SciELO - Scientific Electronic Library Online

SciELO - Scientific Electronic Library Online

Article References

ASAD, M.W.A.  and  DIMITRAKOPOULOS, R.. Performance evaluation of a new stochastic network flow approach to optimal open pit mine design-application at a gold mine. J. S. Afr. Inst. Min. Metall. [online]. 2012, vol.112, n.7, pp. 649-655. ISSN 0038-223X.

    1. ASKARI-NASAB, H., POURRAHIMIAN, Y., BEN-AWUAH, E.,and KALANTARI, S. Mixed integer linear programming formulations for open pit production scheduling. Journal of Mining Science, vol. 47, no. 3, 2011. pp. 338-359. [ Links ]

    2. ELKINGTON, T. and DURHAM, R. Integrated open pit pushback selection and production capacity optimization. Journal of Mining Science, vol. 47, no. 2, 2011. pp. 177-190. [ Links ]

    3. NAZAROV, I.V. and KORTELEV, O.B. Modeling anopen pit mine in a multitest statement. Journal of Mining Science, vol. 37, no. 3, 1993. pp. 434-439. [ Links ]

    4. BAKHTAVAR, E., SHAHRIAR, K., and ORAEE, K. Transition from open-pit to underground as a new optimization challenge in mining engineering. Journal of Mining Science, vol. 45, no. 5, 2009. pp. 485-494. [ Links ]

    5. DAVID, M. Geostatistical Ore Reserve Estimation. Elsevier Scientific Publishing Company, Amsterdam, 1977. [ Links ]

    6. DAVID, M. Handbook of Applied Advanced geostatistical ore reserve estimation. Elsevier Science, Amsterdam, 1988. [ Links ]

    7. DIMITRAKOPOULOS, R., FARRELLY, C.T., and GODOY, M. Moving forward from traditional optimization: grade uncertainty and risk effects in open pit design. Transactions of the Institute of Mining and Metallurgy (Section A: Mining Technology), vol. 111, 2002. pp. 82-88. [ Links ]

    8. GODOY, M.C. and DIMITRAKOPOULOS, R. Managing risk and waste mining in long-term production scheduling. Transactions of the Society of Mining Engineers of AME, vol. 316, 2004. pp. 43-50. [ Links ]

    9. GOOVAERTS, P. Geostatistics for Natural Resources Evaluation. Oxford University Press, New York, 1997. pp. 483. [ Links ]

    10. BOUCHER, A. Sub-pixel mapping of coarse satellite remote sensing images with stochastic simulations from training images. Mathematical Geosciences, vol. 41, no. 3, 2009. pp. 265-290. [ Links ]

    11. BOUCHER, A. and DIMITRAKOPOULOS, R. Block simulation of multiple correlated variables. Mathematical Geosciences, vol. 41, no. 2, 2009. pp. 215-237. [ Links ]

    12. HORTA, A. and AMILCAR, S. Direct sequential co-simulation with joint probability distributions. Mathematical Geosciences, vol. 42, no. 3, 2010. pp. 269-292. [ Links ]

    13. HOCHBAUM, D.S. and CHEN, A. Performance analysis and best implementations of old and new algorithms for the open-pit mining problem. Operations Research, vol. 48, no. 6, 2000. pp. 894-914. [ Links ]

    14. CHANDRAN, B.G. and HOCHBAUM, D.S. A computational study of the pseudoflow and push-relabel algorithms for the maximum flow problem. Operations Research, vol. 57, no. 2, 2009. pp. 358-376. [ Links ]

    15. TACHEFINE, B. and SOUMIS, F. Maximal closure on a graph with resource constraints. Computers and Operations Research, vol. 24, no. 10, 1997. pp. 981-990. [ Links ]

    16. HOCHBAUM, D.S. Efficient algorithms for the inverse spanning tree problem. Operations Research, vol. 51, no. 5, 2003. pp. 785-797. [ Links ]

