Sumário

Journal of the Southern African Institute of Mining and Metallurgy, Volume: 125, Número: 1, Publicado: 2025

Journal of the Southern African Institute of Mining and Metallurgy, Volume: 125, Número: 1, Publicado: 2025

Document list
Documents
Professional Technical and Scientific Papers
Influence of ground motion model selection on seismic hazard for Johannesburg Manzunzu, B. Durrheim, R.J. Midzi, V.

Resumo em Inglês:

Selecting ground motion prediction models (GMPM) is crucial in assessing seismic hazard levels in a specific region. This study investigates the influence of ground motion model (GMM) selection on seismic hazard assessment in Johannesburg, South Africa. Most seismic events affecting Johannesburg are related to mining activities and water ingress into the underground mine voids. The most seismically active regions in South Africa include areas around Klerksdorp, Welkom, and Carletonville. These regions experience a significant number of earthquakes, with mining activities being a major factor contributing to seismic events. Ten ground motion prediction equations were selected from regions of similar tectonics setting and were assessed to see if they correspond to the available local data. Six of these were also compared to the ground motions produced by the earthquake of 14 August 2014, which occurred in the Orkney area, one of the mining areas in South Africa. Sensitivity analyses were also carried out to assess the influence of ground motion prediction equations (GMPE) on the seismic hazard of Johannesburg. The results indicate that the choice of GMPM significantly affects the estimation of seismic hazard levels in Johannesburg. Different GMM can lead to varying ground shaking intensity predictions, impacting risk assessments and engineering design considerations. The findings highlight the importance of carefully selecting appropriate GMM tailored to Johannesburg's specific geological and tectonic characteristics. Understanding how different models perform in this region is essential for accurate seismic risk mitigation strategies.
Professional Technical and Scientific Papers
Automatic data selection, worker exclusion zones and an attempt to identify precursory activity in real time: Routine and research activities in seismology at Sibanye-Stillwater Ltd Ferreira, R.I.L. Lenegan, P. Masethe, R.

Resumo em Inglês:

Underground mining in high rock-stress environments can induce unanticipated dynamic rockmass deformation, posing a serious risk to the workforce. Data collected by seismic networks are imperative for the design-as-you-mine process. Often an inappropriate assessment of the seismic hazard is done when unnecessary data are included in analytical techniques, particularly short-term time frames. Depending on the methodology or application of data analysis and interpretation, some of the information may not be relevant and even detract from the objective. By using the spatial event clusters associated with active workplaces to define the shape and size of the polygons for data selection for subsequent analysis, a problematic subjective component can be eliminated. The mining of tabular reefs in South Africa, be they gold- or platinum group metals, is very extensive, and underground workplaces are often widespread. Production stoppages are very costly, especially for marginal mines, so there is just cause not to evacuate an entire operation's workforce following the occurrence of a large mining-induced seismic event. A rationale based on the damaging peak particle velocities (PPV) of the past seismicity can exclude the unaffected underground personnel and allow a quick orderly withdrawal where required. Micro-deformation may precede rockbursting, which can occur on-shift close to the workface. A mine-wide array of geophones suitable for the accurate location and analysis of seismicity may not be able to detect these higher-frequency emissions. Inexpensive but fit-for-purpose accelerometers, providing real-time, continuous measurement of acoustic rockmass deformation near the workplace, integrated through underground and surface communications networks, are shown to record 'rock-talk', clearly distinguishable from the instrument background noise, which can be in the order of hours leading up to an imminent damaging seismic event.
Professional Technical and Scientific Papers
Macroseismic survey of the ML 4.4, 11 June 2023 Boksburg earthquake Zulu, B.S. Mulabisana, T. Midzi, V. Myendeki, S. Matlou, T. Makhateng, T. Hlatshwayo, L. Mabotja, H. Zulu, T.

