SciELO - Scientific Electronic Library Online

SciELO - Scientific Electronic Library Online

Article References

NEHRING, M; TOPAL, E; KIZIL, M.  and  KNIGHTS, P. Integrated short- and medium-term underground mine production scheduling. J. S. Afr. Inst. Min. Metall. [online]. 2012, vol.112, n.5, pp. 365-378. ISSN 0038-223X.

    ALFORD, C. 1995. Optimization in underground mine design. Conference Proceedings of the 25th International APCOM Symposium. Australasian Institute of Mining and Metallurgy, Melbourne. pp. 213-218. [ Links ]

    ALFORD, C., Brazil, M., et al. (2007). Optimization in underground mining. Handbook of Operations Research in Natural Resources. New York, Springer. pp. 561-577. [ Links ]

    ATAEE-POUR, M. 2005. A critical survey of existing stope layout optimization techniques. Journal of Mining Science, vol. 41, no. 5. pp. 447-466. [ Links ]

    BEAULIEU, M. and GAMACHE, M. 2004. An enumeration algorithm for solving the fleet management problem in underground mines. Computers & Operations Research. pp. 1606-1624. [ Links ]

    BRAZIL, M. and P. GROSSMAN, A. 2008. Access layout optimization for underground mines, Australian Mining Technology Conference, Twin Waters. The Australasian Institute of Mining and Metallurgy, Melborne. [ Links ]

    BRAZIL, M. and THOMAS, D.A. 2004. Network optimization for the design of underground mines. Networks, vol. 49, no. 1. pp. 40-50. [ Links ]

    HILLIER, F.S. and LIEBERMAN, G.J. 2001. Introduction to Operations Research. Boston, Mass, McGraw Hill. [ Links ]

    KNIGHTS, P.F. and LI, S. 2006. Short-term sequence optimization - problem definition and initial solution. Proceeding of the Australian Mining Technology Conference (CRC Mining). The Australasian Institute of Mining and Metallurgy, Melbourne. pp. 385-394. [ Links ]

    LITTLE, J., NEHRING, M., and Topal, E., 2008. A new mixed-integer programming model for mine production scheduling optimization in sublevel stope mining. Proceedings of the Australian Mining Technology Conference (CRC Mining), Melbourne. The Australasian Institute of Mining and Metallurgy. pp. 157-172. [ Links ]

    NEHRING, M. and TOPAL, E. 2007. Production schedule optimization in underground hard rock mining using mixed integer programming. Proceedings - Project Evaluation. The Australasian Institute of Mining and Metallurgy, Melbourne. pp. 169-175. [ Links ]

    OSANLOO, M. and SAIDY, S.H. 1999. The possibility of using semi-dispatching systems in Sarcheshmeh copper mine of Iran. Computer Applications in the Minerals Industries, (Colorado School of Mines, Golden) pp. 243-252. [ Links ]

    SENS, J. 2005. Stope boundary optimization. B.Eng. thesis. The University of Queensland, Brisbane. [ Links ]

    TOPAL, E. 2003. Advanced underground mine scheduling using mixed integer programming. PhD thesis, Colorado School of Mines, Colorado. [ Links ]

    TOPAL, E. 2008. Early start and late start algorithms to improve the solution time for long term underground mine scheduling. Journal of the Southern African Institute of Mining and Metallurgy, vol. 108, no. 2. pp. 99-107. [ Links ]

    TROUT, L P. 1995, Underground mine production scheduling using mixed integer programming. Proceedings of the 25th International APCOM Symposium, Melbourne. The Australasian Institute of Mining and Metallurgy. pp. 395-400. [ Links ]

    TSOMONDO, C.M. 1999. A flexible underground mining system with active dispatching model - a solution for the next millennium. Computer Applications in the Minerals Industries, Golden, Colorado School of Mines. pp. 463-473. [ Links ]

    WHITE, J.W., OLSON, J.P., and VOHNOUT, S.I. 1993. On improving truck/shovel productivity in open pit mines, CIM Bulletin, September, 1993. pp. 43-49. [ Links ]