Journal of the Southern African Institute of Mining and Metallurgy
Publicación de: The Southern African Institute of Mining and Metallurgy
Área:
Engenharias, Ciências Exatas E Da Terra
Versión impresa ISSN:
2225-6253
Titulo anterior
{'previous_journal_title': 'Journal of the South African Institution of Civil Engineering', 'issn_print': '1021-2019', 'issn_electronic': '2309-8775'}
Tabla de contenido
Journal of the Southern African Institute of Mining and Metallurgy, Volumen: 117, Numero: 2, Publicado: 2017Journal of the Southern African Institute of Mining and Metallurgy, Volumen: 117, Numero: 2, Publicado: 2017
| Documents |
|---|
|
Wits Special Edition - Volume 2 A CFD model to evaluate variables of the line brattice ventilation system in an empty heading Feroze, T. Genc, B. Resumen en Inglés: Blind headings in room and pillar coal mines are a major source of methane and coal dust. Most methane and coal dust explosions therefore occur in the blind headings. The primary cause of these explosions is the disruption of the local ventilation system. Line brattice (LB) ventilation systems are used to ventilate blind headings by directing air from the last through road (LTR) into the heading. The amount of air available to ventilate the face of the empty heading depends on the heading dimension, settings of the LB, and velocity of air in the LTR. LBs are commonly installed by underground supervisory staff based on work experience, which may result in ineffective ventilation. The correct installation of LBs remains a challenge. In this study, a validated computational fluid dynamics (CFD) model has been used to analyse the effect of the LB ventilation system variables on the air flow rates close to the face of the empty heading. Full-scale three-dimensional models with various heading heights, heading depths, LB settings, and LTR velocities were simulated. The air flow rates and patterns at various locations inside the heading were analysed. A comparative study was carried out to quantify the effect of each of these system variables on the flow rates close to the face of the heading. Based on the findings, a user-friendly numerical model was formulated that can be used to estimate the flow rate close to the face of an empty heading for different practical settings of the system variables. This model can help the supervisory staff to swiftly implement the ventilation plan according to the regulations and the mine standards. The model can also serve as part of the curriculum for educating future mining engineers |
|
Wits Special Edition - Volume 2 Poor sampling, grade distribution, and financial outcomes Minnitt, R.C.A. Resumen en Inglés: This study examines the problems faced by open pit mine superintendents who make choices about how to direct their materials, either to the waste dump or to the mill. The paper explores the effects of introducing a 10% sampling error and a 0.9-times to 1.1-times sampling bias on positively skewed distributions for precious and base metals, negatively skewed distributions in the case of bulk commodities, and normal distributions as is the case for coal deposits. Parent distributions for each commodity were created on a 25 x 25 m grid using transformations of gold, iron ore, and coal data-sets, spatially based on a nonconditional Gaussian simulation. Ordinary kriging of grades for the three commodities into a 10 x 10 m grid provided the reference case against which the distributions with the sampling error and sampling bias for the commodities were compared. Imposing cut-off grades on the actual- versus-estimated scatterplots of the three commodities allowed the distributions to be classified into components of waste, dilution, ore, and lost ore. Ordinary kriging of values for each deposit type acted as the reference data-set against which the effects and influence of 10% sampling error and 0.9-times to 1.1-times sampling bias are measured in each deposit type. Indications are that the influence of error and bias is not as significant in gold deposits as it is in iron ore and coal deposits, where the introduction of small amounts of error and bias can severely affect the deposit value. |
|
