Logomarca do periódico: Journal of the Southern African Institute of Mining and Metallurgy

Open-access Journal of the Southern African Institute of Mining and Metallurgy

Publicação de: The Southern African Institute of Mining and Metallurgy
Área: Engenharias, Ciências Exatas E Da Terra
Versão impressa ISSN: 2225-6253
Título anterior: {'previous_journal_title': 'Journal of the South African Institution of Civil Engineering', 'issn_print': '1021-2019', 'issn_electronic': '2309-8775'}
Creative Common - by 4.0

Sumário

Journal of the Southern African Institute of Mining and Metallurgy, Volume: 118, Número: 3, Publicado: 2018

Journal of the Southern African Institute of Mining and Metallurgy, Volume: 118, Número: 3, Publicado: 2018

Document list
Documents
AfriRock 2017 International Symposium
Early assessment of dynamic rupture hazard for rockburst risk management in deep tunnel projects Diederichs, M.S.

Resumo em Inglês:

Managing rockbursting conditions in mine development and operational environments is a complex and difficult challenge. The hazard and the associated risks can be managed based on local experience, monitoring, and informed data-rich analysis. On the other hand, blind development for deep tunnelling is being carried out around the world at depths in excess of 2 km and rockbursting has become a common and serious challenge. The rockburst mechanism is predominantly tunnelling-induced dynamic rupture or strain bursting, distinct from the remote or mine-generated events that impact mining excavations. Considerations of rock petrology, fabric, mechanical parameters, and structure allow an estimate of brittle response. The potential for energy storage and rapid release must be accounted for in order to understand the burst potential early in the basic design stage for deep tunnels. Failure to do so can result in unsafe conditions and years of delay. In this paper a multistep semi-empirical approach for early assessment of strain burst or dynamic rupture potential along deep tunnel alignments in variable ground is presented.
AfriRock 2017 International Symposium
Microseismic events for slope stability analysis - a case study at an open pit mine Luo, X. Salvoni, M. Dight, P. Duan, J.

Resumo em Inglês:

Slope instability is one of the major concerns in open pit mining. A significant collapse of the pit wall can result in injuries or fatalities, damage to mining equipment, interruptions to production, and potential loss of reserves. Properly interpreted microseismic data can be used to augment surface monitoring systems in identifying potential instability and the associated failure mode. A challenge for this microseismic application is that many seismic events associated with slope movements are weak and they hardly trigger a microseismic monitoring system that is set up to record an event in a trigger mode. A research project carried out at an open pit mine in Australia used both trigger mode and continuous mode to record microseismic events. The preliminary results have shown that the weak events are equally important as the strong seismic events for slope stability assessment, and they should not be ignored in microseismic monitoring for open pit mining.
AfriRock 2017 International Symposium
Mining with crush pillars du Plessis, M. Malan, D.F.

Resumo em Inglês:

Crush pillars have been extensively applied on the Merensky Reef horizon since the late 1970s. Once in a crushed state, the residual strength of the pillar provides a local support function and must support the hangingwall to the height of the highest known parting. The design of crush pillars is mainly limited to specifying a width to height ratio (w:h) of approximately 2:1. It is also required that a pillar crushes close to the face, while the pillar is being formed. On many mines the crush pillar system is problematic owing to the difficulty of controlling pillar sizes. This is mainly caused by poor drilling and blasting practices. As a result, pillar crushing is not always achieved. Crush pillars are implemented at relatively shallow depth, the pillar dimensions have remained essentially unchanged over many years, and the impact of regional pillars and geological losses contributing to the regional behaviour of the rock mass are overlooked. In many cases the pillar system is the source of seismicity. In this paper, the influence of mining losses (potholes) and the use of sidings are discussed as possible contributors impacting on crush pillar behaviour. A limit equilibrium model implemented in a displacement discontinuity boundary element program is used to demonstrate crush pillar behaviour. The results are compared to the pillar behaviour at an underground investigation site, which supports the preliminary findings.
AfriRock 2017 International Symposium
Progress of brittle microfracturing in crystalline rocks under cyclic loading conditions Ghazvinian, E. Diederichs, M.S.

