Open-access Concurrent engineering model (CEM) analysis on logistics design parameters - A case study

Logistics engineering can be divided into internal or in-plant logistics and external manufacturing logistics. Internal (in-plant) logistics include material handling, warehousing, and storage systems, while external manufacturing logistics include transportation. Both must be integrated to minimise costs at a competitive level of service. For example, plant layout and production planning must consider internal logistics. The design decisions are made in the early phases of product design, and development will have a significant effect over future manufacturing and logistical activities. In this paper, a methodology is developed and presented to minimise the design cycle time of any manufacturing firm, including their suppliers, and to maximise the whole system's effectiveness.


Logistieke ingenieurswese kan verdeel word in interne of binne-aanleg logistiek en eksterne vervaardigingslogistiek. Interne (binne-aanleg) logistiek behels materiaalhantering, berging en voorraadhoudingsisteme, terwyl eksterne vervaardigingslogistiek vervoer insluit. Die fasette moet geintegreer wees om koste te minimiseer by 'n mededingende diensvlak. So byvoorbeeld moet die uitleg van 'n aanleg en produksiebeplanning interne logistiek in aanmerking neem. Die ontwerpbesluite word geneem in die beginstadium van die produkontwerp en ontwikkeling sal 'n betekenisvolle invloed hê op toekomstige vervaardigings- en logistieke aktiwiteite. In hierdie artikel word 'n metodologie ontwikkel en aangebied om die ontwerpsiklustyd van enige vervaardigingsonderneming te minimiseer met inagneming van die leweransiers om sodoende die totale sisteem se effektiwiteit te maksimiseer.


Concurrent engineering model (CEM) analysis on logistics design parameters - A case study

J.S. GnanasekaranI; S. ShanmugasundaramII

IDepartment of Mechanical Engineering, Sri Krishna College of Engineering and Technology, India
IIDepartment of Mechanical Engineering, Government College of Technology, India

ABSTRACT

Logistics engineering can be divided into internal or in-plant logistics and external manufacturing logistics. Internal (in-plant) logistics include material handling, warehousing, and storage systems, while external manufacturing logistics include transportation. Both must be integrated to minimise costs at a competitive level of service. For example, plant layout and production planning must consider internal logistics. The design decisions are made in the early phases of product design, and development will have a significant effect over future manufacturing and logistical activities. In this paper, a methodology is developed and presented to minimise the design cycle time of any manufacturing firm, including their suppliers, and to maximise the whole system's effectiveness.

OPSOMMING

Logistieke ingenieurswese kan verdeel word in interne of binne-aanleg logistiek en eksterne vervaardigingslogistiek. Interne (binne-aanleg) logistiek behels materiaalhantering, berging en voorraadhoudingsisteme, terwyl eksterne vervaardigingslogistiek vervoer insluit. Die fasette moet geintegreer wees om koste te minimiseer by 'n mededingende diensvlak. So byvoorbeeld moet die uitleg van 'n aanleg en produksiebeplanning interne logistiek in aanmerking neem. Die ontwerpbesluite word geneem in die beginstadium van die produkontwerp en ontwikkeling sal 'n betekenisvolle invloed hê op toekomstige vervaardigings- en logistieke aktiwiteite. In hierdie artikel word 'n metodologie ontwikkel en aangebied om die ontwerpsiklustyd van enige vervaardigingsonderneming te minimiseer met inagneming van die leweransiers om sodoende die totale sisteem se effektiwiteit te maksimiseer.

“Full text available only in PDF format”  

Books

REFERENCES

  • [1] Ballou, R.H. 1987. Basic business logistics. 2nd edition. Englewood Cliffs, New Jersey: Prentice Hall.
  • [2] Blanchard, B.S. 2000. Logistics engineering and management. New Delhi: Prentice-Hall, Inc.
  • [3] Prasad, B. 1996. Concurrent engineering fundamentals in integrated product development, Vol. II. Upper Saddle River, NJ: PTR Prentice-Hall.
  • [4] Blanchard, B.S. and Fabrycky, W.J. 1998. Systems engineering and analysis. (3rd edition. Upper Saddle River, NJ: Prentice Hall.
  • [5] Christopher, M. 1998. Logistics and supply chain management Delhi: Pearson Education, Inc.
  • Articles
  • [6] Kusiak, A. 2000. Data analysis: Models and algorithms. Proceedings of the SPIE Conference on Intelligent Systems and Advanced Manufacturing, P.E. Orban and G.K. Knopf (eds), SPIE, Vol. 4191, Boston, MA, November 2000, pp. 1-9.
  • [7] Kusiak, A. and Huang, C. 1997. Design of modular digital circuits for testability, IEEE Transactions on Components, Packaging and Manufacturing Technology, Part C, Vol. 20, No.1.
  • [8] Gnanasekaran, J.S. and Shanmugasundaram, S. 2002. Optimization in designing for logistics support: A concurrent engineering approach. Proceedings of International Conference on E-manufacturing, India, pp. 359-365.
  • [9] Gnanasekaran, J.S. and Shanmugasundaram, S. 2003. Concurrent engineering approach for modeling to the logistics, Proceedings of International Conference on Mechanical Engineering, Dhaka, Bangladesh, ICME2003-AM-31.
  • [10] Gnanasekaran, J.S. and Shanmugasundaram, S. 2004. Pioneer-manufacturing achievements through concurrent engineering. International Mechanical Engineering Conference (IMEC-2004), Kuwait, December 5-8, 2004.
  • [12] Gnanasekaran, J.S. and Shanmugasundaram, S. 2007. Logistics integrated product design under concurrent engineering environment. International Conference on Manufacturing Engineering and Engineering Management (ICMEEM 2007) under World Congress on Engineering (WCE 2007), London, U.K., July 2-4, 2007.
  • [13] McCormick, W.T. Jr., Schweitzer, P.J. and White, T.W. 1972. Problem decomposition and data reorganization by a clustering technique. Operations Research 20 (5), pp. 993-1009.
  • [14] Kovaicheliyan, V. 1999. Concurrent engineering experience of Indian companies. A Cover Story, The Machinist, May-June, pp. 8-14.
  • [15] Zangwill, W.I. 1992. Concurrent engineering concepts and implementation. Engineering Management Review, Winter, pp. 40-52.

Publication Dates

  • Publication in this collection
    29 Jan 2015
  • Date of issue
location_on
The Southern African Institute for Industrial Engineering The Southern African Institute for Industrial Engineering, P.O. Box 96002, Waterkloof, Pretoria, Gauteng, ZA, 0145, Tel: +27 12 420 6478 - E-mail: admin@saiie.co.za
rss_feed Stay informed of issues for this journal through your RSS reader
Go to top