Table of contents
Acta Structilia, Volume: 25, Issue: 1, Published: 2018Acta Structilia, Volume: 25, Issue: 1, Published: 2018
| Documents |
|---|
|
Research Articles An exploratory factor analysis of risk management practices: A study among small and medium contractors in Gauteng Renault, Bérenger Agumba, Justus Ansary, Nazeem Abstract in English: Risk management (RM) is acknowledged as a key activity in project management in the pursuit to deliver successful construction projects. However, these projects are associated with various risks, which often jeopardise project performance, especially among small and medium construction enterprises (SMEs). Risk management practices (RMPs) have been developed, in order to curtail project risks. Nevertheless, there is no consensus on the practices that constitute RM for SME projects. Therefore, the main purpose of this research is to determine the RMPs that can be tailored for construction SMEs to manage risk in their projects, in order to achieve project success. An extensive review of relevant literature on RMPs was conducted and used to develop a structured questionnaire posted to construction SMEs who were conveniently sampled in the Gauteng province of South Africa. The empirical findings established nine RMPs that were reliable and valid for managing risk in projects undertaken by construction SMEs, namely organizational environment; defining project objectives; resource requirements; risk measurement; risk identification; risk assessment; communication approach and evaluation; risk response and action planning, as well as monitoring and review. It is important to note that the study was not conducted across South Africa; hence, the findings cannot be generalized. Despite the delimitation, the researchers recommend that these practices are for risk management in construction projects undertaken by SMEs in South Africa.Abstract in af: Risikobestuur (RB) word erken as 'n sleutelaktiwiteit in projekbestuur in die strewe om suksesvolle konstruksieprojekte te lewer. Hierdie projekte word egter geassosieer met verskeie risiko's wat projekprestasie dikwels in gevaar stel, veral onder klein en medium konstruksie-ondernemings (KMO's). Risikobestuurspraktyke (RBP) is ontwikkel om projekrisiko's te beperk. Tog is daar geen konsensus oor die praktyke wat RB vir KMO-projekte uitmaak nie. Die hoofdoel van hierdie navorsing is dus om die RBP te bepaal wat aangepas kan word vir konstruksie-KMO's om risiko in hul projekte te bestuur ten einde projeksukses te behaal. 'n Uitgebreide literatuurstudie oor RBP is gedoen en gebruik om 'n gestruktureerde vraelys te ontwikkel wat aan konstruksie-KMO's in die Gauteng provinsie van Suid-Afrika gepos is. Die empiriese bevindinge het nege RBP opgestel wat betroubaar en geldig was vir die bestuur van risikos in projekte wat deur konstruksie-KMO's onderneem is, naamlik organisatoriese omgewing; definisie van projekdoelwitte; hulpbronvereistes; risiko-meting; risiko-identifikasie; risikobepaling; kommunikasiebenadering en evaluering; risikoreaksie en aksiebeplanning, sowel as monitering en hersiening. Dit is belangrik om daarop te let dat die studie nie oor die hele Suid-Afrika uitgevoer is nie; daarom kan die bevindings nie veralgemeen word nie. Ten spyte van die beperking, beveel die navorsers aan dat hierdie praktyke is wat vir risikobestuur in konstruksieprojekte deur KMO's in Suid-Afrika onderneem moet word. |
|
Research Articles An assessment of the causes, cost effects and solutions to design-error-induced variations on selected building projects in Nigeria Dosumu, Oluwaseun Aigbavboa, Clinton Abstract in English: Design errors and variations are inherently part of many construction projects and require deliberate effort to combat. The literature reviewed indicates that empirical studies of the cost effect of design-error-induced variations are scarce. This study investigates the causes of variation on building projects, the frequent design errors that lead to variation, the effects of design error on variation cost, and solutions to design-error-induced variation in design documents. A mixed methods research (interviews and 30 case study building projects) was used to collect the necessary data for the study. Interviews were conducted with 25 construction professionals to obtain information on the causes of variation on building projects and solutions to design-error-induced variation on building construction projects. Thirty documents including valuation breakdowns and variation/change order documents were obtained by convenience sampling technique and used for the extraction of design errors leading to variations and their associated costs. The data was analysed with frequencies and percentages. The study found that poor working drawing and lack of coordination among design documents are the major causes of variation. Errors in design calculations and wrong