Journal of the Southern African Institute of Mining and Metallurgy
Publication of: The Southern African Institute of Mining and Metallurgy
Area:
Engenharias, Ciências Exatas E Da Terra
ISSN printed version:
2225-6253
Previous title
{'previous_journal_title': 'Journal of the South African Institution of Civil Engineering', 'issn_print': '1021-2019', 'issn_electronic': '2309-8775'}
Table of contents
Journal of the Southern African Institute of Mining and Metallurgy, Volume: 115, Issue: 11, Published: 2015Journal of the Southern African Institute of Mining and Metallurgy, Volume: 115, Issue: 11, Published: 2015
| Documents |
|---|
|
Surface Minning Conference Papers The SAMREC Code 2015 - Some thoughts and concerns Rupprecht, S.M. Abstract in English: This paper is intended to document recent personal thoughts, opinions, and debate around the South African Code for the Reporting of Exploration Results, Mineral Resources and Mineral Reserves (the SAMREC Code) (2009) and its current usage by Competent Persons. Admittedly, some debates are as old as the SAMREC Code itself and have been 'parked' as no consensus could be reached by members of the SAMREC Working Group. Some of the more critical issues currently under examination are the definition of Competent Person and the potential registration of Competent Persons, the current re-write of the Code, and the introduction of reporting of Exploration Results, Mineral Resources, and Mineral Reserves on an 'If not - why not' basis, noncompliance with the Code and discipline, the role of the Johannesburg Stock Exchange Readers Panel, and the valuation of mineral assets based on scoping studies. |
|
Surface Minning Conference Papers Haul roads can make money! Visser, A.T. Abstract in English: Almost 20 years have passed since the cutting-edge research by Thompson and Visser on the design and management of opencast mine haul roads was conducted in South Africa. This system is based on three principles, namely the structural ability to support the ultra-heavy truck loads, the selection of vehicle and environmentally friendly riding surface, and an appropriate level of maintenance to counteract wear and tear. Obviously, proper layout and geometry are essential. These principles have been implemented worldwide, and it is useful to review the lessons learned. The objectives of this paper are to present a critical review of the status of mine haul road design and management, and the impact that these principles have made on operations, particularly the cost-effectiveness. The paper briefly reviews the principles of the haul road design and management and the extent to which they are applicable. Case studies of a number of implementations are presented to demonstrate that the principles are sound and have been applied effectively. For example, at an international operation the transport cost of coal was 40% more expensive than anticipated in the feasibility stage, and this made the mining operation uneconomic. Correction of this problem resulted in a viable enterprise. Although designed for opencast operations, the principles are equally valid for underground operations, and initial development work will be discussed. The main conclusions are that the research approach is valid and its effectiveness has been demonstrated in a number of applications. The anticipated financial benefit has been derived, and has made the mining operations that used the principles more effective. Of major importance is the application of opencast haul road design principles to the future thrust of using driverless vehicles in opencast and underground mining, where the road quality is not negotiable as there is no driver that can avoid obstacles or severe road deterioration. |
|
Surface Minning Conference Papers Identification of key performance areas in the southern African surface mining delivery environment Dougall, A.W. Mmola, M. Abstract in English: The global resources and commodities market has become highly competitive. While southern Africa's abundance of minerals resources is still unrivalled, it has lost considerable dominance in terms of production output. The sustainability of southern Africa's mining industry is increasingly becoming dependent on its ability to manage the performance of its operations well. A valuable tool for monitoring and managing performance is the use of key performance areas (KPAs) - which are those areas of performance that are reflected explicitly or implicitly in the vision and strategies of an organization and reflect the critical success factors of the organization. This paper is a review of key performance areas in the southern African mining delivery environment. The KPAs discussed in this paper have been identified by comparing KPAs of the several mining houses engaged in surface mining operations in southern Africa and then extracting those KPAs that are common to most of them. Although the authors support the view that each organization should develop KPAs to specifically fit its needs, the study reveals that five KPAs - safety and health, costs, product quality, fleet management, and delivery should form a default list that covers the key areas that any organization should consider when choosing KPAs. KPIs are those subsets of KPAs that we measure in order to manage KPAs. |
|