    17. WHITTLE, J. Beyond optimization in open pit design. Proceedings of the Canadian Conference on Computer Applications in the Mineral Industries, 1988. pp. 331-337. [ Links ]

    18. LERCHS, H. and GROSSMANN, I.F. Optimum design of open pit mines. CIM Transactions, vol. 58, 1965. pp. 17-24. [ Links ]

    19. JOHNSON, T.B. Optimum open pit mine production scheduling. PhD Thesis, Department of IEOR, University of California, Berkeley, CA, 1968. [ Links ]

    20. MEAGHER, C., ABDEL SABOUR, S.A., and DIMITRAKOPOULOS, R. Pushback design of open pit mines under geological and market uncertainties. Australian Institute of Mining and Metallurgy, Perth, Western Australia, 2009. pp. 297-304. [ Links ]

    21. ASAD, M.W.A. and DIMITRAKOPOULOS, R. Implementing a parametric maximum flow algorithm for optimal open pit mine design under uncertain supply and demand. Journal of Operational Research Society, 2012 0, pp. 1-13. doi:10.1057/jors.2012.26. [ Links ]

    22. DIMITRAKOPOULOS, R. Stochastic optimization for strategic mine planning: A decade of developments. Journal of Mining Science, vol. 47, no. 2, 2011. pp. 138-150. [ Links ]

    23. HUSTRULID, W. and KUCHTA, M. Open Pit Mine Planning and Design. 2nd edn. Taylor and Francis/Balkema, The Netherlands, 2006. [ Links ]

    24. WHITTLE, J. A decade of open pit mine planning and optimisation - the craft of turning algorithms into packages. Proceedings of the 28th International Symposium on Application of Computers and Operations Research in the Mineral Industry, 1999. pp. 15-24. [ Links ]

    25. FRANCOIS-BONGARCON, D. and GUIBAL, D. Parameterization of optimal designs of an open pit - beginning of a new phase of research. Transactions of the Society of Mining Engineers of AIME, vol. 274, 1984. pp. 1801-1805. [ Links ]

    26. WANG, Q. and SEVIM, H. An alternative to parameterization in finding a series of maximum-metal pits for production planning. Proceedings of the 24th International Symposium on Application of Computers and Operations Research in the Mineral Industry, 1993. pp. 168-175. [ Links ]

    27. GOLDBERG, A.V. and TARJAN, R.E. A new approach to the maximum flow problem. Journal of the Associationfor Computing Machinery, vol. 35, no. 4, 1988. pp. 921-940. [ Links ]

    28. HOCHBAUM, D.S. A new-old algorithm for minimum-cut and maximum-flow in closure graphs. Networks, vol. 37, no. 4, 2001. pp. 171-193. [ Links ]

    29. PICARD, J.C. Maximal closure of a graph and applications to combinatorial problems. Management Science, vol. 22, no. 11, 1976. pp. 1268-1272. [ Links ]

    30. BABENKO, M.A. and GOLDBERG, A.V. Experimental evaluation of a parametric flow algorithm. Microsoft Research Technical Report no. MSR-TR-2006-77, 2006. [ Links ]

    31. GEMCOM. Mining Software Solutions. http://www.gemcomsoftware.com/. [ Links ]

    32. LEITE, A. and DIMITRAKOPOULOS, R. A stochastic optimization model for open pit mine planning: Application and risk analysis at a copper deposit. Transactions of the Institution of Mining and Metallurgy, Mining Technology, vol. 116, no. 3, 2007. pp. 109-118. [ Links ]

    33. ALBOR, F. and DIMITRAKOPOULOS, R. An algorithmic approach to pushback design based on stochastic programming: Method, application and comparisons. Transactions of the Institution of Mining and Metallurgy, Mining Technology, vol. 119, no. 2, 2010. pp. 68-83. [ Links ]

    34. RAMAZAN, S. and DIMITRAKOPOULOS, R. Production scheduling with uncertain supply: A new solution to the open pit mining problem. Optimization and Engineering, 2012. doi:10.1007/s11081-012-9186-2. [ Links ]