descriptions in specifications are prominent design errors that led to variation. Design errors account for roughly 36% of the variation cost of building projects. Structural and architectural drawings contain the largest number of errors among design documents, but electrical and mechanical documents have the highest contribution to variation cost. The study concluded that variation costs could be minimized if government policies, aimed at ensuring proper contract documentation, were put in place, and construction professionals were limited to their core roles on construction projects. Rechecking of design documents prior to use, knowledge sharing, and use of computer programs were among the recommended solutions to design-error-induced variation in project documents.Abstract in af: Ontwerpfoute en -variasies vorm inherent deel van baie konstruksieprojekte wat doelbewuste pogings verg om te bestry. Die literatuuroorsig dui daarop dat empiriese studies van die koste-effek van ontwerpfout-geïnduseerde variasie skaars is. Daarom ondersoek hierdie studie die oorsake van ontwerpfout-geïnduseerde variasie, hul effekte op variasiekoste en oplossings vir ontwerpfoute in ontwerpdokumente. Die studie is uitgevoer op geselekteerde bouprojekte in Nigerië. Die gemengde metode van onderhoud- en 30 gevallestudie-bouprojekte is aangeneem in die versameling van die nodige data vir die studie. Onderhoud is met 25 konstruksiekenners gevoer om inligting te verkry oor die oorsake van variasie en oplossings om foute van boukonstruksieprojekte te ontwerp. Dertig dokumente wat insluit waardasie-afbreekpunte en variasie-/veranderingsopdragdokumente is verkry deur die gemaksbepalingstegniek en gebruik vir die onttrekking van ontwerpfoute wat lei tot variasies en hul verwante koste. Die data is geanaliseer met frekwensies, somme en persentasies. Die studie het bevind dat swak werktekening en gebrek aan koördinasie onder ontwerpdokumente die hoofoorsake van variasie is. Foute in ontwerpberekeninge en verkeerde beskrywing in spesifikasies is die prominente ontwerpfoute wat tot variasie gelei het. Ontwerpfoute verteenwoordig tot 36% van die variasiekoste van bouprojekte. Strukturele en argitektoniese tekeninge bevat die meeste foute onder ontwerpdokumente, maar elektriese en meganiese dokumente maak die grootste bydrae tot variasiekoste. Die studie het tot die gevolgtrekking gekom dat variasiekoste in 'n groot mate tot 'n minimum beperk kan word indien regeringsbeleid om behoorlike kontrakdokumentasie te verseker, ingestel word en professionele persone beperk word om die werk van ander professionele persone te doen. Herontwerp van ontwerpdokumente voor gebruik, kennisdeling en gebruik van rekenaarprogramme is onder die aanbevole oplossings om foute van projekdokumente te ontwerp. |
|
Research Articles Successful transformational change in revenue management among beneficiary communities of South African renewable energy construction companies Amansure, Ric Adendorff, Chris Abstract in English: Transformational change is the second of three sub-models that resulted from the splitting of the original model following the data analysis as part of a thesis entitled A theoretical model for successful management of revenue for beneficiary communites of renewable energy companies in South Africa. The sub-model provides specific guidance for project managers dealing with transformational change in communities to stakeholders, industry experts and community development practitioners in the renewable energy sector. The aim of the research was to promote a localised understanding of education, social interaction, social cohesion, infrastructure improvement and sharing to ensure success in managing the revenue for beneficiary community projects by renewable energy construction companies. A literature review of relevant literature on transformational change factors was conducted and used to develop a structured questionnaire distributed to national and international population of project management practitioners who were conveniently sampled in South Africa. Using an electronic measuring instrument, the empirical findings established four factors that were reliable and valid for transformational change in communities, namely education, infrastructure development, human development, and change management. Using these factors and constructing a path diagram of the independent variables (education, infrastructure development, human development, change management) and subsequent intervening (good governance) and dependent variables (perceived success of revenue management), appropriate hypotheses were developed to test the model. The hypotheses were analysed and tested empirically using Structural Equation Modelling (SEM). Determinants were identified as elements of transformational change that influence the success of revenue management for beneficiary communities for South