<?xml version="1.0" encoding="ISO-8859-1"?><article xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance">
<front>
<journal-meta>
<journal-id>0038-223X</journal-id>
<journal-title><![CDATA[Journal of the Southern African Institute of Mining and Metallurgy]]></journal-title>
<abbrev-journal-title><![CDATA[J. S. Afr. Inst. Min. Metall.]]></abbrev-journal-title>
<issn>0038-223X</issn>
<publisher>
<publisher-name><![CDATA[The Southern African Institute of Mining and Metallurgy]]></publisher-name>
</publisher>
</journal-meta>
<article-meta>
<article-id>S0038-223X2012000800011</article-id>
<title-group>
<article-title xml:lang="en"><![CDATA[Linear elastic numerical modelling for failure prediction-an assesment]]></article-title>
</title-group>
<contrib-group>
<contrib contrib-type="author">
<name>
<surname><![CDATA[Murphy]]></surname>
<given-names><![CDATA[S.K.]]></given-names>
</name>
<xref ref-type="aff" rid="A01"/>
</contrib>
</contrib-group>
<aff id="A01">
<institution><![CDATA[,AngloGold Ashanti Africa Region  ]]></institution>
<addr-line><![CDATA[ ]]></addr-line>
</aff>
<pub-date pub-type="pub">
<day>00</day>
<month>00</month>
<year>2012</year>
</pub-date>
<pub-date pub-type="epub">
<day>00</day>
<month>00</month>
<year>2012</year>
</pub-date>
<volume>112</volume>
<numero>8</numero>
<fpage>737</fpage>
<lpage>748</lpage>
<copyright-statement/>
<copyright-year/>
<self-uri xlink:href="http://www.scielo.org.za/scielo.php?script=sci_arttext&amp;pid=S0038-223X2012000800011&amp;lng=en&amp;nrm=iso&amp;tlng=en"></self-uri><self-uri xlink:href="http://www.scielo.org.za/scielo.php?script=sci_abstract&amp;pid=S0038-223X2012000800011&amp;lng=en&amp;nrm=iso&amp;tlng=en"></self-uri><self-uri xlink:href="http://www.scielo.org.za/scielo.php?script=sci_pdf&amp;pid=S0038-223X2012000800011&amp;lng=en&amp;nrm=iso&amp;tlng=en"></self-uri><abstract abstract-type="short" xml:lang="en"><p><![CDATA[A partial shaft pillar extraction project was embarked on at a mine in the West Wits mining region in South Africa. Prior to the extraction, a rock engineering assessment was conducted with the main objective being to establish which areas of the shaft pillar could be extracted without unduly affecting the stability of major infrastructure within the shaft pillar. Standard numerical modelling methods were used to conduct this assessment and several areas were identified for extraction. However, during the extraction process, it was found that the infrastructure was affected more than was originally predicted by linear elastic modelling. In addition to this, several large events resulted in far more large aftershocks than would normally be predicted. In order to gain an understanding of this phenomenon, seismic data was integrated with numerical modelling as follows: > The seismic data in the form of displacements was integrated in 3D space within the model to assess the effect of static stress changes associated with seismic activity > Data from large events was integrated onto specific structures, where displacements associated with large events were integrated onto the plane of structure in question. This paper describes the methodology and results obtained from each of the above processes and include insights into the mining process that were previously unfathomable using standard linear elastic numerical modelling. The way forward for this rock engineering assessment of partial shaft pillar extraction is also discussed.]]></p></abstract>
<kwd-group>
<kwd lng="en"><![CDATA[modelling]]></kwd>
<kwd lng="en"><![CDATA[rock engineering]]></kwd>
<kwd lng="en"><![CDATA[failure.]]></kwd>
</kwd-group>
</article-meta>
</front><body><![CDATA[ <p align="right"><font face="Verdana, Arial, Helvetica, sans-serif" size="2"><b>JOURNAL    PAPER</b></font></p>     <p>&nbsp;</p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="4"><b>Linear elastic    numerical modelling for failure prediction—an assesment</b></font></p>     <p>&nbsp;</p>     <p>&nbsp;</p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2"><b>S.K. Murphy</b></font></p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2"> AngloGold Ashanti    Africa Region</font></p>     <p>&nbsp;</p>     <p>&nbsp;</p> <hr size="1" noshade>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2"><b>SYNOPSIS</b></font></p>     ]]></body>
<body><![CDATA[<p><font face="Verdana, Arial, Helvetica, sans-serif" size="2">A partial shaft    pillar extraction project was embarked on at a mine in the West Wits mining    region in South Africa. Prior to the extraction, a rock engineering assessment    was conducted with the main objective being to establish which areas of the    shaft pillar could be extracted without unduly affecting the stability of major    infrastructure within the shaft pillar. Standard numerical modelling methods    were used to conduct this assessment and several areas were identified for extraction.    However, during the extraction process, it was found that the infrastructure    was affected more than was originally predicted by linear elastic modelling.    In addition to this, several large events resulted in far more large aftershocks    than would normally be predicted.    <br>   In order to gain an understanding of this phenomenon, seismic data was integrated    with numerical modelling as follows:    <br>   &gt;<i>&nbsp;</i>The seismic data in the form of displacements was integrated    in 3D space within the model to assess the effect of static stress changes associated    with seismic activity    <br>   &gt;<i>&nbsp;</i>Data from large events was integrated onto specific structures,    where displacements associated with large events were integrated onto the plane    of structure in question.    <br>   This paper describes the methodology and results obtained from each of the above    processes and include insights into the mining process that were previously    unfathomable using standard linear elastic numerical modelling. The way forward    for this rock engineering assessment of partial shaft pillar extraction is also    discussed.</font></p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2"><b>Keywords:</b>    modelling, rock engineering, failure.</font></p> <hr size="1" noshade>     <p>&nbsp;</p>     <p>&nbsp;</p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="3"><b>Introduction</b></font></p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2">TauTona Gold Mine    is the easternmost of the three adjoining mines that formerly constituted the    greater ultra-deep mining complex known as the Western Deep Levels Gold Mine,    which commenced mining some 40 years ago. Currently, the Carbon Leader stopes    are the deepest ore-producing excavations in the world, with a maximum depth    of 3456 m below surface. Using a layout of strike-aligned stabilizing pillars    that yields an extraction of 80 per cent, the very narrow 20 degree dipping    Carbon Leader Reef (CLR) orebody has been mined to a working height of about    1 m over an area exceeding 5 km on strike and 3.5 km in the dip direction.</font></p>     ]]></body>
<body><![CDATA[<p><font face="Verdana, Arial, Helvetica, sans-serif" size="2">Because of the    great depth and extent of mining, and because the surrounding quartzites are    strong and brittle and major faults and dykes are common, large seismic events    are a continuous risk, which sometimes cause severe rockburst damage. With the    use of appropriate layouts based on sound rock engineering principles and careful    sequencing of stoping which is guided by continuous seismic monitoring of the    rock mass response, the frequency of large seismic events has reduced. Largely    as a result of the full-scale introduction of backfill and improved face support,    the rockburst problem in stoping has been reasonably well controlled during    the past few years. This led to re-assessment of other opportunities at TauTona    Mine previously considered unavailable, specifically the shaft pillars.</font></p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2">Two shaft pillars,    one on the Ventersdorp Contact Reef (VCR) and the other on the CLR, protect    the shaft infrastructure at TauTona Mine. The VCR pillar is approximately 950    m </font><font  size="2">&#967;</font><font face="Verdana, Arial, Helvetica, sans-serif" size="2">    950 m at a depth ranging from 1774 m to 2024 m below surface, and the CLR shaft    pillar is a 950 m </font><font  size="2">&#967;</font><font face="Verdana, Arial, Helvetica, sans-serif" size="2">    950 m (902 500 m2) pillar situated between 2624 m and 2874 m below surface.    The initial plan was to extract the VCR pillar from TauTona Mine and the CLR    from Mponeng Mine. However, it was found that the shaft barrels at Mponeng Mine    could not exclusively supply the ventilation requirement for this mining.</font></p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2">In January 2001    a decision was taken that TauTona Mine would become a stand-alone project and    not be incorporated into the Mponeng Project, and that partial extraction of    the pillars would be carried out. Partial extraction of shaft pillars effectively    requires that any mining within the VCR and CLR pillar boundaries be designed    to ensure the integrity of the critical infrastructure within the shaft pillar    areas. For the sake of brevity, this paper is restricted to the partial extraction    of the Carbon Leader shaft pillar.</font></p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2">The partial extraction    of the Carbon Leader shaft pillar was designed using a quasi-static stress assessment    with a linear elastic model. In addition to this, a statistical hazard assessment    of the expected seismic response to this mining was conducted using historical    data from a previously mined high-stressed block of ground. This assessment    did not reveal any major problems associated with the planned mining within    the shaft pillar. However, at the time of this investigation numerical modelling    tools for integration with seismic data were either still being researched or    not available. In effect, the total design of mining in the shaft pillar was    done with limited understanding of the overall seismic response that could be    expected from the planned mining.</font></p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2">The initial approach    to mining within the shaft pillar boundaries was to have a maximum of 6 m face    advance. In addition, the extraction was to be done consecutively, with the    97 area first, the RH1 second, and 101/Thulani area to be the final part of    the extraction (areas shown in <a href="#f1">Figure 1</a>). Progressively during    business planning processes (gold deficits in the mine plan being the main driver)    the mining rate was increased to 9 m, and later further similarly driven decisions    were made to simultaneously extract some of the areas. These decisions were    justified at the time by the quasi-static modelling results, the large expanse    of the shaft pillar, and the initial seismic hazard assessment, although still    with limited understanding of the expected seismic response.</font></p>     <p><a name="f1"></a></p>     <p>&nbsp;</p>     <p align="center"><img src="/img/revistas/jsaimm/v112n8/11f01.jpg"></p>     <p>&nbsp;</p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2">These decisions    have resulted in a significantly higher adverse seismic response than was expected.    Moreover, the geological environment has been found to be far more complex than    was envisaged during the initial assessment of the pillar extraction. In this    environment, both best-practice extraction strategies (in most instances) and    what can be considered as the best support system in the world have not prevented    major damage, resulting in the loss of production and numerous injuries (as    shown in <a href="#f1">Figure 1</a>).</font></p>     ]]></body>