Surface Minning Conference Papers Safety aspects and recommendations for surface artisanal mining Rupprecht, S.M. Abstract in English: Artisanal mining is a significant industry in sub-Saharan Africa, accounting anywhere from 2% to 20% of a country's gross domestic products (GDP). Safety concerns in artisanal mining are often overlooked due to the nature of the business, which is largely a subsistence occupation. This paper presents some of the basic risks observed in surface artisanal mining operations and provides basic safety recommendations for artisanal mining operators to follow to prevent serious accidents or fatalities. The most frequently cited causes of serious accidents are subsidence of highwalls, misuse of explosives, lack of knowledge and training, and obsolete and poorly maintained equipment. |
|
Surface Minning Conference Papers Mining complex geology, mitigation of float dust, and developing autonomous machine capability using horizon sensing technology for coal seam boundary detection Duncan, J. Stolarczyk, L.G. Abstract in English: Long before the environmental movement, coal miners were suffering from occupational diseases that became apparent in the later years of service, and especially during the retirement years. Chronic exposure to micro-fine dust in the respirable range ('float' dust) causes various lung diseases, referred to as coal mine dust lung disease. In the USA alone, 76 000 miners have died of coal mine dust lung disease since early legislation recognized the issue in 1969. Researchers believe that reducing float dust exposure limits alone will not reverse the increasing incidence of coal mine dust lung disease seen in the current generation of miners. Trace and radioactive metals are concentrated in the thin boundary layers of the coal seam (Roberts, 2013), and hence float dust includes silica and toxic trace metals. The production and quality of coal is also significantly impacted by the presence of these contaminants in the coal. In the combustion process, the trace metals are oxidized and become incorporated in the fly ash and flue gas. Since they are extremely water-soluble, they represent a significant danger to health and the environment. Coal preparation plants and power stations need to mitigate these contaminants as far as is practical, but the simple fact is that most contaminants should have been left un-mined. This paper describes an innovative coal-cutting solution to the longstanding technology gap in mining - the ability to measure uncut coal layer thickness to the boundary rock layer. Because of constant changes in geology, seam thickness, and seam undulation, the horizon sensor must be located in the bit-block of the rotating cutter drum of the mining machine. Contaminants in ROM coal must be minimized at the source - that is, at the rock/coal crushing cone directly under the bit-tips of the cutting drum. Bittip distances to the rock boundary layer must be automatically controlled in real time when mining in a complex and undulating coal bed. Horizon sensing (HS) technology enables the mining machine's cutting picks to stop at a specified distance from undulating horizons of the boundary rock. The thin contaminated coal layer can be left in situ, significantly reducing the toxicity of the float dust. Preventing the metal picks from striking quartz-containing boundary rock also reduces the occurrence of methane ignitions. HS technology equipped with pick force vector sensing can allow optimization of the cutting pick lacing pattern for minimum coal and rock crushing, thereby reducing float dust. This technology may enable the mining industry to convert from automated machine control to autonomous during coal cutting and loading. |
|
Surface Minning Conference Papers Owner versus contract miner - A South African update Rupprecht, S.M. Abstract in English: Over the last decade in South Africa, there has been a significant increase in the number of mining operations, both open pit and underground, which use independent contractors to carry out mining activities. Often mine owners will choose the contractor option without fully understanding the consequences of undertaking this option. Traditionally, contract mining has come at a cost premium of about 15% to 20% compared to an owner mining scenario. However, due to the large number of junior mining companies entering the mining arena in South Africa contract mining rates have increased, with cost premiums as high as 50% being reported. This paper looks at the merits of owner mining versus contract mining and describes under what conditions it may be favourable to select the one option over the other. In addition, the methodology of entering into contract negotiations with the objective of establishing a fair and sustainable relationship is discussed. |
|
Surface Minning Conference Papers Positive risk management: Hidden wealth in surface mining Luckmann, J.A. Abstract in English: The purpose of this paper is to introduce an innovative approach to risk management in surface mining operations, namely, positive risk. Traditionally, risk management focused on mitigating losses (negative). Positive risk, on the contrary, reverses the approach and focuses on exploiting a project's inherent benefits (positive). The inability to accurately determine project objectives during the project planning phase and the failure to achieve those objectives during the execution phase is a major problem for any project management in the mining environment. The advance of computer aided design models for mine planning enables mining engineers to examine various options within a very short time. Employing positive risk management combined with drivers-based risk management when evaluating these options provides an ideal opportunity to investigate areas for improving the mining project's profits. Furthermore, harnessing positive risk returns