African renewable energy companies. These included the use of education, infrastructure development, human development, change management, and good governance.Abstract in af: Transformatoriese verandering is die tweede van drie submodelle wat voortspruit uit die opbreking van die oorspronklike model na die data-analise as deel van 'n proefskrif getiteld A theoretical model for successful management of revenue for beneficiary communities of renewable energy companies in South Africa. Die submodel bied spesifieke leiding aan projekbestuurders wat handel oor transformasieverandering binne gemeenskappe aan belanghebbendes, kundiges in die bedryf en gemeenskapsontwikkelingspraktisyns in die hernu-bare energie sektor. Die doel van die navorsing was om 'n gelokaliseerde begrip van onderwys, sosiale interaksie, sosiale samehorigheid, verbetering van infrastruktuur en deel te bevorder om sukses te behaal in die bestuur van die inkomste vir begunstigde gemeenskapsprojekte deur hernubare energie konstruksiemaatskappye. 'n Literatuurstudie van relevante literatuur oor transformasieveranderingsfaktore is gedoen en gebruik om 'n gestruktureerde vraelys te ontwikkel wat aan nasionale en internasionale populasie van projekbestuurspraktisyns in Suid-Afrika versprei is. Met behulp van 'n elektroniese meetinstrument het die empiriese bevindinge vier transformasiefaktore gevind wat betroubaar en geldig was vir transformasieverandering in gemeen-skappe, naamlik onderwys, infrastruktuurontwikkeling, menslike ontwikkeling, en veranderingsbestuur. Met behulp van hierdie faktore en die konstruksie van 'n vloeidiagram van die onafhanklike veranderlikes (onderwys, infrastruktuurontwikkeling, menslike ontwikkeling, en veranderingsbestuur) en die daaropvolgende tussenliggende (goeie bestuur) en afhanklike veran-derlikes (waargeneme sukses van inkomstebestuur) is toepaslike hipoteses ontwikkel om die model te toets. Die hipoteses is empiries geanaliseer met behulp van strukturele vergelyking modellering (SEM). Determinante is geïdentifiseer as elemente van transformasieverandering wat die sukses van inkomstebestuur vir begunstigde gemeenskappe vir Suid-Afrikaanse hernubare energie maatskappye beïnvloed. Dit sluit in die gebruik van onderwys, infrastruktuurontwikkeling, menslike ontwikkeling, veranderingsbestuur, en goeie bestuur. |
|
Research Articles A construction project management knowledge model: The type and level of knowledge required Burger, Michelle Zulch, Benita Abstract in English: Construction project managers come from diverse backgrounds and may, therefore, lack the knowledge set currently required in order to be competent and effective in practice. The aim of this article is to establish the National Qualifications Framework (NQF) level of each type of knowledge area required for a competent and effective construction project manager in South Africa. These levels of knowledge are important, in order to develop a proposed construction project management knowledge model to be used by the construction industry. A mixed methods research design was used, including structured questionnaires (n = 40), interviews (n = 10), and a single case study. The questionnaire survey, using close-ended questions measured on a 5-point Likert scale, tests the importance of and rated the NQF qualification levels of each knowledge type fit for project managers in the built environment. The rating assisted in knowing to what knowledge depth project managers need to be educated and trained. Interviews were conducted with 10 construction professionals to obtain their views on the importance of industry-specific knowledge of a construction project manager and to critically review the form of knowledge considered essential. The case study of a building project to the value of R35 million was used to gain understanding of the impact that industry-specific knowledge, or the lack thereof, may have on the successful completion of a project. Results showed that qualifications to gain industry-specific knowledge should at least be on NQF level 6; a qualification on NQF level 7 is recommended to gain adequate project management knowledge (theory). These findings are important, as some construction project management courses in South Africa are currently below NQF level 6. This may be contributing to industry not producing construction project managers with the required knowledge set. The proposed model outlines the adequate knowledge sets and level thereof that can be used when designing training and educational degrees for construction project managers. The proposed model could also be used in practice as a guideline for placing or promoting construction project managers.Abstract in af: Konstruksieprojekbestuurders kom van uiteenlopende agtergronde, en mag dus die kennisstel kort wat tans benodig word om vaardig en effektief in die praktyk te wees. Die doel van hierdie artikel is om die Nasionale Kwalifikasieraamwerk (NKR)-vlak van elke tipe kennisarea vas te stel wat benodig word vir 'n bevoegde en effektiewe bouprojekbestuurder in Suid-Afrika. Hierdie vlakke van kennis is belangrik om 'n voorgestelde konstruksieprojekbestuur-kennismodel te ontwikkel wat deur die konstruksiebedryf gebruik kan word. 