Resumo em Inglês:

The stress at onset of yielding for the walls of deep underground excavations in hard rock is significantly less than the laboratory strength of intact rock samples. The wall stability is rather controlled by the microfracturing strength of the rock (i.e. crack propagation (CD) and initiation (CI) thresholds). Factors such as loading and unloading effect of excavation, glaciation, stress rotation in front of a tunnel face, etc. can contribute to the progressive damage of the rock, influencing the CI and CD thresholds and therefore contributing to the damage intensity around underground openings. The effect of stress rotation and stress fatigue on crack damage thresholds is systematically investigated in this paper through state-of-the-art laboratory testing and monitoring techniques in combination with advanced grain-based numerical modelling.
AfriRock 2017 International Symposium
Reassessing continuous stope closure data using a limit equilibrium displacement discontinuity model Malan, D.F. Napier, J.A.L.

Resumo em Inglês:

Time-dependent closure data in deep hard-rock mines appears to be a useful diagnostic measure of rock behaviour. Understanding this behaviour may lead to enhanced design criteria and modelling tools. This paper investigates the use of a time-dependent limit equilibrium model to simulate historical closure profiles collected in the South African mining industry. Earlier work indicated that a viscoelastic model is not suitable for replicating the spatial behaviour of the closure recorded underground. The time-dependent limit equilibrium model available in the TEXAN code appears to be a useful alternative as it can explicitly simulate the on-reef time-dependent failure of the reef. A key finding in this paper is that the model gives a much better qualitative agreement with the underground measurements. For both the model and actual data, the rate of time-dependent closure decreases into the back area. Calibration of the constitutive model nevertheless led to some unexpected difficulties, and element size plays a significant role. It was also noted that the simulated closure is complex as it reflects the combined result of a number of elements failing at different times. The closure rate does not decay according to a simple exponential model. Explicit simulation of the fracture zone in the face appears to be a better approach to simulating the time-dependent behaviour in deep hard-rock stopes. The calibration of the limit equilibrium model is very difficult, however, and further work is required.
AfriRock 2017 International Symposium
Rockburst prevention via destress blasting of competent roof rocks in hard coal longwall mining Konicek, P. Schreiber, None

Resumo em Inglês:

Although the application of destress blasting as an active rockburst mitigation measure is not yet commonplace in hard coal longwall mining, the method is assuming heightened importance due to increases in mining depth and high horizontal stresses in the rock mass. The main goals of destress blasting are the softening of competent rock layers, the reduction of strain energy storage, and rock mass stress release, which together contribute to minimizing rockburst occurrence and risk. One such region in which destress blasting in competent rock is applied is the Upper Silesian Coal Basin, mainly in its Czech part. Here a case study of destress blasting is presented and evaluated in terms of rockburst prevention, focusing on a thick coal seam (about 5 m) subject to longwall mining under very unfavourable geomechanical conditions (great depth - 1200 m, competent rigid rocks between coal seams, unfavourable stress field due to long-term mining). Destress blasting stages were carried out in groups of between four and eight boreholes 95 mm in diameter, with the total explosive charge ranging from 2100 kg to 3750 kg, detonated regularly at distances of 43 m to 114 m ahead of the advancing longwall face. Evaluation of destress blasting based on seismic monitoring revealed that the longwall blasts were very successful in terms of rock mass stress release and decreasing the rockburst risk, with only one rockburst occurring on a roadway 210 m from the longwall face. The following longwall section was mined safely without rockburst occurrence.
AfriRock 2017 International Symposium
Keyblock stability analysis of longhole stopes Sewnun, D. Joughin, W. Armstrong, R. Cooper, A.

Resumo em Inglês:

The orientations of discontinuity sets and major geological structures greatly influence the stability of an excavation. Excavations should therefore, where possible, be orientated such that major discontinuity sets and structures are considered, allowing the likelihood of rockfalls in a longhole stope to be kept to a minimum. The longhole stopes are non-entry excavations, which are remote cleaned to avoid exposure of personnel. However, excessive rockfalls can significantly influence productivity and cause damage to mining machinery. This paper presents a risk-based approach to design, where the failure potential of mining stopes for the Platreef mine was determined considering the influence of major structures. The probabilistic keyblock analysis software JBlock was used in this capacity. In this study, the failure potential of keyblocks was determined in JBlock for the longhole stopes of various proposed orientations, considering structural domains and a major geological fault which was identified across the project area. Results of the analysis indicated that stopes orientated sub-parallel to Platreefs major fault (Tshukudu Fault) resulted in the largest rockfalls. Overall, JBlock was used successfully as a design tool to assess the stability of the longhole stopes. Outcomes of the study have provided Platreef mine with valuable information that will assist in the decision-making process when finalizing stope orientations. This study therefore attempts to serve as a reference point for solutions to similar situations, with the objective that risk-based designs are called upon more frequently in the future.
AfriRock 2017 International Symposium
Early access microseismic monitoring using sensors installed in long boreholes Butler, T. Simser, B.