during the planning phase contributes immensely to the successful achievement of project objectives. Mining has inherent business risks, which can appear overwhelming when considering the risks associated with a mining project schedule, cost, and safety or resources, etc. The question is - how to manage risks in a surface mining environment, and what process methodologies, work methods, processes, and standards should be used when considering the surface mining risks. Applying the principles of positive risk management to manage surface mining risks is not only relevant, but definitely beneficial to mining projects and to the mining industry as a whole. It would certainly be beneficial for risk managers and risk professionals to understand the roles of positive risk 'drivers', also known as 'propitious attractors'. Identifying, analysing, estimating, and understanding the propitious attractors, their behaviour and their influence on project risk events helps considerably during the planning and execution phases. The theoretical and practical knowledge of both sides of the risk - the downside risk (negative risk) and upside risk (positive risk) - can add substantial value to any organization when downside risk is adequately mitigated and upside risk is beneficially exploited. |
|
Surface Minning Conference Papers Determining settlement rates and surface stability using in situ density of backfill as a proxy for displacement Fenn, D. du Kanda, A. Dukhan, D. Abstract in English: Gibb Consulting Services was contracted by Eskom Line Engineering Services to conduct an investigation to determine the absolute displacement to date and infer the current rate of displacement of unsurveyed colliery backfill. At the test site, where a 400 kV power line is to be constructed, neither the surface nor the backfill material had been monitored and it was not possible to state whether the surface will be subject to future settlement that may compromise surface infrastructure. Therefore indirect methods of estimating current and future displacements needed to be found to act as a proxy for a comprehensive long-term settlement monitoring exercise and provide a reasonable estimate for the settlement that has occurred in the decades of mining. The innovative solution was to recover essentially undisturbed core from backfill using a sonic drill rig and use the measured dry density values from the samples as a proxy for the rate and absolute displacement in the backfill. The success in obtaining an essentially undisturbed backfill core and the clear relationship of the backfill density with age and depth allowed the conclusion to be issued that the power line infrastructure can be constructed over the backfill; with a warning that once the water table recovers after mining ceases some collapse settlement may occur. With this method, the amount of settlement can be predicted and, if proven conclusively, provides a way to confidently release huge areas of currently waste ground for future surface infrastructural development. |
|
Papers of General Interest Observed spatial and temporal behaviour of seismic rock mass response to blasting Woodward, K. Wesseloo, J. Abstract in English: Seismically active mines generally experience an increase in seismic hazard due to rock mass instability following blasting. Re-entry protocols commonly include measures to limit the spatial and temporal exposure of personnel to increased seismic hazard induced by blasting. The management of periods of increased seismic hazard requires the development of re-entry protocols for a unique mining environment. Identifying mining conditions that may result in significant seismicity following blasting relies on retrospective analysis, which is often focused on seismicity occurring within a certain period after blasting and within a certain radius of the blast in the broader context of site-specific experience. The analysis of seismicity without considering blasting times and locations allows for the relationship between seismicity and blasting to be investigated without prior assumptions concerning dependency. To achieve independent analysis, seismicity that is clustered in space and time (referred to as a seismic sequence) must be identified by assessment utilizing only seismic parameters. An automated algorithm is implemented that assesses the timing, location, and quantity of seismicity to identify seismic sequences, represented by the time of the first event and mean location of all events in the sequence. The relationship between sequences and blasts is assessed by calculating the distance and time from each sequence to the closest blast in space and time. Establishing an independent classification between sequences and blasting provides insight into the unique cases where seismic sequences are remote and/or delayed with respect to blasts and identifies cases when sequences exhibit a weak relation to blasting. The nature of seismic responses to blasting has direct implications for the management of the increased seismic hazard associated with seismic sequences. The approach presented in this study contributes to the management of seismic hazard by providing empirical support for the relationship between seismic sequences and blasting. These relationships indicate the portions of sequences that can and cannot be practically managed using tactical approaches. Furthermore, the analysis of sequences reveals the nature and evolution of rock mass responses to blasting. These results have implications for the extent of spatial or temporal re-entry restrictions required for the optimal management of time-dependent rock mass response to mining. |
