Tabla de contenido
Journal of Construction Project Management and Innovation, Volumen: 14, Numero: 1, Publicado: 2024Journal of Construction Project Management and Innovation, Volumen: 14, Numero: 1, Publicado: 2024
| Documents |
|---|
|
Articles Building resilience: quantity surveyors in the face of future pandemics Modiba, Matshete Harinarain, Nishani Resumen en Inglés: This paper investigates the transformative impact of the global pandemic in the field of quantity surveying, specifically focusing on the challenges encountered by quantity surveyors and the resultant modifications in their professional activities. The study aims to equip quantity surveyors with valuable insights, fostering resilience to enable them to adapt and thrive amidst adversities. Employing a qualitative research approach, this study utilises interviews to delve into the challenges faced by quantity surveyors and identifies the essential traits necessary for future resilience. Six experienced quantity surveyors were purposively selected for in-depth interviews, and the collected data were subjected to thematic analysis to uncover prevailing trends and themes. The study reveals a spectrum of direct and indirect effects induced by the pandemic within the quantity surveying profession. Noteworthy impacts include alterations in work dynamics, modifications in site evaluations, increased instances of cost overruns, shifts in contract interpretation, and changes in the preparation of monthly payment certificates. As uncovered by the findings, resilience is not synonymous with avoiding challenges; instead, it involves the ability to adapt, learn, and grow stronger through adversity. Adopting resilient practices and mindset is crucial for quantity surveyors to navigate uncertainties and challenges effectively. This research not only enhances the resilience of quantity surveying as a profession but also imparts valuable lessons for mitigating the impact of future pandemics. By understanding the challenges and adaptations brought about by the pandemic, quantity surveyors can proactively shape their practices, ensuring a robust and resilient future for the profession. |
|
Articles Premature pavement failure of a Superpave asphalt mix – a unique failure mechanism Otto, Andrew Kakoto, Denis Lekea, Angella Resumen en Inglés: Research outputs undertaken in temperate climates require adaptation and customisation before they can be applied to tropical conditions. This often requires the use of research trial sections with a revised technology. The construction and performance monitoring of trial sections takes time, often spanning several years. However, the demands of road agencies can mean that there is insufficient time to undertake the necessary trials. In such cases, large scale projects are often undertaken with inflated factors of safety. This frequently results in higher execution costs and no guarantees of adequate performance. This paper examines the circumstances under which the application of Superpave asphalt mix design technology in a major road project in Uganda (a tropical country) resulted in premature pavement failure, which started within two years of completion. The Superpave asphalt mix design method was developed under the Strategic Highways Research Programme in the United States of America (a temperature region), funded by AASHTO. Defects were first observed on the project road (Mbarara to Katuna) during the works execution and within the one-year defects liability period. To assess the performance of the sections, detailed visual condition surveys were undertaken; asphalt cores were used to test for strength, water sensitivity, and volumetric characteristics in the laboratory. Deflection measurements and analysis were also carried out. The results showed that the pavement failure was confined to the asphalt surfacing. The Superpave asphalt mix did not perform as expected, due to the difference in climatic, traffic, and construction characteristics Adjustments should have been made, based on findings from trial sections, to make the surfacing suitable for tropical conditions. Ultimately, tropical countries should engage in coordinated and targeted applied research that places emphasis on the adaptation of technologies. |
|
Articles Development of a public road works contract management framework for the Zambian construction industry Munga, Lutangu Mwiya, Balimu Resumen en Inglés: It is critical that the funds allocated towards public road infrastructure are utilized prudently to achieve value for money whilst meeting project objectives. Therefore, contracts which facilitate the attainment of significant value are utilized. However, these contracts are seldom reviewed. Furthermore, ineffective Contract Management is a frequent occurrence in Zambia. In view of the foregoing, the aim of this study was to develop a Public Road Contract Management framework for the Zambian Construction Industry (ZCI). The study adopted a sequential exploratory research design to identify and determine the associated challenges and critical success factors (CSFs), respectively, throughout the Contract Management cycle in the ZCI. This was achieved by ranking the challenges and CSFs based on the data collected through questionnaire surveys from 92 respondents. The major challenges in each phase of the cycle viz. Initiation, Planning/Procurement, Implementation/Administration, Monitoring & Control and Closure were that viability of strategic plans is affected by political regime changes, failure to allocate the contract with the required budget, lengthy payment processes, delay in payments for satisfactory performance and lack of reviews to document lessons learnt and best practices, respectively. The top CSFs in each phase were preparation of comprehensive feasibility studies; allocating the contract with the required budget; adequate funding during implementation; monitoring being carried out by qualified, competent, and experienced personnel; and enhanced record keeping, respectively. Statistical analysis of the data using the Spearman correlation coefficient showed that there was a strong positive relation between Contract Administration/ Implementation, and Monitoring and Control. The developed framework is expected to facilitate timely completion of roadworks that are executed to the desired quality at the budgeted cost and thereby achieve successful Public Road Works Contract Management. |
