Open-access Burning pyrites compared to sulphur

SYNOPSIS

Present day capital costs are analysed for a 2 000 metric tonne per day (MTPD) pyrite burning plant and compared with a sulphur burning plant of the same capacity. Power, raw material and steam production rates are then compared for the two facility types. A sensitivity analysis is conducted to highlight the impact changing sulphur, pyrite, capital and operating costs have on the relative economics of these feeds.
Technological improvement effects on capital cost and energy recovery are also discussed. Besides the steam produced from the burning of pure sulphur or pyrite, plants using an advanced form of heat recovery can produce up to 10 bar steam using heat from acid formation. The quantity depends on the overall water balance which is influenced by such factors as gas strength and product acid concentration. Modern materials and innovative process design also improve the ability to increase the high pressure steam from the roaster boiler in pyrite plants above the traditional 1.25 kg of superheated steam per kg of acid produced.

“Full text available only in PDF format”

Publication Dates

  • Publication in this collection
    25 Jan 2017
  • Date of issue
location_on
The Southern African Institute of Mining and Metallurgy The Southern African Institute of Mining and Metallurgy, 5 Hollard Street, P.O. Box 61127, Marshalltown, Johannesburg, Gauteng, ZA, 2107, Tel: +27 11 834 1273, Tel: +27 11 834 1277 - E-mail: journal@saimm.co.za
rss_feed Acompañe los números de esta revista en su lector de RSS
Ir para arriba