Resumo em Inglês:

The Council for Geoscience (CGS) performed a macroseismic investigation following the occurrence of an earthquake in the Boksburg area on 11 June 2023. The event had a magnitude of ML 4.4 and a focal mechanism that showed the event as having strike-slip motion along a northwest-southeast oriented fault. The event resulted in aftershocks, some of which occurred away from the causative fault in the east in an area without a mapped fault. However, the cluster of past events in that area suggests that there is an active fault. Due to the size of the main earthquake, a macroseismic survey was conducted to determine its impact on the community in the region. Analysis of observed data obtained from questionnaires resulted in the creation of 153 intensity data points. Their distribution showed high intensity values close to the earthquake source area. However, the investigation highlighted a number of anomalies, such as the higher than expected intensity values observed far from the event epicentre. It could be that these anomalies are caused by site conditions, for example, amplification of ground motion due to thick soil layers.
Professional Technical and Scientific Papers
Advanced seismic acquisition techniques in South African mines: Insights from the FUTURE project Rapetsoa, M.K. Manzi, M.S.D. Sihoyiya, M. Malehmir, A. James, I. Socco, LV. Lepine, J. Colombero, C. Valeshin, O. Durrheim, R.J.

Resumo em Inglês:

The FUTURE project aims to enhance seismic surveying in South African mining by integrating advanced acquisition technologies. In this paper, we detail surface and underground seismic surveys at the South Deep gold mine as part of the project. Surface seismic acquisition used co-located broadband micro-electromechanical sensors, one and three component recorders connected to geophones, distributed acoustic sensing using a straight fibre optic cable, along with a 6 ton broadband seismic vibrator operating with 4-180 Hz linear sweeps. In addition, underground surveys employed a combination of straight, and helically wound fibre optic cables, cabled-based and nodal sensors, along with a 500 kg drophammer mounted on a skid steer bobcat. The surface and underground seismic arrays were time synchronised using a GPS-time transmitter to allow for accurate seismic data recording in a GPS-denied environment. Results show the efficacy of these techniques in acquiring high-resolution seismic data, revealing detailed subsurface geological structures and mineralisation down to 3500 m below ground surface. Surface data revealed clear seismic reflections corresponding to the Black Reef and Ventersdorp Contact Reef. An underground P-wave velocity model exhibits low velocity anomalies that are associated with fracturing, while a P-wave reflection stack section shows significant reflections and a degree of faulting below the tunnel floor that was not observed on the surface reflection seismic data. We highlight the potential of these technologies to enhance safety, efficiency, and sustainability in mining. This study sets a benchmark for future reflection seismic surveys, paving the way for safer, more efficient, deep mineral exploration and extraction practices.
Professional Technical and Scientific Papers
Identification of structures capable of hosting the ML 5.5 Orkney South Africa earthquake and factors controlling the physics and mechanics of dynamic rupture Mngadi, S.B. Manzi, M.S.D. Nkosi, N.Z. Durrheim, R.J. Ogasawara, Jr.H. Yabe, Y.

Resumo em Inglês:

On 5 August 2014, the Orkney M5.5 earthquake, the largest in South African gold mining districts, occurred with an unusual strike-slip mechanism at great depth of 4.78 km below the surface. In a rare case, the ML 5.5 earthquake occurred within the area covered by the legacy 2D and 3D reflection seismic data acquired in the 1990s and 2000s for gold exploration and mine development. In addition, the earthquake ML 5.5 rupture plane was recorded and accurately delineated by the underground in-mine seismic network near the source region. The integration of the legacy 2D reflection seismic data and mine seismicity data allowed us to identify a near-vertical structure, striking northnorthwest-south southeast (NNW-SSE). The ICDP-DSeis team drilled three holes (Hole A, Hole B, and Hole C), and two holes (Hole B and Hole C), intersected the upper edges of the ML 5.5 rupture. These holes recovered metasediments, metabasalts, intrusive rocks including dolerite sills and lamprophyre dykes adjacent to the fault zone, and the fault gouge. Late Prof. Tullis Onstott and geomicrobiologists installed a packer in Hole A and successfully recovered saline water and detected gas (~10 MPa). Slip weakening and rupture propagation are significantly influenced by the existence of fault gouges and the production of wear material between two sliding rock surfaces. Using the fault gouge material recovered from Hole C, we conducted friction experiments under dry and room temperature conditions at high slip velocity of ~100 mm/s and normal stress of 2 MPa. The resulting steady-state frictional strength was ~0.66 over a slip weakening distance of ~9.1 m. The steady-state frictional strength was high, which may be caused by large gouge thickness, and the rate of wear generation. As a result, it is proposed that the Moab Khotsong ML 5.5 seismogenic zone is complex and could be controlled by three main processes: a) the complex structural architecture of the seismogenic zone (e.g., intersection of fault, lamprophyre dykes, and dolerite sills); b) the mechanical process induced by tectonic and/or mining related stresses; and c) the mechanical and chemical processes caused by the water and rock interaction.
Professional Technical and Scientific Papers
Using 3D numerical simulations to model active in-mine seismic surveys at South Deep Gold Mine, South Africa Plaatjie, S. Manzi, M.S.D. Linzer, L. Sihoyiya, M.