'n Gemengde metodes navorsingsontwerp is gebruik, insluitend gestruktureerde vraelyste (n = 40), onderhoude (n = 10) en 'n enkele gevallestudie. Die vraelys-opname deur middel van geslote vrae het die belangrikheid van en gegradeerde NKR-vlakke van elke kennissoort geskik vir projekbestuurders in die beboude omgewing, gemeet op 'n 5-punt Likert-skaal. Die gradering het gehelp om te weet tot watter kennisdiepte projekbestuurders opgelei moet word. Onderhoude is gevoer met 10 konstruksiewerknemers om hul standpunte oor die belangrikheid van bedryfspesifieke kennis van 'n konstruksieprojekbestuurder te verkry en om die vorm van kennis wat noodsaaklik beskou word, krities te hersien. Die gevallestudie van 'n bouprojek ten bedrae van R35 miljoen is gebruik om begrip te kry van die impak wat bedryfspesifieke kennis, of die gebrek daarvan, op die sukses van 'n projek kan hê. Resultate het getoon dat kwalifikasies om bedryfskennis te verkry, ten minste op NKR-vlak 6 moet wees; 'n kwalifikasie op NKR-vlak 7 word aanbeveel om voldoende projekbestuurskennis (teorie) te verkry. Hierdie bevindings is belangrik aangesien sommige konstruksieprojekbestuurskursusse in Suid-Afrika tans laer as NKR-vlak 6 is. Dit kan bydra daartoe dat die industrie tans konstruksieprojekbestuurders sonder die vereiste kennisstel in diens neem. Die voorgestelde model beskryf die toereikende kennisstelle en vlak daarvan wat gebruik kan word by die ontwerp van opleidingskwalifikasies vir konstruksieprojekbestuurders. Die voorgestelde model kan ook in die praktyk gebruik word as riglyn om konstruksieprojekbestuurders te plaas of te bevorder. |
|
Research Articles Assessment of housing quality in Ibeju-Lekki peri-urban settlement, Lagos State, Nigeria Adedire, Funmilayo Adegbile, Michael Abstract in English: This article assesses housing quality in Ibeju-Lekki, a peripheral settlement outside Lagos metropolitan region. Using purposive sampling, 370 housing units from clusters of 16 peri-urban settlements constituted the sample size. Primary data was sourced through structured questionnaires, interview (with local planning personnel) and observation schedules administered through a field survey. Using Statistical Package for Social Sciences, data analysis was done using descriptive analysis to generate frequencies and percentages on socio-economic profile, neighbourhood quality, locational quality, dwelling quality, and building materials used. Tests of correlation were conducted on the mean of variables of neighbourhood quality, locational quality and building materials, derived through recoding of variables by means of Transform statistical tool, to establish the factors influencing housing quality in the study area. The findings show a significant positive correlation between household income and housing quality. The latter is found to be influenced by respondents' socio-economic attributes, building materials, neighbourhood quality, and locational quality in the study area. It can be concluded that socio-economic characteristics, predominantly income of households, play a major role in the level of housing quality that can be accessed in the study area. It is, therefore, recommended that the state government and private developers should promote alternative building materials, in order to enhance housing affordability by the low-income group. This will reduce the spread of informal housing development. In addition, the state government should align urban policy to eliminate disparity in infrastructural development which has impacted on poor neighbourhood and locational quality in Lagos peri-urban settlements.Abstract in af: Hierdie artikel evalueer behuisingsgehalte in Ibeju-Lekki, 'n perifere nedersetting buite die Lagos Metropolitaanse streek. Met behulp van doelgerigte steek-proefneming, is 370 behuisingseenhede uit groepe van 16 stedelike nedersettings gekies om die steekproefgrootte te verteenwoordig. Primêre data is verkry deur gestruktureerde vraelyste, onderhoud (met plaaslike beplanning personeel) en waarnemingsskedules opgestel tydens veldwerk. Met behulp van die Statistiese Pakket vir Sosiale Wetenskappe SSPS 22 is data-analise gedoen met behulp van beskrywende analise om frekwensies en persentasies op sosio-ekonomiese profiel, buurtkwaliteit, liggingskwaliteit, woonkwaliteit en boumateriaal te genereer. Korrelasietoetse is gedoen op die gemiddeldes van veranderlikes van buurtkwaliteit, lokasiekwaliteit en boumateriaal, afgelei deur herkodering van hierdie veranderlikes deur die Transform statistiese instrument, om die faktore wat behuisingskwaliteit