Research Articles Utilisation of forecasting technology for improving construction logistics in Nigeria Isah, Yahaya Shakantu, Winston Ibrahim, Saidu Abstract in English: The need to investigate new technology for forecasting purposes in construction logistics is due to the fact that the forecasting ability (modern technology utilisation) of the Nigerian construction sector, in terms of logistics management, is relatively low when compared to manufacturing and retailing industries. This is affecting the performance of the construction sector. Moreover, the current logistics technologies used for forecasting operations in the Nigerian construction industry are relatively inefficient and insufficiently investigated to inspire new logistics technologies for the construction industry. Hence, this article investigated how forecasting logistics technologies could be utilised in manufacturing and retailing industries, in order to improve the forecasting processes of construction logistics. Lagos State and Abuja, the Federal Capital Territory of Nigeria, formed the selected geographical scope of the study, from which five manufacturing; five retailing companies, and five construction projects were purposely selected. A mixed methods research strategy were used. The research instruments included an observation guide (quantitative) and semi-structured interviews (qualitative). The collected quantitative data were analysed, using descriptive analytical tools: frequencies and percentiles. The qualitative data was analysed, using the thematic method. The results revealed that all the observed manufacturing industries (100%) adopted the Enterprise Resource Planning (ERP) technology for forecasting purposes in the following areas: material, demand, product, and production forecast. Of the observed companies in the manufacturing and retailing industries, 80% and 40%, respectively, adopted the Material Requirement Planning (MRP) technology for forecasting purposes. Only 20% (one project) of the observed construction projects adopted the MRP technology for forecasting in the following: 5% for demand forecast (demand control); 6.7% for material forecast (stock control), and 20% for product forecast (product output). It was also revealed that utilisation of the forecasting technology in construction could have the following benefits: proper resource planning; improved production scheduling; reduction in inventory; effective treatment of scheduling problems, and efficiency of the supply-chain system. Results showed that effective utilisation of forecasting technology in the logistics system of the construction industry could lead to full efficiency gains in forecasting logistics of the construction industry. It is recommended that the Nigerian construction industry should leverage on this, in order to create the best ways of handling the forecasting technology to improve the forecasting logistics systems of the construction process.Abstract in af: Die behoefte om nuwe tegnologie vir voorspellingsdoeleindes in konstruksielogistiek te ondersoek, is te wyte aan die feit dat die voorspellingsvermoë (moderne tegnologie-gebruik) van die Nigeriese konstruksiesektor, wat logistieke bestuur betref, relatief laag is in vergelyking met die vervaardigings- en kleinhandelbedrywe. Dit beïnvloed die prestasie van die konstruksiesektor. Boonop is die huidige logistieke tegnologieë wat gebruik word vir voorspellingsbedrywighede in die Nigeriese konstruksiebedryf relatief ondoeltreffend en word onvoldoende ondersoek om nuwe logistieke tegnologieë vir die konstruksiebedryf te inspireer. Daarom het hierdie artikel ondersoek hoe die voorspelling van logistieke tegnologieë in die vervaardigings- en kleinhandelbedrywe gebruik kan word om die voorspellingsprosesse van konstruksielogistiek te verbeter. Lagos-staat en Abuja, die Federale hoofstadgebied van Nigeria, vorm die geselekteerde geografiese omvang van die studie, waaruit vyf vervaardiging; vyf kleinhandelondernemings, en vyf bouprojekte is doelbewus gekies. 'n Gemengde navorsingsmetode is gevolg. Die navorsingsinstrumente het 'n waarnemingsgids (kwantitatiewe) en semi-gestruktureerde onderhoude (kwalitatief) bevat. Die versamelde kwantitatiewe data is geanaliseer met behulp van beskrywende analitiese instrumente: frekwensies en persentiele. Die kwalitatiewe data is met behulp van die tematiese metode ontleed. Die resultate het aan die lig gebring dat al die waargenome vervaardigingsbedrywe (100%) die Enterprise Resource Planning (ERP) -tegnologie gebruik het vir voorspellingsdoeleindes in die volgende gebiede: materiaal, vraag, produk en produksieskatting. Van die waargenome ondernemings in die vervaardigings- en kleinhandelbedrywe het onderskeidelik 80% en 40% die Materiaalvereistesbeplanningstegnologie (MRP) vir voorspellingsdoeleindes aangewend. Slegs 20% (een projek) van die waargenome bouprojekte het die