|
Articles Estimation of pavement layer moduli of thin-sealed roads for use in pavement management systems Ngwira, Christopher Otto, Andrew Chilonda, Presley Chilukwa, Nathan Mwale, Andrew Resumen en Inglés: Condition assessment and maintenance of vast road networks is a challenge both technically and financially in many low and middle-income countries (LMICs). It often requires rapid data collection techniques, quick analysis of the data, accurate defect identification, and appropriate allocation of scarce funds. The Falling Weight Deflectometer (FWD) equipment can be used for rapid non-destructive techniques of assessing the condition of road pavement layers. Many road agencies in LMICs are acquiring FWDs and Pavement Management Systems (PMS) for data collection and maintenance planning. The analysis of FWD data requires rigorous back-calculation techniques that cannot be easily integrated into PMS. Surface deflection bowl parameters (DBP) have since been used for classification of pavement conditions. However, DBP do not yield values of layer elastic moduli, that are increasingly being used in rehabilitation design. Moreover, the DBP that are currently in use are applicable to roads with at least 50 mm asphalt concrete surfacing and have not been checked for validity on roads incorporating thin bituminous seals such as chip seal, and cape seal. Thus, a system that rapidly estimates layer elastic moduli from DBP and that can be easily integrated into PMS is required now and in the near future, for LMICs. Defective sections or pavement layers identified through this approach can then undergo more rigorous analysis using FWD specialist back-calculation software. This study developed equations that reliably estimate the layer moduli from DBP of pavements surfaced with thin bituminous seals. This was done through conducting FWD tests on selected road sections, conducting back-calculation using specialist software, and testing which DBP best correlates with the back-calculated elastic moduli. These equations are used to rapidly identify pavement layers and sections that are deteriorating season by season, and hence, target and plan appropriate maintenance interventions. |
|
Articles A participatory data-driven approach for unpaved road condition monitoring Mbiyana, Keegan Kans, Mirka Resumen en Inglés: Unpaved roads, usually found in rural and sparsely populated areas, are prone to dust, potholes, corrugations, rutting and loose gravel and deteriorate faster than paved roads. Thus, they require regular condition monitoring to keep them at the required level of service. However, the cost of condition assessment could be huge, considering how vast and far away they are from the cities. Currently, subjective visual surveys and manual methods for monitoring and assessing the condition of unpaved roads dominate, while data-driven objective methods are not commonly applied for maintenance planning and decision-making. The paper proposes a participatory data-driven approach for unpaved road condition monitoring based on the literature and an exploratory case study of road maintenance practices in Sweden and Zambia. Participatory data collection empowers regular unpaved road users to collect road condition data, for instance, by equipping their vehicles with the relevant data acquisition devices embedded with a global positioning system (GPS) as they drive on unpaved roads on a typical day. By integrating open data collection aligned with sustainable practices, regular unpaved road users (garbage collectors, postal service providers, and road owners) share the collected condition data with the road governing bodies and process it for Nowcasting and Forecasting the unpaved road condition, thus providing valuable information for condition monitoring of unpaved roads. Thus, road users can support long-term maintenance planning and decision-making, potentially improving unpaved road management and minimising the cost of collecting and evaluating unpaved road condition data. However, the participating road users require training in data acquisition, and the vehicles must be calibrated according to the sensor properties, vehicle vibration response and speed to ensure quality data collection. Based on the literature and the case study findings, participatory data collection for unpaved roads can provide an efficient and effective alternative for collecting road condition data, accomplishing broad coverage. |
|
Articles Determination of optimum shape of pinned parabolic arch structures under uniformly distributed loads: a blend of cost and functionality Mbachu, Victor M. Okonkwo, Victor O. Resumen en Inglés: The construction industries are faced with multiple decisions that border around functionality and cost. Such a decision is made when considering the geometry of arches. In this work, hinged arch structures were examined under uniformly distributed static loads, and an attempt to find the best arch height for any given arch span was made. An optimum orientation of the elements of two-hinged parabolic arch structures was selected based on the manufacturing cost, which was adjudged by the volume of concrete consumed. Stress - strain analysis was used to compute the volume of the arch, while the usefulness or benefit of the arch was taken as the ratio of the frames' cross-sectional area to their perimeter. Graphs of the cost-benefit ratio against arch height f were plotted for different values of arch span, and the values of arch height corresponding to minima cost/benefit were obtained. These values were found to be independent of the ratio of the load to the product of arch thickness and grade of arch material (w/σb). A table showing the values of economic arch height for different values of arch span was presented, and a reliable model (polynomial equation) was developed. |
Lea la Declaración de Acceso abierto