in die studiegebied beïnvloed, vas te stel. Die resultate toon 'n beduidende positiewe verband tussen huishoudelike inkomste en behuisingskwaliteit. Behuisingskwaliteit word ook beïnvloed deur die respondente se sosio-ekonomiese eienskappe, boumateriaal, buurtkwaliteit en liggingskwaliteit in die studiegebied. Daar kan afgelei word dat sosio-ekonomiese eienskappe, hoofsaaklik inkomste van huishoudings, 'n belangrike rol speel in die vlak van behuisingskwaliteit wat in die studiegebied verkry kan word. Daar word dus aanbeveel dat die staatsregering en private ontwikkelaars alternatiewe boumateriaal bevorder om die behuisings-bekostigbaarheid van die lae inkomstegroep te verbeter. Dit sal die verspreiding van informele behuisingsontwikkeling verminder. Ook moet die staatsregering die stedelike beleid in ooreenstemming bring om ongelykheid in infrastruktuurontwikkeling uit te skakel wat die swak omgewing en liggingskwaliteit in Lagos peri-stedelike nedersettings beïnvloed het. |
|
Review article Construction project management through building contracts, a South African perspective du Plessis, Hendri Oosthuizen, Pierre Abstract in English: This article reviews construction project management and building contracts in South Africa. It introduces general information and findings on the topic, forming part of a broader in-depth study, which proves difficult to encapsulate in one single article. The novice might perceive contract management, project management, and construction management to be the same concept. To clarify these concepts, the evolution of construction contracts and project management was studied to identify possible similarities between these concepts. This article commences with a brief history prior to a schematic analysis of the general characteristics of construction contracts and project management. It investigates the application of these concepts within South Africa and compares the general structure of the main contracts used within South Africa. This general investigation clearly shows that the standard conditions of contracts used in South Africa have similar structures to the main construction project management knowledge areas recognised by the Project Management Institute (PMI). The article also reviews the four general conditions of contracts endorsed by the Construction Industry Development Board (CIDB) in South Africa and investigates the general clauses and themes of these contracts. The Construction Contract should consider all the Project Life-Cycle (PLC) stages. The Construction Contract should further be regarded as the Project Implementation Plan (PIP), on which the control procedures during construction are based. With the understanding of the evolution of the two streams (contracts and management), their relevance, goal, dependencies and responsibilities may be understood better. This may enhance the professional manner in which the management of the entire Project Life-Cycle (PLC) is implemented and approached.Abstract in af: Die artikel beskou konstruksieprojekbestuur en boukontrakte in Suid-Afrika. Dit stel algemene inligting en resultate voor oor die onderwerp, wat deel uitmaak van 'n wyer indiepte studie, wat moeilik is om in een enkele artikel te vervat. Die beginner kan soms kontrakbestuur, projekbestuur en konstruksiebestuur as dieselfde konsep beskou. Om hierdie konsepte te verduidelik, is die evolusie van konstruksiekontrakte projekbestuur bestudeer om moontlike ooreenkomste te identifiseer. Hierdie artikel begin met 'n kort geskiedenis voor 'n skematiese analise van die algemene kenmerke van konstruksiekontrakte en projekbestuur. Die artikel ondersoek die toepassing van hierdie begrippe binne Suid-Afrika en vergelyk die algemene struktuur van die hoofkontrakte wat in Suid-Afrika gebruik is met mekaar. Uit hierdie algemene ondersoek is dit duidelik dat die standaardvoorwaardes van kontrakte wat in Suid-Afrika gebruik word, baie soortgelyke strukture het in vergelyking met die belangrikste konstruksieprojekbestuursareas soos erken deur die Projekbestuursinstituut (PMI). Die artikel beskou die vier kontrakte wat deur die Konstruksiebedryf-ontwikkelingsraad (CIDB) in Suid-Afrika onderskryf is en ondersoek die algemene klousules en temas van hierdie kontrakte. Die konstruksie kontrak moet al die Projek Lewensiklus (PLC) stadiums in ag neem. Die Konstruksie Kontrak moet verder gesien word as die Projek Implementeringsplan (PIP), waarmee beheer tydens konstruksie toegepas moet word. Met dié begrip van die evolusie van die twee strome (kontrakte en bestuur), kan hul relevansie, doel en afhanklikhede beter verstaan word. Dit kan die professionele manier waarop die totale Projek Lewensiklus (PLC) geïmplementeer en benader word, verbeter. |
|
Book review Facilities Management Practice by A.C. Hauptfleisch, 2017. 1st edition. Pretoria: South Africa: Career Excel Academy van Rensburg, Nico Janse |