MRP-tegnologie vir voorspelling in die volgende gebruik: 5% vir vraagvoorspelling (vraagbeheer); 6,7% vir wesenlike voorspelling (voorraadbeheer) en 20% vir produksieskatting (produkuitset). Dit is ook aan die lig gebring dat die gebruik van die voorspellingstegnologie in die konstruksie die volgende voordele kan inhou: behoorlike hulpbronbeplanning; verbeterde produksieskedulering; vermindering in voorraad; effektiewe behandeling van skeduleringsprobleme en die doeltreffendheid van die voorsieningskettingstelsel. Die bevindinge toon dat die effektiewe gebruik van voorspellingstegnologie in die logistieke stelsel van die konstruksiebedryf tot volle effektiwiteitswinste in die voorspellingslogistiek van die konstruksiebedryf kan lei. Dit word aanbeveel dat die Nigeriese konstruksiebedryf gebruik maak hiervan om die beste maniere te kry om die voorspellingstegnologie te hanteer om die voorspellingslogistieke stelsels tydens die konstruksieproses te verbeter. |
|
Research Articles The impact of the integrated residential development programme on surrounding property values: case study of fleurhof, Johannesburg Mnisi, Nontokozo Karam, Aly Abstract in English: South Africa is challenged with an increased backlog of adequate subsidised affordable housing for the marginalised in well-located areas that provide access to urban amenities and places of employment. However, the perception of subsidised affordable housing developments built in the urban core in close proximity to bonded properties is significantly negative. This article seeks to address whether the presence of subsidised affordable housing provided through South Africa's Integrated Residential Development Programme (IRDP) impacts on the property value of bonded properties located nearby. This article examines the impact of the subsidised affordable housing development of Fleurhof, Johannesburg, on surrounding property values. It investigates, in particular, whether the IRDP housing development decreases property values. Using hedonic pricing models (HPM) with regressions, the housing attributes (characteristics) and property price data, dating from 2001 to 2017, were used to determine the effect on the value of properties in the suburbs of Meadowlands East Zone 1 and Orlando West in Soweto and Florida in Roodepoort, as the two closest residential communities to Fleurhof. The article reveals that the close proximity of the housing development in the initial stages (2001-2010) of the development affected property values negatively. However, in the long run, the housing development does not affect property values.Abstract in af: Die agterstand in voldoende gesubsidieerde bekostigbare behuising vir gemarginaliseerders, in goedgeleë gebiede wat toegang bied tot stedelike geriewe en werkplekke, is 'n uitdaging vir Suid-Afrika. Daar is egter 'n negatiewe persepsie oor die bou van gesubsidieerde bekostigbare behuisingsontwikkelings in die stadskern naby omgewings met eiendomme waarop verbande geregistreer is. In hierdie artikel word aandag gegee aan die vraag of die teenwoordigheid van gesubsidieerde bekostigbare behuising wat deur die Suid-Afrikaanse Geïntegreerde Residensiële Ontwikkelingsprogram (IRDP) aangebied word, die eiendomswaarde van die verbandgeregistreerde eiendom wat in die naby omgewing geleë is, beïnvloed. Hierdie artikel ondersoek die impak van die gesubsidieerde ontwikkeling van bekostigbare behuising in Fleurhof, Johannesburg, op die omliggende eiendomswaardes, en veral of die IRDP-behuisingsontwikkeling eiendomswaardes verlaag. Deur gebruik te maak van hedoniese prysmodelle (HPM) met regressies, is die behuisingseienskappe en eiendomsprysgegewens vanaf 2001 tot 2017 gebruik om die waarde van eiendomme in die voorstede van Meadowlands East Zone 1 en Orlando West in Soweto en Florida in Roodepoort, as die twee woongemeenskappe naaste aan Fleurhof, te ontleed. Die studie toon dat die nabyheid van die huisontwikkeling in die beginfases (20012010) van die ontwikkeling eiendomswaardes negatief beïnvloed het. Op die lange duur beïnvloed die ontwikkeling van behuising egter nie die eiendomswaardes nie. |
|
Research Articles Risk assessment for hazard exposure and its consequences on housing construction sites in Lagos, Nigeria Kasim, Oluwasinaayomi Faith Alabi, Adekunle Moruf Wusu, Sunday Abstract in English: Despite housing construction's economic contribution, the nature of work done is well acknowledged as risky to execute because of the occupational accidents and work-related hazards to which workers are exposed. Most of the workers experience hazards, owing largely to inadequate or lack of safety infrastructure and mechanisms for protective gear. This article examines varying levels of hazards to which workers are exposed at housing construction sites in Lagos, Nigeria. A mixed methods research was used to collect the necessary data for the study. From the total