Resumo em Inglês:

Fiber-Optic Sensing and UAV-Platform Techniques for Innovative Mineral Exploration (FUTURE) is a joint European Union and South African consortium project funded under ERA-NET Cofund ERA-MIN3. The project aims to develop cost-effective and novel seismic methods to image geological structures ahead of the mine face, ultimately leading to improved decision-making and safer mining practices. In this study we present results from numerical simulations conducted at South Deep Gold Mine for active in-mine seismic surveys. The study uses a finite differencing code known as WAVE3D, which models models the propagation of a seismic wave generated by stress pertubations that are applied to a defined grid. The numerical simulation model included two major ore bodies (Black Reef and Ventersdorp Contact Reef) and mine tunnels. The model was constrained using laboratory physical property measurements from underground borehole samples such as seismic velocities (e.g., compressional and shear waves) and bulk densities. Two case studies were created, one modelled the active shots and receivers on surface, and the other modelled the shots at depth (in a mine tunnel at ~4000 m depth) with receivers on surface. In both cases, the objective was to investigate the wavefield propagation through the rockmass between the mine tunnel and surface. The simulated wavefield produced by the source located along the mine tunnel was successfully recorded on surface. The surface-recorded wavefield exhibits clear one-way P-wave arrival times at approximately 450 ms to 500 ms, which can be used to calculate the surface-tunnel P-wave refraction tomogram. The numerical simulation results from the study were used to optimise the acquisition parameters of the in-mine seismic surveys conducted under the FUTURE project.
Professional Technical and Scientific Papers
Seismicity evolution and rockburst control in the Merensky Reef and UG2 orebody: An intermediate depth platinum mine case study Masethe, R.T. Durapraj, S. Maqina, U. Adoko, A.C.

Resumo em Inglês:

This study investigates seismicity and rockburst control within the Merensky Reef and UG2 orebody of an intermediate-depth platinum mine located in South Africa's Bushveld Complex. Utilising a mine-wide seismic monitoring system, over 1,900 seismic events were recorded between April 2023 and May 2024, revealing complex seismic patterns driven by mining-induced stress changes. The largest event, with a magnitude of ML 2.0, underscores the seismic risks associated with mining at increasing depths. Key findings include the spatial and temporal variability of seismic events, with high seismic activity observed near pillars and geological structures. A significant portion of events correlated with pillar and foundation failures. Moment tensor analysis identified dominant failure modes, such as stress-driven fracture closures and dynamic pillar failures. To mitigate risks, the study emphasises advanced support system redesign and rockburst risk assessment using the rockburst damage potential (RDP) method. The research highlights the importance of monitoring, geotechnical compliance, and adaptive designs in enhancing safety and reducing seismic hazards in underground mining operations. The study applied the RDP framework, classifying damage across R1 to R5 scales, where most instances fell into low-risk categories (R1 and R3), indicating minor to moderate damage. However, data limitations and the tabular stoping method's complexity led to inconclusive results, highlighting the need for more robust data and customised risk assessment tools. Despite these challenges, the RDP approach provided valuable insights into rockburst mechanisms and the effectiveness of existing support systems.
President's Corner
Reigniting the research collaborations in the mining industry: too little, too late? Matinde, E.
Journal Comment
Seismic activity related to mining Durrheim, R.J.