Logomarca do periódico: Journal of the Southern African Institute of Mining and Metallurgy

Open-access Journal of the Southern African Institute of Mining and Metallurgy

Publication of: The Southern African Institute of Mining and Metallurgy
Area: Engenharias, Ciências Exatas E Da Terra
ISSN printed version: 2225-6253
Previous title {'previous_journal_title': 'Journal of the South African Institution of Civil Engineering', 'issn_print': '1021-2019', 'issn_electronic': '2309-8775'}
Creative Common - by 4.0

Table of contents

Journal of the Southern African Institute of Mining and Metallurgy, Volume: 122, Issue: 10, Published: 2022

Journal of the Southern African Institute of Mining and Metallurgy, Volume: 122, Issue: 10, Published: 2022

Document list
Documents
Professional Technical and Scientific Papers
A discrete event simulation approach for mine development planning at Codelco's New Mine Level Soto, I. Anani, A. Cordova, E.

Abstract in English:

The new caving megaprojects that are planned to go into production in the next decade have scheduled horizontal developments at very high rates, which are difficult to achieve. Research has been conducted that seeks to model the construction times for underground developments to determine the feasibility of achieving the planned rates. However, these previous attempts do not consider all the operational aspects that make up the mine development cycle. Here, we present a discrete event simulation (DES) model that individualizes each unit operation of the development cycle to determine the construction rates that new projects will be able to attain. The developed model was applied to the New Mine Level (NML) of the El Teniente Division (DET). The results indicate that it would be impractical to achieve the advance rates scheduled in the original plans if the unit operations of the mine continue to be executed using the status quo. The metres developed after six years in the sections analysed can be significantly improved by changing the maintenance strategy for the equipment (457 metres increase), orepass availability (194 metres increase), and the initial planning sequence (1 598 metres increase). It is recommended that the mine implements a flexible maintenance strategy, defines a strategy to ensure and increase orepass availability to contractors, and makes use of current simulation tools for a more robust development sequence planning.
Professional Technical and Scientific Papers
Evaluation of pre-treatment methods for gold recovery from refractory calcine tailings Mutimutema, P. Akdogan, G. Tadie, M.

Abstract in English:

The South African gold mining industry has a legacy of abundant tailings dams, which have attracted the attention of investors because of their potential as a cheaper secondary gold resource. In this we investigate study gold recovery from a refractory calcine tailings dam. Bulk mineralogy of the tailings indicated silicates and iron oxides to be the most abundant phases. Scanning Electron Microscopy (SEM) showed gold to exist in submicrometre and micrometre sizes, as free gold, and associated with arsenic, sulphur, and silicates e.g. quartz and talc. Gold recovery by direct cyanidation was low at 17.3%. Mechanical (ultra fine grinding P80 -16µm) and chemical (alkaline, NaOH) pre-treatment and microwave roasting and microwave-assisted cyanide leaching were investigated to increase gold recoveries. Ultrafine grinding was the most effective, producing recoveries of 66.5%. NaOH pre-leaching of ultrafine milled material increased recovery to 71.5%. Alkaline pre-leaching overall increased recoveries for non-pre-treated material, making this process the most preferred because it is less costly than ultrafine grinding. Microwave roasting and microwave-assisted leaching did not achieve higher recoveries than alkaline pre-treatment or fine grinding. The investigation highlights and confirms that chemical treatment with NaOH is a powerful tool for gold extraction from refractory tailings.
Professional Technical and Scientific Papers
Water production as an option for utilizing closed underground mines Dvofacek, J. Malikova, P. Sousedikova, R. Heviankova, S. Rys, P. Osickova, I.

Abstract in English:

Each mining project goes through the same life-cycle, from prospecting and exploration to closure and post-closure periods. This prompts the question whether the closure of a mine constitutes the end of its life-cycle or whether the decommissioned mine can be employed for some other purpose. Best-practice references indicate that there are many viable options. In our opinion, the production of service water is one such option. Laboratory research was carried out on the water from a flooded underground coal mine in Ostrava-Karvina coal district, Czech Republic, concerning the production of service water from pumped mine-water. The research proved the practical feasibility of service or process water production. Given the effect of global climate change with regard to water resources, good prospects for this additional resource can be assumed since the water has to be pumped in any case for safety reasons.
Professional Technical and Scientific Papers
Maximum height estimation for mine waste dumps Chai, S.

