Abstract
Network fault levels are reported to be increasing and this is often attributed to an increase in network interconnectivity and localised generation. When the fault level at a substation increases beyond the rated value of the installed equipment, a power utility traditionally responded by either (i) replacing the equipment with higher rated equipment or, (ii) installing series reactors or, (iii) replacing the existing transformers with high impedance transformers. Using a South African case study, this paper compares both the effectiveness and financial viability of a superconducting fault current limiter (SFCL) against the traditional three options. When one also considers the operational or 'energy' cost associated with all these options it was found that a high capital cost was sometimes offset by lower energy costs over a 25 year service life. Regional prices of electricity and tariffs therefore have a significant impact on a utility's choice of fault management solutions.
fault level management; power system management; superconducting fault current limiters