|
Papers of General Interest A proposed approach for modelling competitiveness of new surface coal mines Budeba, M.D. Joubert, J.W. Webber-Youngman, R.C.W. Abstract in English: Cost estimation for surface coal mines is a critical practice that affects both profitability and competitiveness. New mines require these costs to be estimated using available information before a project begins. The competitive advantage of a new mine depends on it being both efficient and cost-effective. Low-cost producing mines have a higher chance of survival in a low-price environment than do high-cost producers. The competitiveness and profitability of a coal mine is based on the costs of production and the supply position on the cost curve. There is no single method of cost estimation, and the available methods consider only one or a few variables, leaving out multiple variables that could significantly affect the estimation of mine costs. Mining companies are thus searching extensively for a method that will increase accuracy in the estimation and evaluation of mining projects This paper highlights the shortcomings of the available approaches and proposes a data envelopment analysis method to develop a frontier for effective surface coal mines, and the use of a parametric method for modelling the costs and productivity of new mines to ensure effective competitiveness. The models will extend the capability of estimation and the accuracy of estimates using the efficient decision-making units, by considering the optimal mine-specific and external variables affecting costs. |
|
Papers of General Interest Development of a fuzzy model for predicting the penetration rate of tricone rotary blasthole drilling in open pit mines Kricak, L. Negovanovic, M. Mitrovic, S. Miljanovic, I. Nuric, S. Nuric, A. Abstract in English: Rotary drilling with rolling tricone bits is the most widely used method for drilling large-diameter blast-holes in large surface mining operations. This drilling method is applicable to a wide range of soft to hard rock materials. This paper presents a fuzzy model for predicting the penetration rate of tricone rotary blast-hole drilling. The model is based on data obtained during the drilling of blastholes in rocks with various uniaxial compressive strengths in the Veliki Krivelj open pit mine, Bor, Serbia. The model was developed using the fuzzy logic toolbox of MATLAB with the Mamdani inference system. The fuzzy model was tested with 23% of the total data-set. The results obtained show the high reliability of predicting the penetration rates. Although there are possible limitations in applying the model to other open pit mines because of differences in rock properties, the prediction methodology applied in this paper can be used in many other predictions of the penetration rates. |
|
Papers of General Interest Uncertainty determination in rock mass classification when using FRMR Software Namin, F.Samimi Rinne, M. Rafie, M. Abstract in English: Rock mass classification systems constitute an integral part of empirical underground excavation design. One system that is commonly used to classify rock mass is the Rock Mass Rating, or RMR, system. The RMR system has evolved over time to better reflect the perceived influence of various rock mass factors on excavation stability. While the introduced modifications have enhanced the applicability of this classification system, there are still areas that cause potential ambiguity. The RMR system cannot deal with input data ambiguities, uncertainties, and vagueness. To deal with the uncertainty, a Fuzzy Rock Mass Rating (FRMR) has been developed. This study aims to describe the main concept of the fuzzy approach, which is implemented in the FRMR to classify rock mass. The FRMR considers the uncertainty associated with the input data (uncertain variables) used in rock mass classification. The Gol-e-Gohar (GEG) area 3 iron ore deposits in the south of Iran were chosen as the case study for investigating the applicability of FRMR. The results of this study show that the FRMR software tool can easily be used for rock mass classification, even if uncertain input parameters have been used. FRMR consists of three parts, each of which is suitable for certain conditions. |
|
Papers of General Interest The economics of exhaustible mineral resources - concepts and techniques in optimization revisited Hutton, C. Abstract in English: The last commodities supercycle (2003 to 2011) was characterized by a belief in volume at any cost, where absolute output was deliberately prioritized over productivity considerations. This practice fuelled over-optimistic forecasting and planning, which in turn contributed to the economic crisis that followed. The sudden collapse of commodity prices has resulted in mining companies scrambling to find the right balance between optimizing current operations and preserving sufficient flexibility to grasp future opportunities. The runaway costs of building and operating mines have almost squeezed out profit margins, while lower ore grades are inflating production costs. Mining companies therefore need to look at the business with fresh eyes, and develop strategies to attract equity capital as traditional approaches are simply not working anymore. This is especially so in the context of a dwindling investor base that continues to demand greater returns, despite a significantly lower appetite for risk. This paper revisits the micro-economic concepts and demonstrates how pressure from shareholders to prioritize output contributed to spiralling costs and value destruction. Practical techniques are described to model cost curves to optimize a Mineral Resource endowment and address the need to right-balance a business and preserve agility. |
