Open-access Two-Phase Algorithm to Optimise Energy Resource Allocation in an Electrochemical Company and Task Sequencing: A Case Study

Abstract

The purpose of this article was to optimise the cost of the energy consumption of an industrial complex that was using three energy sources: industrial electricity, natural gas, and solar energy. Before undertaking any optimisation action, we carried out an in-depth examination of the company's energy system. This action was positioned as an essential pivot for collecting energy data according to: Source (gas, electricity); Equipment or production tools; Usage (heating, cooling, lighting, ventilation, etc.). The in-depth examination of the company's energy system made it possible to identify the energy consumption of the equipment and the costs associated with it for a year of operation. With an objective of energy and economic performance, the simplex algorithm was implemented to resolve the energy mix model and machine hours, according to the two-phase technique applied first to the energy problem and second to resolving the time problem.


location_on
The Southern African Institute for Industrial Engineering The Southern African Institute for Industrial Engineering, P.O. Box 96002, Waterkloof, Pretoria, Gauteng, ZA, 0145, Tel: +27 12 420 6478 - E-mail: admin@saiie.co.za
rss_feed Acompañe los números de esta revista en su lector de RSS
Ir para arriba