A set of six design principles for rock engineering was developed by Bieniawski: design objectives; minimum uncertainty; simplicity of design components; state-of-the-art practice; optimization; and constructability. These principles translate into a ten-step design process. Although this methodology was developed for rock engineering, it is applicable to any design process, feasibility study, etc. Diligent use of such a process will ensure that a defensible design or evaluation has been carried out. Recently a 'strategic conversation' process has been identified by Ilbury and Sunter that includes the following ten steps: scope; players; rules of the ame; key uncertainties; scenarios; SWOT analysis; options; decisions; measurable outcomes; and meaning of winning. A comparison of these steps with those of the design process shows a remarkable correlation. This is perhaps not surprising since engineering design is a strategic up-front issue, and front end loading in a project is critical to achieve the expected project performance. Based on the close correlation between the strategic conversation and engineering design processes, a circular design process, rather than a linear process, is proposed. The 'circle of design' better reflects the importance of review and monitoring in the two hases of successful design and implementation-defining the design, and executing the design.


SYNOPSIS

A set of six design principles for rock engineering was developed by Bieniawski: design objectives; minimum uncertainty; simplicity of design components; state-of-the-art practice; optimization; and constructability. These principles translate into a ten-step design process. Although this methodology was developed for rock engineering, it is applicable to any design process, feasibility study, etc. Diligent use of such a process will ensure that a defensible design or evaluation has been carried out. Recently a 'strategic conversation' process has been identified by Ilbury and Sunter that includes the following ten steps: scope; players; rules of the ame; key uncertainties; scenarios; SWOT analysis; options; decisions; measurable outcomes; and meaning of winning. A comparison of these steps with those of the design process shows a remarkable correlation. This is perhaps not surprising since engineering design is a strategic up-front issue, and front end loading in a project is critical to achieve the expected project performance. Based on the close correlation between the strategic conversation and engineering design processes, a circular design process, rather than a linear process, is proposed. The 'circle of design' better reflects the importance of review and monitoring in the two hases of successful design and implementation-defining the design, and executing the design.

“Full text available only in PDF format”

References

  • ABET. Accreditation Board for Engineering and Technology 1987. Fifth Annual Report, Washington, D.C. 1987.
  • BIENIAWSKI, Z.T. Towards a creative design process in mining, Mining Engineering, vol. 40, 1988. pp. 1040-1044.
  • BIENIAWSKI, Z.T. In search of a design methodology for rock mechanics, Rock Mechanics as a Multidisciplinary Science, Proc. 32nd U S Symp. on Rock Mech., Roegiers (ed.), Balkema, 1991. pp. 1027-1036.
  • BIENIAWSKI, Z.T. Invited Paper: Principles of engineering design for rock mechanics, Rock Mechanics, Proc. 33rd U S Symp. on Rock Mech., Tillerson and Wawersik (eds.), Balkema, 1992. pp. 1031-1040.
  • BIENIAWSKI, Z.T. Principles and methodology of design for excavations in geologic media, Research in Engineering Design, vol. 5, 1993. pp. 49-58.
  • HILL, P.H. Techniques in teaching creative engineering design, Proc. ASEE Annual Conference, American Society for Engineering Education, New York. 1983.
  • ILBURY, C. and SUNTER, C. Games foxes play-planning for extraordinary times, Human & Rosseau Tafelberg, 2005. 180 pp.
  • REDFORD, M.S. and TERBRUGGE, P.J. Vertical pit mining-a novel alternative to open pit and underground methods for mining of appropriate massive shallow orebodies, Proc. MassMin 2000, Brisbane, AusIMM. 2000.

Publication Dates

  • Publication in this collection
    25 Jan 2017
  • Date of issue
location_on
The Southern African Institute of Mining and Metallurgy The Southern African Institute of Mining and Metallurgy, 5 Hollard Street, P.O. Box 61127, Marshalltown, Johannesburg, Gauteng, ZA, 2107, Tel: +27 11 834 1273, Tel: +27 11 834 1277 - E-mail: journal@saimm.co.za
rss_feed Stay informed of issues for this journal through your RSS reader
Go to top