Open-access System adequacy in the Southern African Power Pool: A case for capacity mechanisms

Abstract

The requirement for increased investment in electrical energy infrastructure in the Southern African Power Pool (SAPP) region is contextualised. Background on the SAPP is provided for reference. A brief assessment of historical capacity adequacy in the SAPP region shows historically sustained levels of inadequacy as well as distinctive investment cycles primarily as a result of administratively determined generation capacity investments within each member country. The introduction of an appropriately designed capacity mechanism is proposed for SAPP to facilitate system adequacy and incentivise long-term capacity investment. Highlights • Increased investment in electrical energy infrastructure in the SAPP region is needed to enable increased electricity access and economic growth. • The SAPP region has exhibited historical sustained system inadequacy and distinctive investment cycles. • Competitive electricity trade is increasing and displacing bilateral contacts. • An appropriately designed capacity mechanism for SAPP could facilitate system adequacy and incentivise long-term capacity investment.

Interconnection; capacity investment; electricity access; competitive electricity trade; capacity mechanisms


location_on
The Department of Chemical Engineering of the University of Cape Town Department of Chemical Engineering, University of Cape Town, Private Bag X3, Rondebosch, Cape Town, Western Cape Province, ZA, 7701, Tel: +27 21 650 3892 - E-mail: journalofenergysouthernafrica@gmail.com
rss_feed Stay informed of issues for this journal through your RSS reader
Go to top