Wits Special Edition - Volume 2 A version of Gy's equation for gold-bearing ores Minnitt, R.C.A. Resumen en Inglés: The two methods for calibrating the parameters K and α (alpha) for use in Gy's equation for the Fundamental Sampling Error (FSE)-, Duplicate Sampling Analysis (DSA) and Segregation Free Analysis (SFA)-, are described in detail. A case study using identical broken reef material from a Witwatersrand-type orebody was calibrated using the DSA and SFA methods and the results compared. Classically, the form of Gy's equation for the FSE raises the nominal size of fragments given by dNto the power of 3. A later modification of Gy's formula raises dNto the power α (alpha), the latter term being calibrated with the coefficient K in the DSA and SFA methods. The preferred value of α for low-grade gold ores used by sampling practitioners in the mining industry is 1.5. A review of calibration experiments for low-grade gold ores using the DSA and SFA methods has produced values of K that vary between 70 and 170 and values of a in the range 0.97 to 1.30. The average value for a is shown to be 1, rather than 3 as originally proposed in the classic form of Gy's equation or the industry-preferred 1.5. It is suggested that for low-grade gold-bearing ores the equation for the FSE should raise dNto a power of 1. Such an equation for the variance of the FSE greatly simplifies the charac terization of gold ores, now requiring only the calibration of K for a given mass and established fragment size. The implications of the simplified equation for the heterogeneity test are that, provided the fragments have been screened to within a narrow size range, any particular size will return a value for K that is acceptable for use in the sampling nomogram. |
|
Wits Special Edition - Volume 2 Value creation in a mine operating with open stoping mining methods Le Roux, P.J. Stacey, T.R. Resumen en Inglés: Mining companies are under constant pressure to reduce their cost structures to sustain profitability. In mines using an open stoping mining method, dilution often has a significant effect on profitability. At Target mine in South Africa, dilution in some open stopes was found to exceed 10%, falls of ground being a major contributor to the problem. This dilution can reduce the recovered grade from 5.5 to 4.5 g/t, resulting in a potential loss of about R21 million per month based on a gold price of R240 000 per kilogram. In addition to the cost of dilution, the cost of damage to, or loss of, trackless equipment as a direct result of falls of ground in open stopes is significant. Other associated costs include transport, hoisting, secondary blasting, milling, and plant treatment of waste material. Stable open stopes are essential in order to reduce falls of ground. Back-analyses of stope instability at Target mine have indicated that conventional rock mass failure criteria are unsuitable for stope design. An alternative strain-based criterion has been developed, and has proved to be very successful, allowing the stability of open stopes to be calculated reliably. Since its implementation in 2010, dilution and equipment damage have decreased markedly, creating value for the mine. |
|
Wits Special Edition - Volume 2 Geostatistical techniques for improved management of brickmaking clays von Wielligh, M.H.M. Minnitt, R.C.A. Resumen en Inglés: Brick manufacturers supply a variety of uniquely coloured facebricks to the building industry, which requires a high level of colour consistency in the products. Colour variation in bricks is influenced by the composition and consistency of the white clay raw material. By blending varieties of naturally occurring white clay the manufacturers produce a unique range of facebrick products. Homogeneity of the white clay raw materials mined at Lenasia is crucial for producing bricks of consistent colour. Geostatistical investigations of the major element distributions (SiO2, Al2O3, Fe2O3, and K2O) and loss on ignition (Lol) were conducted. An analysis of the spatial continuity of these variables followed by ordinary kriging indicated that the upper white clay layer at Lenasia is richer in K2O and Fe2O3 than the lower layer. Consistency in the colour of facebricks depends critically on careful management of the variability in the K2O and Fe2O3 content of the clays. The geostatistical approach to understanding the distribution of elements in the clay allows miners to construct clay stockpiles of consistent quality for feeding the brick-making process. Geostatistical investigation of the chemical contents in other clay domains within the deposit is recommended, and could be extended to all facebrick manufacturers to assist in improving the colour consistency of their products. |
|
Wits Special Edition - Volume 2 Optimization of cut-off grades considering grade uncertainty in narrow, tabular gold deposits Birch, C. Resumen en Inglés: Mineral reserve statements as well as optimizing mine planning require a block model with grades for each mining block. A cut-off grade is determined by considering the mining costs as well as the expected revenue for each block. These grades are estimated using various techniques, but in reality there is uncertainty in the grade values. These uncertainties result in two types of error. A type I error is where material is classified as ore and mined, but the true value is below the cut-off grade and the material is therefore waste. This material constitutes dilution. The type II error is where material