number of 511 residential building construction sites identified, simple random sampling technique was used to select 255 (50%) of the buildings. A questionnaire was administered to the supervisors on each site to obtain information on the exposure of hazards on housing construction sites. In addition, one month's data on incidents of near miss, accident and fatal cases were obtained from construction managers/supervisors for each site. The data was analysed with frequencies, percentages and inferential statistics. Construction workers are exposed to multifaceted hazards. Roughly 91% of the respondents had witnessed hazards of varying degrees. Paired t-test values showed that, on average, 25.3 more near misses and 12.4 more accidents happened monthly on sites supervised by individuals/ owners than on sites supervised by trained supervisors. The Pearson's r test (r = -0.705) showed that not enough first-aid kits were provided on sites to meet the needs of workers. Proper safety mechanisms to ensure strict adherence to safety rules and regulations at construction sites must be developed and enforced.Abstract in af: Ondanks die ekonomiese bydrae van behuisingskonstruksie, word die aard van die werk wat gedoen word, as riskant beskou omdat daar werksongelukke en gevare is waaraan werkers blootgestel word. Die meeste werkers ervaar gevare weens grootliks onvoldoende of gebrek aan veiligheidsinfrastruktuur en meganismes vir beskermingsuitrustings. Hierdie artikel ondersoek verskillende vlakke van gevare waaraan werknemers op die konstruksieterreine in Lagos, Nigerië, blootgestel word. Navorsing met gemengde metodes is gebruik om die nodige gegewens vir die studie te versamel. Uit die 511 geïdentifiseerde konstruksieterreine vir residensiële geboue, is 'n eenvoudige ewekansige steekproefnemingstegniek gebruik om 255 (50%) van die geboue te selekteer. 'n Vraelys is aan die toesighouers op elke terrein gegee om inligting te bekom oor die blootstelling van gevare op behuisingskonstruksieterreine. Ook een maand se data oor voorvalle van byna-misse, ongelukke en noodlottige gevalle is verkry van elke deelnemende konstruksiebestuurder/toesighouer. Die data is geanaliseer met frekwensies, persentasies en inferensiële statistieke. Konstruksiewerkers word blootgestel aan veelsydige gevare. Ongeveer 91% van die respondente het in verskillende mate gevare gesien. Gepaarde t-toetswaardes het getoon dat gemiddeld 25.3 meer byna-misse en 12.4 meer ongelukke maandeliks plaasgevind het op persele wat deur individue/eienaars onder toesig was as op terreine onder toesig van opgeleide toesighouers. Die Pearson r-toets (r = -0.705) het getoon dat daar nie genoeg noodhulpkissies op die terrein beskikbaar is om in die behoeftes van werkers te voorsien nie. Behoorlike veiligheidsmeganismes om streng nakoming van veiligheidsreëls en regulering op konstruksieterreine te verseker, moet ontwikkel en toegepas word. |
|
Review articles Isivivane, Freedom Park: A critical analysis of the relationship between commemoration, meaning and landscape design in post-apartheid South Africa Young, Graham Vosloo, Piet Abstract in English: At the dawn of democracy in 1994, the nation was seeking a new identity and for many South Africans it was to be an identity based on their African culture and tradition. Politicians were seeking ways to commemorate those who had lost their lives in conflicts leading up to the first democratic elections when the African National Congress (ANC) came into power. In attempting to achieve this, the Department of Arts and Culture initiated several legacy and heritage projects, including the Isivivane, a memorial place at Freedom Park in the City of Tshwane. This article determines the effectiveness of landscape design in communicating the intent and meaning of commemorative places in a multicultural postapartheid society. In this article, the Isivivane is presented as a case study and the research survey has been used to gauge the visitors' experience and perception of the Isivivane. Based on the results of a quantitative questionnaire, underpinned by theories rooted in phenomenological interpretation and landscape narrative, the article confirms that peoples' experience and perception of the Isivivane are influenced by its design and that its landscape features are significant in evoking a response that enabled visitors to identify with the place and assign individual and collective meaning to it. The argument is supported by current theories of commemoration and meaning derived through landscape design. The implications of the study are useful and can potentially open doors for further studies that delve deeper into an understanding of the contribution that landscape design makes in the conceptualisation of commemorative places in a pluralistic and politically charged South Africa.Abstract in af: Met die aanvang van demokrasie in 