Open-access Instability of topsoil benches of a pit caused by dumping of waste rock outside an opencast coal mine

Abstract

One of the consequences of large-scale opencast mining for coal is the disposal of an enormous volume of overburden material that needs to be removed. With the enlargement of opencast mines and associated high stripping ratios, the volume of overburden extraction is rising. Overburden from the initial mine cut has to be necessarily dumped outside the mining area until enough void is created inside the mine for back-filling operations. The quantity of overburden placed outside the mining area normally varies from 10% to 30% of the total overburden removal. The stability of these dumps placed outside the mining area is of prime importance from the point of view of smooth operations of the mines and safety of persons in and around the dumping area. Owing to increasing pressure on land use, mine operators do not have any other option other than to place the waste dumps very near to the surface edge of the pit, which may lead to failure of the topsoil benches of the working pit. This study identified major controlling parameters that influence a stable but economic combination of height and slope angle of external dumps located close to the edge of an open coal pit.

slope stability; circular failure; opencast mining; shear strength parameters; overburden dump


location_on
The Southern African Institute of Mining and Metallurgy The Southern African Institute of Mining and Metallurgy, 5 Hollard Street, P.O. Box 61127, Marshalltown, Johannesburg, Gauteng, ZA, 2107, Tel: +27 11 834 1273, Tel: +27 11 834 1277 - E-mail: journal@saimm.co.za
rss_feed Acompanhe os números deste periódico no seu leitor de RSS
Ir para o topo