Abstract
We have demonstrated that the minimum levelized cost of electricity from a molten salt central receiver plant with a given heliostat field configuration is driven by a single independent variable, namely the thermal energy storage capacity in hours of full time turbine operation. In our model, the solar multiple, number of heliostats and receiver heat flux all depend on the thermal energy storage. The lowest levelized cost corresponds to 14 hours thermal energy storage. The levelized cost for a 100 MWe net plant in Upington, South Africa is expected to come in between 15 ¢/kWhe and 20 ¢/kWhe.
Central receiver; molten salt; levelized cost






