Open-access Goal programming model for production planning in a toothpaste factory

The GP model was developed for production planning in a toothpaste factory. Two objectives were distinguished: minimization of processing cost, and maximization of the capacity utilization of production facilities. Two priority structures were used to explore the trade-off options. When processing cost minimization was assigned the first priority, the utilizations of Processing Plant 1 and Filling Machine 2 were 20.32% and 0.18% respectively. When capacity utilization was assigned first priority, the processing cost increased by 7.55% but capacity utilization improved. The least utilized facility was Filling Machine 1 with a utilization of 43.85%.


Die GP-model is ontwikkel vir die beplanning van produksie van 'n tandepastafabriek. Twee doelwitte is gestel w die beplanning naamlik minimisering van produksiekoste, en maksimering van prosesbesetting. Wanneer minimisering van koste gebruik word as eerste prioriteit is die besettingswaardes van prosesseringaanleg 1 20.32% en van vulmasjien 2 0.18%. Wanneer prosesbesetting gebruik word as eerste prioriteit neem die proseskoste toe met 7.55% en styg die prosesbesetting. Vulmasjien 1 se gevolglike besetting was 43.85%.


Goal programming model for production planning in a toothpaste factory

A.D. AdeyeyeI; O.E. Charles-OwabaII

IDepartment of Industrial and Production Engineering, University of Ibadan, Ibadan, Nigeria
IIDepartment of Industrial and Production Engineering, University of Ibadan, Ibadan, Nigeria

ABSTRACT

The GP model was developed for production planning in a toothpaste factory. Two objectives were distinguished: minimization of processing cost, and maximization of the capacity utilization of production facilities. Two priority structures were used to explore the trade-off options. When processing cost minimization was assigned the first priority, the utilizations of Processing Plant 1 and Filling Machine 2 were 20.32% and 0.18% respectively. When capacity utilization was assigned first priority, the processing cost increased by 7.55% but capacity utilization improved. The least utilized facility was Filling Machine 1 with a utilization of 43.85%.

OPSOMMING

Die GP-model is ontwikkel vir die beplanning van produksie van 'n tandepastafabriek. Twee doelwitte is gestel w die beplanning naamlik minimisering van produksiekoste, en maksimering van prosesbesetting. Wanneer minimisering van koste gebruik word as eerste prioriteit is die besettingswaardes van prosesseringaanleg 1 20.32% en van vulmasjien 2 0.18%. Wanneer prosesbesetting gebruik word as eerste prioriteit neem die proseskoste toe met 7.55% en styg die prosesbesetting. Vulmasjien 1 se gevolglike besetting was 43.85%.

“Full text available only in PDF format”

REFERENCES

  • [1] Sundraham, R.M. 1988. An application of Goal Programming Technique in metal cutting, International Journal of Production Research, 16(5), pp 375-382
  • [2] Zanakis, S.H. and Smirth, J.S.1980. Chemical production via Goal Programming, International Journal of Production Research,18(16), pp 687-697
  • [3] Zaloom, V., Tolgga, A. and Chu, H. 1986. Bank funds management by Goal Programming, Computer and Industrial Engineering, 11(1-4), pp 132-135
  • [4] Chames, A. and Cooper, W.W. 1962 Management models and industrial applications of linear programming, Vol. 1. New York: Wiley
  • [5] Giannikos, loannis. 1994. A preemptive Goal Programming model for locating obnoxious facilities, Studies in Regional and Urban Planning, 3(1), pp 141- 152
  • [6] Lawrence, K.D. and Burbridge. 1976. A multiple goal linear programming model for coordinated production and logistics planning, International Journal of Production Research, 14(2), pp 215-222
  • [7] Biswas, Animesh and Bijay Baran Pal. 2005. Application of fuzzy goal programming technique to land use planning in an agricultural system. Omega 33(5), pp 391-398
  • [8] Esfandiari, Bijan, Aryanezhad, Mir Bahador, and Abrishamifar, S. Amir. 2004. Open pit optimization including mineral dressing criteria using 0-1 non-linear goal programming: Mining technology, IMM Transactions, Section A, 133(1), pp 3-16
  • [9] Gokcen, Hadi and Agpak, Kursad. 2006. A Goal Programming approach to simple u-line balancing problem. European Journal of Operational Research. 171(2), pp 577-585
  • [10] Baykasoghlu, Adi I. and Tolunay, Gochen. 2006. A Tabu search approach to fuzzy goal programs and an application to aggregate production planning, Engineering Optimization 38(2), pp 155-177
  • [11] Hillier, F. S. and Lieberman, G.J. 1990. Introduction to operation research. McGraw-Hill, pp 267-291

Publication Dates

  • Publication in this collection
    02 Feb 2015
  • Date of issue
location_on
The Southern African Institute for Industrial Engineering The Southern African Institute for Industrial Engineering, P.O. Box 96002, Waterkloof, Pretoria, Gauteng, ZA, 0145, Tel: +27 12 420 6478 - E-mail: admin@saiie.co.za
rss_feed Acompanhe os números deste periódico no seu leitor de RSS
Ir para o topo