1994, het die volk gestreef na 'n nuwe identiteit en vir baie moes dit 'n identiteit wees gebaseer op hul Afrika-kultuur en -tradisies. Politici het ook maniere gesoek om die te herdenk wat hul lewens tydens konflikte in die aanloop tot die eerste demokratiese verkiesings, waarna die ANC aan bewind gekom het, verloor het. In die strewe om dit te bereik, het die Departement van Kuns en Kultuur verskeie nalatenskap- en erfenisprojekte geïnisieer, insluitend die Isivivane, 'n gedenkteken by Freedom Park in die Stad Tshwane. Die doel van hierdie artikel is om die effektiwiteit van landskapontwerp te bepaal om die bedoeling en betekenis van sulke herdenkingsplekke in 'n multikulturele, post-apartheid Suid-Afrikaanse samelewing oor te dra. In die artikel word die Isivivane aangebied as 'n gevallestudie en 'n empiriese data-opname is gebruik om die besoekers se ervarings en persepsies van Isivivane te bepaal. Gebaseer op die bevindings van die studie bestaande uit 'n kwantitatiewe vraelys, ondersteun deur teorieë gewortel in fenomenologiese vertolking en landskapnarratiewe, bevestig die artikel dat mense se ervaring en persepsie van die Isivivane beïnvloed word deur die ontwerp en kenmerke van die landskap en dat laasgenoemde betekenisvol is by die ontlokking van 'n reaksie wat besoekers met die plek laat identifiseer en individuele en kollektiewe betekenis daaraan laat toeken. Die argument word ondersteun deur huidige teorieë oor herdenking en betekenis wat afgelei kan word deur landskapontwerp. Die implikasies van die studie is nuttig en kan moontlik deure oopmaak vir verdere studies wat dieper delf in 'n begrip van die bydrae wat landskapontwerp lewer in die konseptualisering van herdenkingsplekke in 'n pluralistiese en politiesgelaaide Suid-Afrika. |
|
Review articles An assessment of the causes of schedule and cost overruns in South African megaprojects: A case of the critical energy sector projects of Medupi and Kusile Tshidavhu, Fhumulani Khatleli, Nthatisi Abstract in English: Cost and schedule overruns are the most common challenges in mega construction projects around the globe, and South Africa is no different. Although comparatively small in number, megaprojects have an inordinate number of projects failing, due to budget overflow and schedule slippage. This article assessed the causes of cost and schedule overruns as well as the challenges with the implementation of critical construction megaprojects, using Kusile and Medupi energy-sector megaprojects in South Africa. Using a quantitative research method, which included a literature review and a questionnaire survey, identified the causes of schedule and cost overruns as well as the challenges militating against the project's implementation success. Data was collected from engineers, quantity surveyors, architects, contractors, and project managers who were randomly selected from the two megaprojects, Medupi and Kusile. Data was analysed using mean score ratings and ranking. The results revealed that slow client decision-making, shortages of skilled labour, inaccurate material estimating, unforeseen ground conditions, poor material planning, changes in scope of work on-site, contractual claims, variation orders and poor site management were the major causes of schedule and cost overruns. Findings show that the top five challenges (poor site management, inadequate managerial skills, poor monitoring and control, unstable management structure, and lack of experience together with poor organisation structures) is all management and organisational related, showing that there is not enough local management and organisational expertise in South Africa to ensure the proper planning and effective implementation of energy megaprojects. This article is relevant, as it contributes to the understanding of key challenges faced by megaprojects in the context of a developing country. Specific solutions that mitigate the causes of schedule and cost overruns should be investigated in future studies.Abstract in af: Oorskryding van koste en skedules is die mees algemene uitdagings in mega-konstruksieprojekte regoor die wêreld, en Suid-Afrika is nie anders nie. Alhoewel dit relatief klein is, het megaprojekte 'n buitengewone aantal projekte wat misluk as gevolg van oorloop van die begroting en glyplanne. Hierdie artikel het die oorsake van koste- en skedule-oorskrywings, sowel as die uitdagings met die implementering van megaprojekte vir kritiese konstruksie, met behulp van megaprojekte vir die energiesektor (Kusile en Medupi) in Suid-Afrika, ondersoek. Deur gebruik te maak van 'n kwantitatiewe navorsingsmetode, wat 'n literatuuroorsig en 'n vraelysopname insluit, is die oorsake van skedule- en koste-oorskrydings, asook die uitdagings met megaprojekimplementering, geïdentifiseer. Data is versamel van ingenieurs, bourekenaars, argitekte, kontrakteurs en projekbestuurders wat lukraak gekies is