltuigoperateurs te verstaan. Die resultate het aangedui dat kommersiële hommeltuigoperateurs negatief geraak word deur die hommeltuiggoedkeuringstruktuur in Suid-Afrika en dat dit die bedryf terughou. Sleutelfaktore wat die bestaande hommeltuiggoedkeuringstruktuur beïnvloed, is geïdentifiseer en gebruik om die strategieë vir verbetering voor te stel. Die bevindinge in hierdie studie kan belanghebbendes in die Suid-Afrikaanse hommeltuigbedryf help om effektiewe besluite te neem en om beleide te formuleer wat die tegnologiese groei van die bedryf sal bevorder |
|
Case Studies An allocation model framework for a capacity-constrained port: a case for citrus exports at the port of Durban Darley-Waddilove, J. Goedhals-Gerber, L. Engelmohr Thiart, J. Abstract in English: This article investigates the viability of using forced allocation as a mechanism to alleviate capacity challenges through scenarios of varying allowable citrus throughput at the Port of Durban. Rule-based resource allocation techniques are used to divide the allowable citrus throughput at the constrained port between production regions by setting quotas. The allocation model framework minimises the impact of the forced allocation on the citrus export cold chain by setting the quotas as constraints in an integer programming (IP) formulation of a minimum cost transportation problem (TP) for the system. The results show that forced allocation is feasible under at least one resource allocation technique for four of the scenarios tested.Abstract in af: Hierdie artikel ondersoek die lewensvatbaarheid van gedwonge toewysing as 'n meganisme om, deur scenario's van wisselende toelaatbare sitrusdeurvloei by die Durban hawe, kapasiteitsuitdagings te verlig. Reëlgebaseerde hulpbrontoekenningstegnieke word gebruik om die toelaatbare sitrusdeurvloei by die ingeperkte hawe tussen produksiestreke te verdeel deur kwotas vas te stel. Die toekenningsmodelraamwerk minimeer die impak van die gedwonge toekenning op die sitrusuitvoerkoelketting deur die kwotas te stel as beperkings in 'n heeltalligeprogrammering (HP) formulering van 'n minimum koste vervoerprobleem (VP) vir die stelsel. Die resultate toon dat gedwonge toekenning haalbaar is onder ten minste een van die hulpbrontoekenningstegnieke vir vier van die scenario's wat getoets is. |
|
Case Studies Improving energy usage in commercial buildings using Six Sigma DMAIC Kanyinda, K. Lazarus, I.J. Olanrewaju, O.A. Abstract in English: This article describes the energy-saving measures in commercial buildings from different perspectives on energy saving in cities. In recent years, improving energy conservation in commercial buildings has become an issue of great importance for the financial well-being of organisations. The study uses the define-measure-analyze-improve-control (DMAIC) Six Sigma approach to identify the factors that contribute to increases in electricity consumption. With the increasing shortage of energy, two years' worth of energy consumption data from a commercial building in South Africa was collected and analyzed using statistical tools. The research findings revealed that the boiler had the highest electricity consumption (38.33 per cent), followed by the kitchen (24.20 per cent) and the rest of the building (37.47 per cent). After applying the DMAIC process, it showed that the electricity consumption of the boiler could be reduced by 6 per cent during the improvement phase.Abstract in af: Hierdie artikel beskryf die energiebesparingsmaatreëls in kommersiële geboue vanuit verskillende perspektiewe op energiebesparing in stede. In onlangse jare het die verbetering van energiebesparing in kommersiële geboue 'n kwessie van groot belang geword vir die finansiële welstand van organisasies. Die studie gebruik die definieer-meet-ontleed-verbeter-beheer (DMAIC) Six Sigma-benadering om die faktore te identifiseer wat bydra tot toenames in elektrisiteitsverbruik. Met die toenemende tekort aan energie is twee jaar se energieverbruikdata van 'n kommersiële gebou in Suid-Afrika ingesamel en met behulp van statistiese instrumente ontleed. Die navorsingsbevindinge het aan die lig gebring dat die waterverwarmingstelsel die hoogste elektrisiteitsverbruik het (38,33 persent), gevolg deur die kombuis (24,20 persent) en die res van die gebou (37,47 persent). Nadat die DMAIC-proses toegepas is, het dit gewys dat die elektrisiteitsverbruik van die waterverwarmingstelsel tydens die verbeteringsfase met 6 persent verminder kan word. |
|
Case Studies The application of Six Sigma to improve the yield of plastic injection molding Hsiao, C.T. Lin, C.P. Fan, P.H. Abstract in English: Plastic injection molding has complex process parameters. The Six Sigma improvement method mainly uses quality control and statistical methods to improve product quality, so as to reduce the cost and waste caused by defective products. Taiwan is the world leader for original equipment manufacturing in the laptop industry, and related peripheral accessories are also a major concern of customers. The subject of this study was a professional supplier of laptop batteries. Through the collection of customer complaint data, it was found that battery case deformation was the most important problem for customers. Therefore, in order to remain competitive, the battery case deformation problem needed to be overcome first. Enterprises need to improve their existing processes to reduce the rate of product defects, improve output efficiency and product quality, and reduce production costs, so as to improve their competitiveness in the industry.This study took a Taiwanese company as an example to improve the plastic injection process through the improvement steps of Six Sigma. In this process, two key process factors, namely the injection speed and the cooling time, were identified by analytical tools. After calculating customers' daily product demand, the most suitable parameters were found using the 'design of experiments' method. The results showed that the process capacity and product yield could be significantly improved. The key to the success of this Six Sigma project was the project implementer's design of the experiment.Abstract in af: Plastiek spuitgietwerk het komplekse prosesparameters. Die Six Sigma-verbeteringsmetode gebruik hoofsaaklik kwaliteitsbeheer en statistiese metodes om produkkwaliteit te verbeter, om sodoende die koste en vermorsing wat deur gebrekkige produkte veroorsaak word, te verminder. Taiwan is die wêreldleier vir die vervaardiging van oorspronklike toerusting in die skootrekenaarbedryf, en verwante randtoebehore is ook 'n groot bekommernis van kliënte. Die onderwerp van hierdie studie was 'n professionele verskaffer van skootrekenaarbatterye. Deur die insameling van kliënteklagtedata is gevind dat batterykasvervorming die belangrikste probleem vir kliënte was. Daarom, om mededingend te bly, moes die batterykas-vervormingsprobleem eers oorkom word. Ondernemings moet hul bestaande prosesse verbeter om die tempo van produkdefekte te verminder, uitsetdoeltreffendheid en produkkwaliteit te verbeter, en produksiekoste te verminder, om hul mededingendheid in die bedryf te verbeter. Hierdie studie het 'n Taiwanese maatskappy as 'n voorbeeld geneem om inspuitingsproses van die plastiek te verbeter deur die verbeteringstappe van Six Sigma. In hierdie proses is twee sleutelprosesfaktore, naamlik die inspuitspoed en die verkoelingstyd, deur analitiese instrumente geïdentifiseer. Nadat klante se daaglikse produkaanvraag bereken is, is die mees geskikte parameters gevind deur die 'ontwerp van eksperimente'-metode te gebruik. Die resultate het getoon dat die proseskapasiteit en produkopbrengs aansienlik verbeter kan word. Die sleutel tot die sukses van hierdie Six Sigma-projek was die projekimplementeerder se ontwerp van die eksperiment. |
|
Editorial Note from the editor Schutte, Corne |