Open-access A cost-benefit analysis of implementing a 54 MW solar PV plant for a South African platinum mining company: A case study

Abstract

A reliable and secure supply of energy is a prerequisite for adequate output and economic growth - especially in a platinum mining company. With exponential tariff increases, inadequate power supply leading to power cuts, and a carbon tax introduction, this study compared the costs with benefits by implementing a 54 MW solar photovoltaic (PV) plant. Two scenarios were compared over the same 20-year period in a case study of a South African platinum mining company operating in the platinum belt of Rustenburg. The first scenario was grounded upon the decision to proceed with the conventional manner of sourcing electricity from Eskom, South Africa's power utility. The second scenario assessed the implementation of a 54 MW solar PV plant. The findings reveal that the company could generate 2 439 753 MWh of clean energy over 20 years with an investment of ZAR 910 857 920, giving a ZAR 563 205 994 (11%) carbon tax saving and a ZAR 5 614 426 335 (10%) reduction in electricity costs. Further, installing the solar PV plant could reinforce the company's dedication to protecting the environment and creating job opportunities through the employment of staff to install and maintain the plant.Highlights • Cost and benefit analysis of implementing a solar PV plant • A case study in a South African platinum mining company • High electricity cost and carbon tax savings possible

solar PV; platinum mining; electricity; carbon tax; cost and benefit


location_on
The Department of Chemical Engineering of the University of Cape Town Department of Chemical Engineering, University of Cape Town, Private Bag X3, Rondebosch, Cape Town, Western Cape Province, ZA, 7701, Tel: +27 21 650 3892 - E-mail: journalofenergysouthernafrica@gmail.com
rss_feed Stay informed of issues for this journal through your RSS reader
Go to top