uit die twee megaprojekte, Medupi en Kusile. Data is geanaliseer met behulp van gemiddelde telling graderings en posisie. Die resultate toon dat trae kliëntbesluitneming, tekort aan geskoolde arbeid, onakkurate materiaalberaming, onvoorsiene grondtoestande, swak materiaalbeplanning, veranderinge in werkomvang op die terrein, kontraktuele eise, afwykingsbevele en swak terreinbestuur die belangrikste oorsake van die skedule- en koste-oorskryding was. Resultate toon dat die top vyf uitdagings (swak terreinbestuur, onvoldoende bestuursvaardighede, swak monitering en beheer, onstabiele bestuurstruktuur en gebrek aan ervaring tesame met swak organisasiestrukture) alles bestuurs- en organisatories verwant is. Dit toon dat daar nie genoeg plaaslike bestuurs-en organisasiekundigheid in Suid-Afrika is om die behoorlike beplanning en effektiewe implementering van energie-megaprojekte te verseker nie. Hierdie artikel is relevant, aangesien dit bydra tot die begrip van die belangrikste uitdagings wat megaprojekte in die konteks van 'n ontwikkelende land in die gesig staar. In toekomstige studies moet spesifieke oplossings ondersoek word om die oorsake van skedule- en koste-oorskrydings te verlig. |
|
Review articles Early sustainable architecture in hanging skyscrapers - a comparison of two financial office buildings Vosloo, Christo Abstract in English: Reuse, or the ability to continue using an item or building beyond the initial function, is a key concept in the literature on sustainability. This implies that a building should be designed in a way that will allow it to be repurposed when changing circumstances require changes in its layout or function; being energy efficient and environmentally sensitive is not enough. The building also needs to be financially viable and the people whose lives are impacted by it should wish to have it retained. As far as flexibility of high-rise or skyscraper buildings is concerned, the structural system and layout are some, but not the only aspects that are of particular importance in this regard. Upside-down or 'hanging' buildings, because of the reduced use of columns, can potentially provide advantages when viewed from such a widened understanding of sustainability. Two such buildings are the Hong Kong and Shanghai Bank (HSBC) headquarters building in Hong Kong and the Standard Bank Centre (SBC) in Johannesburg. The SBC stands virtually unused and in disrepair, while the HSBC remains fully operational and revered by the population of Hong Kong. This article compares the design and construction processes of the two buildings to determine why these two buildings ended up in such divergent situations. The aim is to make recommendations regarding structural systems and other factors that could assist in ensuring that future skyscrapers will be more sustainable, in addition to being energy and resource conserving. Furthermore, this comparison sheds some light on the historical development of the understanding of sustainability and the difference between green design and sustainable design.Abstract in af: Hergebruik, of die vermoë om 'n produk of gebou se lewensduurte vir so lank as moontlik te verleng nadat die oorspronklike funksie of gebruikspatrone verander het, is 'n sleutelbegrip in die literatuur oor volhoubaarheid. By implikasie is dit belangrik om geboue so te ontwerp dat hul uitleg en funksies aangepas kan word om hul bruikbare leeftyd vir so lank as moontlik te verleng. Omgewingsvriendelike ontwerp is nie genoeg nie en daar is meer aspekte wat 'n rol mag speel. Ander faktore is finansiële volhoubaarheid en die verhouding tussen die gebou en diegene wat dit voortdurend gebruik. Wat toringblokke betref, speel die strukturele stelsel (onder meer) 'n sleutelrol in hierdie verband. Onderstebo- of 'hangende' geboue kan hier groot voordele inhou aangesien die verminderde aantal kolomme groter aanpasbaarheid beteken. Dit beteken egter nie dat hierdie tipe geboue noodwendig meer volhoubaar is nie. Twee van hierdie tipe geboue het in wyduiteenlopende situasies beland. Die gebou van die Hong Kong and Shanghai Bank (HSBC) se hoofkwartier in Hong Kong word ten volle benut en is 'n gewaardeerde landmerk in die stad; hierteenoor is daar die Standard Bank Sentrum (SBC) in Johannesburg waarvan die gebou en die openbare ruimte daaromheen grootliks in onbruik verval het. In hierdie artikel word die ontwerp asook die ontwerp- en konstruksieprosesse van die twee landmerkgeboue vergelyk ten einde te bepaal hoekom hulle in sulke kontrasterende situasies verkeer. Die doel is om aanbevelings te maak rakende die verskillende struktuurtipes en ander faktore wat die volhoubaarheid van toekomstige toringblokke kan beïnvloed. Die vergelyking sal ook lig werp op die ontwikkeling van die begrip 'volhoubaarheid' en die verskil tussen groen en volhoubare ontwerp. |
|
Book Reviews Architectures of informality Ahmed, Ar.Sayed |