Open-access Heuristics for minimizing the number of tardy jobs on a single machine with release time

This paper considers the problem of minimizing the number of tardy jobs with release time on a single machine. Given that the problem has been classified as strongly NP-Hard, three heuristics (EOO, HR2, and HR3) are proposed for this problem. They are compared with a heuristic by Dauzere-Perez (selected from the literature). Randomly-generated problems ranging from 3 to 500 jobs are solved. Experimental results show that one of the proposed heuristics (EOO) outperforms other heuristics, both in terms of quality of solution (effectiveness) and speed of execution (efficiency).


location_on
The Southern African Institute for Industrial Engineering The Southern African Institute for Industrial Engineering, P.O. Box 96002, Waterkloof, Pretoria, Gauteng, ZA, 0145, Tel: +27 12 420 6478 - E-mail: admin@saiie.co.za
rss_feed Stay informed of issues for this journal through your RSS reader
Go to top