Resumo em Inglês:

For deep mines where a microseismic monitoring programme will be implemented, one of the obstacles during the early stages of mine development is how to obtain adequate three-dimensional microseismic monitoring coverage with minimal access to the rock volume. The ability to utilize existing or planned exploration or geological boreholes for seismic sensor placement is offered as a cost-effective solution to this problem. For existing mines planning to mine new, deeper ore zones, the ability to install seismic sensors in long boreholes is especially important where long ramps are being developed in high-stress/burst-prone ground where rockbursting could be expected and microseismic monitoring is required as part of a comprehensive ground control safety programme. Lessons learned from the installation and operation of seismic systems at Glencore's Nickel Rim South and Fraser Morgan mines are presented and suggested strategies for establishing new seismic monitoring systems at new mines are discussed. A case study is presented from Glencore's Nickel Rim Deep Project in Sudbury, Ontario, Canada showing how seismic sensors installed in subhorizontal geological 'scout-holes' drilled ahead of the ramp development end are being used for monitoring ramp and infrastructure development of a new mining zone in deep high-stress ground.
Papers of General Interest
Development of the MOSH Leading Practice Adoption System - a science-based system for managing behaviour change Stewart, J.M. Malatji, S.M.

Resumo em Inglês:

Poor occupational health and safety performance in the mining sector during the 1980s led to establishment of the Leon Commission of Inquiry and ultimately to the Mine Health and Safety Act of 1996. In striving to achieve the tripartite OHS milestones established in 2003, the major mining companies agreed to pilot a system focused on facilitating the identification and widespread adoption of leading practice. The system included the use of behavioural communication techniques to address resistance-to-change effects. Piloting of the system served, however, to initiate a lengthy process of learning and system development, as many of the fundamental concepts and techniques of behavioural communication were found to be inadequately understood. Achieving a practically useful understanding of these key concepts and processes took as long as three years, from 2008 to 2011. Evolution of this understanding is outlined in detail and key aspects of the resulting system and its processes are presented in summary form. The emergence of resistance at some mines to use of the MOSH adoption process is recognized and a constructive approach to addressing this issue is outlined. The substantial improvement in safety performance achieved by industry since 2003 is described and various contributing factors are identified, with the adoption system being one of these. In addition to facilitating the adoption of various leading practices, particularly in the area of falls of ground, an important contribution of the adoption system is considered to be the focus on OHS issues that it has engendered in a large number of key people across the industry. The need for a much greater focus on occupational health issues in future years is highlighted and the new OHS milestones agreed to in 2014 are presented. In conclusion, the value of adopting a holistic long-term systems approach to address multi-facetted challenges, such as behavioural change and occupational health and safety, is highlighted.
Papers of General Interest
A structured key cost analysis methodology to identify value-contributing activities in mining projects: a case study of the Chuquicamata Underground Project Córdova, E. Mobarec, V. Pizarro, E. Videla, A.R.

Resumo em Inglês:

Traditional project evaluation methods for estimating operating costs of mining projects mostly produce static and over-conservative evaluations. In this study, a systematic model for managing the economic risk of the operating costs for an ongoing 'supercave' project, the Chuquicamata Underground Project, is presented. Key cost generators are identified, and their inherent variability is characterized based on a similar underground operation and expert judgment. Using Monte Carlo simulations, variability is factored into the evaluation, and the economic risk associated with each variable is quantified, after which the simulated data is used to identify the underlying risk, as well as mitigating actions and opportunities. The methodology can serve to identify how variability may impact the value of the project and how mitigation actions could decrease the present value of the estimated operating cost of the project by more than 10%. As a result of the analysis, the project managers became aware that labour and energy costs are the major contributors from a risk-value perspective, and mitigating actions such as construction of a power plant and implementation of a well-designed labour productivity incentive plan could be justified with a reduction of the overall risk value of the project.
Papers of General Interest
Trials of the Garford hybrid dynamic bolt reinforcement system at a deep-level gold mine in South Africa Sengani, F.

