Open-access A zero-one integer programming model for open pit mining sequences

Abstract

The aim of short-term production scheduling is to decide which blocks of ore and waste to mine in which time period (shift, days, weeks or months) so that several operational and geometrical constraints can be satisfied simultaneously. Since 1960s several mathematical programming approaches were developed for solving production scheduling problems that are based on a combination of various operational research approaches such as linear programming (LP), integer programming (IP), dynamic programming (DP), etc. A number of models have been developed in the past three decades but some models have limited application especially to geometrical mining constraints. One of the geometrical constraints is block accessibility. All blocks must be accessible to mining equipments on the same bench. In this paper a binary integer programming model is developed in order to incorporate block accessibility constraints in an efficient manner. This mathematical model insures that each block has been open and can be loaded and transported easily by shovels and trucks


SYNOPSIS

The aim of short-term production scheduling is to decide which blocks of ore and waste to mine in which time period (shift, days, weeks or months) so that several operational and geometrical constraints can be satisfied simultaneously. Since 1960s several mathematical programming approaches were developed for solving production scheduling problems that are based on a combination of various operational research approaches such as linear programming (LP), integer programming (IP), dynamic programming (DP), etc. A number of models have been developed in the past three decades but some models have limited application especially to geometrical mining constraints. One of the geometrical constraints is block accessibility. All blocks must be accessible to mining equipments on the same bench. In this paper a binary integer programming model is developed in order to incorporate block accessibility constraints in an efficient manner. This mathematical model insures that each block has been open and can be loaded and transported easily by shovels and trucks.

“Full text available only in PDF format”

References

  • 1. SMITH, M.L. Optimization short-term production schedules in surface mining: Integrating mine modeling software with AMLP/CPLEX. International Journal of Surface Mining, Reclamation and Environmental, vol. 12, 1998, pp. 149-155.
  • 2. HUANG, S. Computer-based optimization of open pit mining sequences. Trans. Instn Min. Metall. (Sec A: Mining Industry), vol. 102, 1993. pp. A125-A133.
  • 3. WILKE, F.L. and REIMER, T.H. Optimizing the short-term production schedule for an open-pit iron ore mining system. Computer methods for the 80's in the mineral industry, Society of Mining Engineers of A.I.M.E, 1979. pp. 642-646.

Publication Dates

  • Publication in this collection
    25 Jan 2017
  • Date of issue
location_on
The Southern African Institute of Mining and Metallurgy The Southern African Institute of Mining and Metallurgy, 5 Hollard Street, P.O. Box 61127, Marshalltown, Johannesburg, Gauteng, ZA, 2107, Tel: +27 11 834 1273, Tel: +27 11 834 1277 - E-mail: journal@saimm.co.za
rss_feed Stay informed of issues for this journal through your RSS reader
Go to top