is estimated to be below the cut-off grade and is classified as waste, whereas the true grade is actually above the cut-off grade. This material is not mined and the value is lost. This research considers the value of the lost ore and the costs of dilution under various degrees of uncertainty. Simulation using @Risk and mixed integer linear programing (Excel Solver) is used in a financial optimizer model to maximize either profit or net present value. This is applied to four Witwatersrand tabular gold deposits to investigate the impact of block grade uncertainty on cut-off grades. When optimizing for profit, value may be added by adjusting the cutoff grade slightly downwards. When optimizing for NPV, value may be added by lowering the cut-off grade significantly for the lower discounting rates. At higher discount rates, the lowering of the cut-off grades should be reduced, and in some cases an increase in cut-off grade may be required. Each mine reacted differently to the optimization and thus there is no single rule that can be applied across all tabular Witwatersrand gold deposits. |
|
Wits Special Edition - Volume 2 Analysis of the effect of ducted fan system variables on ventilation in an empty heading using CFD Feroze, T. Genc, B. Resumen en Inglés: The effect of some of the system variables in forcing and exhausting ducted fan systems on ventilation in an empty heading was investigated using computational fluid dynamics(CFD) and comparative analyses. The diameter of the duct, duct mouth to face distance, and the power of the fan (quantity delivered by the fan) were varied and their effect on ventilation determined through a comparative analysis of the flow rates calculated close to the face of the heading. Estimation models were developed, which can be used to calculate the flow rate close to the face of the empty heading for different settings of the system variables studied. The study showed that recirculation for a forcing ducted fan system can be reduced by increasing the duct diameter or increasing the duct mouth to face distance. For the exhausting ducted fan system, higher flow rates were achieved by reducing the duct mouth to face distance, and increasing the fan design flow rate and duct diameter. The outcomes of this investigation will help ventilation engineers in deciding the optimum duct fan system required for sufficient ventilation. |
|
Wits Special Edition - Volume 2 Reflections on narrow-reef platinum mining pillar design systems as applied to a large platinum exploration feasibility project Zvarivadza, T. van der Merwe, J.N. Resumen en Inglés: Platinum is a highly valuable resource, its safe and economic extraction is paramount. The success of platinum mining by the bord and pillar method depends heavily on a comprehensive and dependable pillar design method. Pillars need to be large enough to safely support the load and small enough to avoid loss of resources. A critical evaluation of current pillar design systems used in narrow-reef platinum mining was undertaken using practical experience from a large feasibility-stage platinum exploration project, supplemented by observations from several platinum mines in Zimbabwe. An extensive literature survey was undertaken in order to determine the current status of design systems. Through this approach, the shortcomings of current pillar design systems are highlighted. Areas are proposed for further research to obtain a better understanding on how additional factors influence pillar system stability. The exploration work highlighted how rock mass classification methods can be utilized in determining the overall strength of pillars. Current pillar design systems for narrow-reef platinum mining consider width-to-height-ratio (usually with different exponents for width and height) and the strength of the pillar material. However, there are many more important factors that are not considered and which have a bearing on pillar system stability. An in-depth study of these parameters with a view to establish effective narrow- reef platinum mining pillar design systems needs to be undertaken. |
|
Wits Special Edition - Volume 2 Using short deflections in evaluating a narrow tabular UG2 Reef platinum group element mineral resource Witley, J. Minnitt, R.C.A. Resumen en Inglés: Narrow tabular platinum group element deposits in the Bushveld Complex of South Africa are typically evaluated by diamond core drilling from surface. Several short deflections are drilled from each mother hole in order to obtain multiple intersections at a close spacing (less than 1 m). Examination of the intersections from deflection drilling revealed the importance of these deflections in understanding the representivity of the borehole, obtaining an estimate of the nugget effect, and mitigating the undesirable effect of the high grade variability at the ultra-short range that is a characteristic of these deposits. The use of deflections in estimation was investigated by means of a number of techniques and scenarios in order to find the most appropriate way to use them in an estimate. A significantly improved level of confidence was gained from using multiple close-spaced intersections rather than a single borehole intersection. |