|
Papers of General Interest Rock engineering aspects of a modified mining sequence in a dip pillar layout at a deep gold mine Jooste, Y. Malan, D.F. Abstract in English: Scattered mining was practised on Kusasalethu Mine (previously Elandsrand Gold Mine) prior to 1998, but at deeper mining levels it was no longer feasible, since it would have resulted in unacceptably high stress levels and energy release rates. Longwall mining was not adopted at these depths as the mine required a more flexible mining method owing to the highly variable grade and the presence of geological structures. A mining method was developed that consisted of dip stabilizing pillars for regional support, as well as bracket pillars to clamp geological structures. A strict sequence of extraction was followed and this, together with the particular layout, was called the 'sequential grid mining method'. This method addressed two key problems, namely negotiating adverse geology and the erratic grade of the Ventersdorp Contact Reef (VCR) orebody. However, a significant drop in production rates resulted in the need for alternatives and improvements to the original mine design. Modifications to the design were proposed in order to increase production rates, and an investigation to consider the rock engineering implications of these modifications was conducted. The study indicated that the modified method, called the 'multi-raise mining method', appears to be feasible and might address some of the production problems that were experienced with the original sequential grid design. An analysis of actual seismic data showed no significant differences between the original sequential grid mining and the implemented multi-raise mining. The numerical modelling of the mining layouts showed slightly higher interim energy release rates (ERRs) and average pillar stress (APS) levels during the extraction process. The final values are nevertheless identical to that of the original sequence. The study also investigated the use of a modelled moment method to analyse future seismic trends. The study illustrated that the expected seismic trends will be very similar for the multi-raise method compared to the original sequential grid mining method. This study is nevertheless considered of a preliminary nature and ongoing monitoring and analysis of seismic data at the mine is required to verify the response of the rock mass to the modified sequence and increased extraction rate. In particular, future work needs to investigate the effect of mining rate (advance rates in individual panels as well as volume of mining in particular raise lines) on the level of seismicity. |
|
Papers of General Interest Classification of roof strata and calculation of powered support loads in shallow coal seams of China Liu, X. Song, G. Li, X. Abstract in English: According to the overlying rock strength and thickness of 10 shallow coal seams in China, the strata are classified into four types: weak and laminated strata (hereinafter referred to as WL), weak and massive strata (WM), strong and laminated strata (SL), and strong and massive strata (SM). The four types of strata, together with longwall panel height (M), panel length (L), and seam depth (H) are factors that influence the loads on hydraulic power supports. Principal component analysis was used to study the seven influencing factors. It turns out that seam depth (H) is multicollinear with WL, WM, SL, and SM. Thus the enumerated seven factors are divided into two models. In Model 1, six factors; panel height, panel length, and layer thickness of the four type strata are involved. In Model 2, three factors; panel height, panel length, and seam depth are included. Using multivariate regression analysis, two equations to calculate loads on supports are obtained for each model. The equations were applied to shallow coal seams. The equation of Model 1 is more accurate than that of Model 2, but Model 2 could be further used in deep coal seams. The equations were coded through VB programming to simplify the calculation. |
|
Papers of General Interest 1D numerical simulation of velocity amplification of P-waves travelling through fractured rock near a free surface Zhang, P. Swan, G. Nordlund, E. Abstract in English: The most widely used support design damage criterion for rockburst-prone mines is based upon kinetic energy, which is proportional to the square of the ejection velocity and is commonly expressed in terms of peak particle velocity (PPV). Field monitoring and back-analyses have shown that ejection velocities of the order of 10 m/s and higher can result from seismic events of moderate magnitude. Such velocities are much higher than those predicted using PPV obtained from scaling laws. It has also been found that the peak ground motion (i.e. PPV) on the surface of an excavation is preferentially amplified (by four- to tenfold) compared to the motion in solid rock at a similar distance from the source. However, the wave propagation and interaction processes involved within the fractured rock in generating high ground motion are very complex and are not well understood at this time. In this paper, velocity amplification was investigated by modelling the dynamic interaction between fractured rock and a free surface using a 2D discontinuum-based numerical program, UDEC (Universal Distinct Element Code). A 1D model with a fractured zone was used to represent the fractured rock. Velocity amplification, quantified by PPV, predicted at the free end of the model was 2.0-3.6 times higher than the input velocity. It was found that the wave frequency, fracture stiffness, fracture spacing, and thickness of fractured zone are the main factors that affect the velocity amplification. The results have proved that the interaction of the seismic wave and multiple fractures near the free surface strongly influences the ground motion. |
