Open-access Climate change: The opportunity cost of Medupi and Kusile power stations

Eskom has embarked on the construction of two coal-fired power stations (Medupi and Kusile) that use a new dry-cooling process with flue gas desulphurisation (FGD). While the introduction of these new technologies does have meaningful environmental benefits beyond the conventional coal-fired power stations, they still emit greenhouse gasses. The question at stake here is what is the opportunity cost, viewed from a climate change perspective, of these two new power stations? This question is answered by considering the carbon footprint of the two power stations and a range of unit values for CO2. From this analysis, it is evident that the most likely range of the opportunity cost is between R6.3 billion and R10.7 billion per year. This converts to a damage cost of between R0.10 and R0.17/kWh when assuming a net combined generation capacity of 8 677 MW and a load factor of 85%.

climate change; Medupi; Kusile; opportunity cost


location_on
The Department of Chemical Engineering of the University of Cape Town Department of Chemical Engineering, University of Cape Town, Private Bag X3, Rondebosch, Cape Town, Western Cape Province, ZA, 7701, Tel: +27 21 650 3892 - E-mail: journalofenergysouthernafrica@gmail.com
rss_feed Acompañe los números de esta revista en su lector de RSS
Ir para arriba