Open-access Automatic closed-loop scheduling in underground mining using discrete event simulation

Abstract

Today's mining operations require fast reporting and rapid rescheduling based on updated information. An automatic mine scheduling system could not only quickly reschedule but also propose alternative solutions. To avoid the financial and physical risks associated with testing such a system directly in operation, it could be first evaluated via discrete event simulation models. This would offer a safe environment to evaluate different operating rules and algorithms. In this study, this is achieved by integrating automatic scheduling software with a discrete event simulation model.

discrete event simulation; production planning; scheduling system; underground mining


location_on
The Southern African Institute of Mining and Metallurgy The Southern African Institute of Mining and Metallurgy, 5 Hollard Street, P.O. Box 61127, Marshalltown, Johannesburg, Gauteng, ZA, 2107, Tel: +27 11 834 1273, Tel: +27 11 834 1277 - E-mail: journal@saimm.co.za
rss_feed Acompañe los números de esta revista en su lector de RSS
Ir para arriba