Resumo em Inglês:

Efficient dynamic bolt reinforcement is crucial in deep-level gold mines prone to rockbursts. Deep-level gold mining in South Africa is approaching 4000 m, so appropriate support designs need to be implemented to manage ground stability challenges associated with these great depths. In order to extract the orebody, both novel mining methods and massive mining techniques have to be applied. Currently, massive mining techniques are used and destressing is imperative. Destressing is accomplished by cutting a series of overlapping, 5 m high horizontal slots across the reef. Although the minor span of each slot is about 100 m, stresses are extremely high due to presence of abutments. In order to protect workers from the effects of small seismic events, a yielding support system consisting of weld mesh (100 mm apertures and 5 mm strands) and 2.5 m long Garford hybrid bolts has been developed. The support system allows installation to be made at 0.5 m from the advancing face without significant damage by the blast. A tendon pretension of 49.3 kN ensures an active support system at installation, with 29 kJ/m2 energy absorption capacity during seismic events, and static tensile capacity of 147 kN. The effectiveness of the Garford hybrid bolt is discussed in this paper.
Papers of General Interest
A review of lashing methods used in shaft sinking Frangakis, T.J.

Resumo em Inglês:

Shaft sinking operations involve repetitive activities, some of which require significant amounts of time to complete. Lashing or mucking of blasted material is one such activity, which currently occupies approximately 40% of the cycle time and is also dangerous for workers at the shaft bottom. In this paper, the main lashing techniques used in modern shaft sinking are reviewed and compared in terms of efficiency and safety. An analysis of lashing duration as a function of shaft diameter and bucket volume is conducted, and the results compare reasonably well with published loading rate data. There are opportunities for developing opposed bucket loaders further, possibly adding an extra degree of freedom, and reviewing the bucket action in shallow muckpiles.
Papers of General Interest
Silicomanganese production at Transalloys in the twenty-tens Steenkamp, J.D. Maphutha, P. Makwarela, O. Banda, W.K. Thobadi, I. Sitefane, M. Gous, J. Sutherland, J.J.

Resumo em Inglês:

Transalloys is currently the largest producer of silicomanganese in Africa, with its smelter complex based outside the town of eMalahleni, in the Mpumalanga Province of South Africa. It operates five open submerged arc furnaces and produces an alloy containing > 16% Si, < 2% C, and > 65% Mn. Manganese ore is the main source of manganese units, supplemented by dust and alloy fines recycled into the furnace as briquettes. Transalloys has mature technology and systems in place, which are described in more detail in this paper.
Papers of General Interest
Prediction of cuttability from rock cutting resistance Raghavan, V. Murthy, Ch.S.N.

Resumo em Inglês:

The objective of this investigation is to predict rock cuttability from measurements of rock cutting resistance (RCR) during the cutting process and to study the influence of mechanical properties on the depth of cut achieved. Point attack bits with angles of 45°, 50°, 55°, and 65° were used and the experiments were conducted at attack angles of 45°, 55°, and 65°, keeping the rotation speed constant while varying the cutting force and torque during cutting. The depth of each cut was measured and the cut material collected and weighed. The experimental data were compared using an artificial neural network (ANN) and finite element method (FEM) to predict RCR for the measured depth of cut. The results reveal that a 55° attack angle produced the optimum depth of cut.
News
Wits Mining School jumps to 15 on world ranking 7 March 2018 - Johannesburg Braham, S.
Journal Comment
AfriRock 2017 Joughin, W.
President's Corner
Shaping the mining sector through inclusive leadership Ndlovu, S.
location_on
The Southern African Institute of Mining and Metallurgy The Southern African Institute of Mining and Metallurgy, 5 Hollard Street, P.O. Box 61127, Marshalltown, Johannesburg, Gauteng, ZA, 2107, Tel: +27 11 834 1273, Tel: +27 11 834 1277 - E-mail: journal@saimm.co.za
rss_feed Acompanhe os números deste periódico no seu leitor de RSS
Ir para o topo