|
Wits Special Edition - Volume 2 3D geological modelling and resource estimation for a gold deposit in Mali Chanderman, L. Dohm, C.E. Minnitt, R.C.A. Resumen en Inglés: Mineral Resource estimation (MRE) and classification are highly dependent on the confidence in the model of the orebody geometry, known as the geological model, within which the estimates are constrained. An understanding of the geology of a deposit is thus fundamental to the Mineral Resource evaluation process. The geological model is a function of the structural and depositional complexity of the geology captured by drilling information, which is limited in the early stages of a project. The information effect has a significant impact in terms of the interpretation of the geology as well as the estimation of grade continuity and the resultant risk associated with the Mineral Resource estimate and classification. Therefore, as new drilling information becomes available, it is necessary to update and refine the geological model to appropriately constrain the resource estimates. The grade information is also updated, including statistics and the spatial correlation characteristics. This refinement is based on geological interpretations derived from the drillhole information that becomes available throughout the life of the mine; orebody knowledge that comes from working experience of the deposit, as well as familiarity with the software package used for modelling, is also important. In updating, the potential to identify new resources in previously unknown areas may be realized. The opposite may also occur where previous interpretations of ore continuity are refuted. Both scenarios could result from a better understanding of the geology of the deposit and thus a more realistic MRE, which reduces geological risk. This paper describes how newly drilled advanced grade-control holes for a gold deposit in Mali were used to refine the 3D geological model for the deposit in an attempt to identify the potential for additional oxide ore using conventional geostatistical evaluation techniques. |
|
Wits Special Edition - Volume 2 Characterizing a mining production system for decision-making purposes in a platinum mine Sebutsoe, T.C. Musingwini, C. Resumen en Inglés: The primary objective of any mining business unit is to make profit by extracting, processing, and selling minerals from a particular mineral deposit. It is important to optimize extraction of the mineral resource given time, capital, and space constraints. Mineral extraction is often associated with uncertainty due to variable technical and human factors. Technical factors such as grade distribution, ground conditions, and equipment reliability influence the performance of a mining production system (MPS). The performance of the MPS is also impacted by human factors such as employee skills, health, and attendance. Uncertainty associated with technical and human factors often leads to actual output differing from what was planned. Therefore an in-depth analysis of the significant causes of deviations from the planned outcomes is relevant. In this paper we investigate the empirical relationships between inputs and outputs in a MPS in order to assist management in directing efforts at key production drivers. Once a MPS has been empirically characterized, more effort and resources can be focused on the key decision-making variables (DMVs) in order to meet the planned outcomes. For a typical underground, tabular, narrow-reef conventional drill-and-blast platinum mine the face advance, face length mined, number of teams, team efficiencies, and team size have a statistically significant relationship with the centares (m2) produced, which is a key performance indicator (KPI). The production function derived in this study can be used to align the physical, technical, and human factors together to predict the optimal output level. The most significant production lever of the MPS is the face advance. |
|
President's Corner The brighter side of career cyclicality in the mining professions in South Africa Musingwini, C. |
|
Journal Comment Wits Mining Turns 120 Years! Musingwini, C. |
The Southern African Institute of Mining and Metallurgy
The Southern African Institute of Mining and Metallurgy, 5 Hollard Street, P.O. Box 61127, Marshalltown, Johannesburg, Gauteng, ZA, 2107, Tel: +27 11 834 1273, Tel: +27 11 834 1277 -
E-mail: journal@saimm.co.za
Lea la Declaración de Acceso abierto