|
Sancot Conference Papers A review of current tunnelling technology and boring applications in mining and infrastructure development - An EPCM perspective Gouws, S.C. Abstract in English: Sustainable infrastructure development has long been identified as a key enabler for socio-economic growth and poverty reduction in societies globally. Twenty-one years into the young South African democracy, economic prospects are fragile and unemployment statistics are high. According to Trading Economics (2015) the GDP growth rate in South Africa averaged 3.07% from 1993 until 2015. Through the National Development Plan 2030, the government has responded by instituting the Presidential Infrastructure Coordinating Commission (PICC) to direct national growth and drive job creation by effecting a long-term infrastructure investment programme. The Commission is mandated by Cabinet to coordinate, integrate, and accelerate implementation of more than 150 individual social and economic infrastructure plans. In the civil infrastructure development sector, increased urbanization is compelling governments and the public sector to expand safe and reliable public amenities, but the availability of real estate for construction in congested cities is a challenge. Within the mining infrastructure construction industry safe, rapid, and efficient mine extraction strategies are imperative to realize increased production, business hurdle rates, and stakeholder expectations. Asset owners and stakeholders are obliged to consider advanced mechanized underground excavation and support technologies in order to present feasible solutions timeously. From an engineering design, procurement, and construction management (EPCM) perspective tunnelling technology and boring applications have a distinct advantage over conventional excavation techniques. These solutions may enhance commerce and transportation by expanding infrastructure in concentrations of national economic activity, providing crucial linkages with rural areas, between cities, and across international borders. This paper explores the contribution by mechanized tunnelling technology and boring applications applied in conjunction with digital and automation technologies compared with conventional methodologies. The technological expertise, combined with a paradigm shift in delivery of project objectives, will promote economic growth, aid recovery from the economic downturn, and improve social development. |
|
Sancot Conference Papers Sprayed concrete for underground excavations - A status report Viljoen, B.C. Abstract in English: Commencement of the next phase of the Lesotho Highlands Water Project is a year or so away from becoming reality. Some 50 km of tunnels in the form of access adits, shafts, diversion tunnels, and main waterways will be constructed. Sprayed concrete will form an integral part of the temporary and permanent rock support systems that will be installed. Furthermore, the use of sprayed concrete as a final tunnel lining solution was proposed as a viable alternative to concrete linings in the feasibility studies that preceded the forthcoming implementation phase. The aim of this paper is to make the reader aware of all the sprayed concrete related issues that engineers tend to grapple with during the design and construction of tunnel projects and other underground works. Primarily, these issues would include selection of applicable design parameters, technical specifications, construction application methods, quality control and, most importantly in the context of final or permanent linings, the durability of sprayed concrete. The International Tunnelling Association (ITA) Working Group (WG) 12 has been tasked specifically to publish a set of recommendations on the Quality and Control of the Application of Sprayed Concrete and the Testing of Sprayed Concrete for Durability. These tasks were also further explored at the recent World Tunnel Congress (WTC 2015) that was held in Dubrovnik, Croatia at the end of May 2015. |
|
SANCOT News South African National Committee on Tunelling Young Members Group - 'SANCOT - YMG' Nene, L. |
|
President's Corner A sense of belonging Jones, R.T. |
|
Journal Comment Surface Mining September 2014 Luckmann, J. |
|
Articles Be not afraid of greatness- Wits unveils Danie Krige display cabinet of memorabilia Hance, S. |
|
Articles Cutting-edge technology to be included in Mine Surveyors Competency Certificate van Wyk, T. |
|
Articles The Career Development in the Minerals Industry Event 2015 - The SAIMM Young Professionals' Council (SAIMM-YPC) 31 July 2015 Mmola, T. |
|
Articles Application Program Interface Guideline review Ednie, H. |
|
Articles New requirements for mine dumps and stockpiles by Cormac Cullinan, Director, Cullinan & Associates Cullinan, Cormac |
The Southern African Institute of Mining and Metallurgy
The Southern African Institute of Mining and Metallurgy, 5 Hollard Street, P.O. Box 61127, Marshalltown, Johannesburg, Gauteng, ZA, 2107, Tel: +27 11 834 1273, Tel: +27 11 834 1277 -
E-mail: journal@saimm.co.za
Read our Open Access Statement
