Logomarca do periódico: Journal of the South African Institution of Civil Engineering

Open-access Journal of the South African Institution of Civil Engineering

Publication of: South African Institution of Civil Engineering
Area: Engenharias
ISSN printed version: 1021-2019
Creative Common - by 4.0

Table of contents

Journal of the South African Institution of Civil Engineering, Volume: 67, Issue: 2, Published: 2025

Journal of the South African Institution of Civil Engineering, Volume: 67, Issue: 2, Published: 2025

Document list
Documents
Technical Paper
Flexible management of critical path method schedules in complex construction projects Ökmen, Ö

Abstract in English:

The Critical Path Method (CPM), the primary and widely used method of scheduling, is known to be inadequate when applied to complex construction projects characterised by high uncertainty and dynamic conditions. Additionally, when managing CPM schedules, utilising traditional plan-driven approaches that lack sufficient flexibility can worsen the situation. This study aims to propose a hybrid approach that incorporates both plan-driven and change-driven features for the flexible management of CPM schedules in complex construction projects. The approach leverages the flexibilities inherent in CPM and a number of flexibility-enabling agents identified from relevant literature. Because project phases have different conditions, two distinct hybrid processes were designed for implementation - one for the preconstruction phase and the other for the construction phase. The applicability of the approach was demonstrated retrospectively in a design project that faced a significant delay compared to the contractual requirement. This application revealed deficiencies that contributed to the delay of the project. The findings suggest that the delay could have been avoided with the proposed approach. Consequently, this approach has the potential to contribute to the development of enhanced project management methodologies. This study represents an initiative in this regard, specifically focusing on schedule management, a major component of project management.
Technical Paper
The strategic role of the enterprise portfolio management office in enabling the alignment and prioritisation of projects and programmes for organisational strategy execution Matlala, H Nel, H Pretorius, JHC

Abstract in English:

Organisations continue to face challenges in aligning and prioritising projects and programmes with strategic execution, and research shows that there is a need for organisations to develop a process that could assist them in achieving this. Using a survey study and literature, this study developed a conceptual model illustrating an ideal framework for aligning projects and programmes with organisational strategy execution. The model also proposes the optimal positioning of the enterprise portfolio management office (EPMO) within the organisational value chain to facilitate effective strategy execution and benefit management.
Technical Paper
Prediction of the fundamental period of infilled reinforced concrete frame structures using advanced machine learning methods Yahiaoui, A Markou, G Bakas, N Dorbani, S

Abstract in English:

The use of machine learning (ML) to solve civil engineering problems has increased remarkably during the last few decades due to its effectiveness in reliably approximating complex relationships. In this paper, a key parameter of seismic design is estimated using hyperparameter ML algorithms to develop predictive models that compute the fundamental period. Initially, the impact of the train-test split ratio was investigated using three different splits, where the best results were achieved with train-test split ratios equal to 90/10 for all metrics. By predicting the fundamental period with three ML methods, namely XGBoost-HYT-CV, DANN-MPIH-HYT, and RF-HYT, the best fit was acquired by XGBoost-HYT-CV (coefficient of determination R2 = 99.994% and mean absolute error MAE = 0.00428). Although international literature agrees that building height is the primary factor influencing the fundamental period, feature engineering has revealed that the natural logarithm of the percentage of openings is the most significant parameter. This finding underscores the value of feature engineering in generating additional variables and uncovering their impact on output variables. Finally, an equation was derived from POLYREG-HYT that outperformed all existing formulae, deriving a final MAE of 0.0153, approximately three times smaller than the best-performing equations proposed in the international literature.