Open-access Solving a novel multi-skilled project scheduling model by scatter search

Abstract

A multi-skilled project scheduling problem (MSPSP) has generally been presented to schedule information technology projects in deterministic conditions. The contribution of this model is to consider the resources, called 'staff members'. These members are regarded as valuable, renewable, and discrete resources with different multiple skills. The different skills of staff members, as well as the project network's activity requirement of different skills, cause this problem to become a special type of multi-mode resource-constrained project scheduling problem (MM-RCPSP), with a huge number of modes. Taking into account the importance of this issue and the few studies performed on this problem, a novel mathematical model for the MSPSP is presented. Since the complexity of this problem is NP-hard, an efficient scatter search (SS) algorithm is developed to solve such a difficult problem. This proposed SS is capable of generating optimised solutions in small sizes, and the excellent solutions in large sizes are compared with the solutions reported by a proposed Tabu search (TS) algorithm.


location_on
The Southern African Institute for Industrial Engineering The Southern African Institute for Industrial Engineering, P.O. Box 96002, Waterkloof, Pretoria, Gauteng, ZA, 0145, Tel: +27 12 420 6478 - E-mail: admin@saiie.co.za
rss_feed Acompañe los números de esta revista en su lector de RSS
Ir para arriba