Abstract in English:

Waste dumps are widely used to discharge stripped mine wastes in open pit mining methods. As mining progresses, the height of the waste dumps will increase gradually, which may induce sliding failure once the height exceeds a critical value. Therefore, estimation of the maximum dumping height is crucial to the life-cycle use of a waste dump. However, published information about the maximum height of mine waste dumps are extremely rare. In this study, the maximum dumping height is estimated based on the strength-reduction technique by numerical simulations. The influences of dump geometry and properties on the maximum height are investigated. The results show that the maximum dump height decreases as the dump slope inclination angle a or the unit weight of dump materials y increases, but decreases when the shear parameters of dump materials (cohesion c and internal friction angle 9) increase. The maximum height starts to increase with the ground inclination p when shear failure occurs at the interface between the dump and the base. Furthermore the effects of the dump width B, Young's modulus E, and Poisson's ratio u of dump materials on the maximum height are almost insignificant. Good agreement was found between numerical results available in the literature and those obtained in this study.
Professional Technical and Scientific Papers
An improved pillar design methodology Jessu, K.V. Spearing, A.J.S. Sharifzadeh, M.

Abstract in English:

Empirical pillar design methods are commonly used in the mining industry. The parameters within which these methods are valid are frequently unknown to the user or ignored. In addition, empirical design may not consider essential parameters such as blasting effects, orebody dip and the presence of geological structures, which all adversely affect the stability of the pillars. This can result in potentially serious pillar design strength over-estimates. Although the commonly based tributary area method is generally conservative, as the spans are seldom that large relative to the depth, failing to consider other relevant parameters can result in errors. Problems associated with an under-designed pillar can range from a local pillar collapse to a catastrophic chain reaction collapse (or run). Over-designed pillars are generally safe but reduce the extraction of the orebody, thus adversely affecting the profitability of the mining operation. We used laboratory tests and numerical modelling to understand the effects of pillar orientation, blasting and the presence of discontinuities on pillar strength. Reduction factors were developed with these models to be implemented in conjunction with the existing empirical pillar design methods. For any pillar or mine design, once it is implemented, the actual performance of the system must be checked regularly by observation and monitoring and adjusted if needed. The pillar design approach outlined in this paper can better optimize the pillar mining method by considering other generally ignored but important parameters, thus improving safety, productivity, and economic aspects.
Professional Technical and Scientific Papers
Application of MR and ANN in the prediction of the shovel cycle time, thereby improving the performance of the shovel-dumper operation - A case study Dey, S. Mandal, S.K. Bhar, C.

Abstract in English:

Loading and hauling of ore and waste are the key operations of an opencast coal mine and entail a high operational cost. The productivity of a mine can be increased by reducing the cycle time of loading equipment as well as utilizing dumpers optimally. In this paper we discuss the impact of rock type, bucket fill factor, rock fragmentation, the height of the cut, and angle of swing of the bucket on shovel performance. A time study is conducted on shovels in an opencast coal mine with experimental blasts of rocks to assess the impact of different factors on the performance of the shovel. Based on the data, the authors applied multiple regression (MR) and artificial neural network (ANN) techniques to develop different models for the prediction of the shovel cycle time. Developed models are validated by comparing the predicted data with actual field data. With the help of the best model, the plausible fleet size is determined in order to utilize the shovel and dumper optimally and to improve the performance of shovel-dumper operation.
Professional Technical and Scientific Papers
Heat-constrained modelling of calcium sulphate reduction Jordan, L.A. van Vuuren, D.

Abstract in English:

A two-dimensional finite difference model has been developed to describe the reduction of kilogram quantities of dehydrated phosphogypsum. The model's scope has been limited to focus on the heat transfer and reactions that occur within a mass of material contained in a vessel inside a furnace rather than also including the effects of heat transfer to the vessel. Changes in the heat transfer properties (k, p, and Cp) are incorporated as the composition of the mass changes as the chemical reactions progress. The model is validated against experimental data, with samples heated to iooo°C at 3°C min-1 while purging with nitrogen gas. A sensitivity analysis of model predictions to the pre-exponential factor of the reaction rate constant of the main chemical reaction and the thermal conductivity of the powder bed indicated that, at the envisaged process conditions, the behaviour of the system depends much more on the rate of heat transfer than on the rate of the chemical reaction. The model demonstrated a significant increase in accuracy when the thermal conductivity was modelled to increase linearly with temperature compared to assuming a constant value.
President's Corner
Why do we need to have this conversation? Why is diversity so important? Botha, Z.
Journal Comment
Mining papers revisit old issues Pistorius, P.
location_on
The Southern African Institute of Mining and Metallurgy The Southern African Institute of Mining and Metallurgy, 5 Hollard Street, P.O. Box 61127, Marshalltown, Johannesburg, Gauteng, ZA, 2107, Tel: +27 11 834 1273, Tel: +27 11 834 1277 - E-mail: journal@saimm.co.za
rss_feed Stay informed of issues for this journal through your RSS reader
Go to top