<body><![CDATA[<p><font face="Verdana, Arial, Helvetica, sans-serif" size="2">In addition to    the above, what can be considered as major challenge to the long-term viability    of TauTona Mine is the significant damage that has resulted in the 97 hoist    chambers, which are of strategic importance. As a result of the numerous incidents    of damage and injuries referred to above, a complete re-assessment of the shaft    pillar extraction process was done.</font></p>     <p>&nbsp;</p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="3"><b>Re-assessment</b></font></p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2">The re-assessment    process covered the following aspects:</font></p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2"><i><img src="/img/revistas/jsaimm/v112n8/set.jpg" align="absmiddle">    </i> Analysis of the seismic response with respect to the production input</font></p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2"><i><img src="/img/revistas/jsaimm/v112n8/set.jpg" align="absmiddle"></i>    Numerical modelling with the dynamic response integrated into the model, and    comparison of this with the initial modelling results.</font></p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2">These assessments    and the outcomes obtained from each of the assessments are now discussed.</font></p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2"><b><i>Seismic response    analysis</i></b></font></p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2"><i>Initial assessment</i></font></p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2">An assessment was    conducted where the seismic response per square metre mined (P) was compared    between different mining areas at TauTona mine. For this purpose, the seismic    potency per unit area mined for each of the areas was evaluated. The seismic    potency (Mendecki <i>et al.,</i> 2004) was calculated as follows:</font></p>     ]]></body>
<body><![CDATA[<p align="center"><img src="/img/revistas/jsaimm/v112n8/11x01.jpg"></p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2">Where <i>M</i>    = seismic moment <i>G</i> = rigidity</font></p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2">The results obtained    in this assessment are shown in <a href="#f2">Figure 2</a>, where it can be    seen that both the 97W and 97E areas of the shaft pillar have a significantly    higher response than any of the other areas that were used in the comparison.    What also needs to be noted here is that the RH1 area appears to have a similar    response to two other areas at TauTona Mine, namely the 105 decline east area    and the 105 decline west area. These areas were also associated with an elevated    seismic response. This was due, in the case of the decline west, to the fact    that mining was taking place adjacent to seismically active structures in what    could be considered to be a remnant area. In the case of the decline east, the    longwall was negotiating a seismically active fault and dyke. Of additional    importance to note here is the fact that the RH1 area has a relative small span,    and as this span increases the seismic response will increase.</font></p>     <p><a name="f2"></a></p>     <p>&nbsp;</p>     <p align="center"><img src="/img/revistas/jsaimm/v112n8/11f02.jpg"></p>     <p>&nbsp;</p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2"><i>Cumulative potency    vs. cumulative production</i></font></p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2">The second part    of the seismic assessment consisted of a novel approach, in which potency was    compared directly to production. The main objectives of this task were:</font></p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2"><i><img src="/img/revistas/jsaimm/v112n8/set.jpg" align="absmiddle"></i>    To quantify the seismic potency results obtained above</font></p>     ]]></body>
<body><![CDATA[<p><font face="Verdana, Arial, Helvetica, sans-serif" size="2"><i><img src="/img/revistas/jsaimm/v112n8/set.jpg" align="absmiddle"></i>    To develop a tool that could be used for medium-term prediction.</font></p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2"><a href="#f3">Figure    3</a> shows the results obtained for all the mining areas at TauTona Mine, and    from this information some deductions can be made. To begin with, two different    response slopes can be discerned, namely a longwall average response slope and    a high seismic response slope. This can be confirmed by quick perusal of the    areas where a high seismic response was experienced, these areas being 90E longwall    (mined between two seismically active structures), 102E and 104E (section 336    high-stress - remnant area), and the 97E and 97W in the shaft pillar. Secondly,    when considering a slope increase in an average longwall curve in combination    with the position of that longwall at that point in time, it can be deduced    in most cases that this increase was associated with the negotiation of seismically    active geological structures. Thirdly, from <a href="#f4">Figure 4</a>, the    following can be deduced:</font></p>     <p><a name="f3"></a></p>     <p>&nbsp;</p>     <p align="center"><img src="/img/revistas/jsaimm/v112n8/11f03.jpg"></p>     <p>&nbsp;</p>     <p><a name="f4"></a></p>     <p>&nbsp;</p>     <p align="center"><img src="/img/revistas/jsaimm/v112n8/11f04.jpg"></p>     <p>&nbsp;</p>     ]]></body>
<body><![CDATA[<p><font face="Verdana, Arial, Helvetica, sans-serif" size="2"><i><img src="/img/revistas/jsaimm/v112n8/set.jpg" align="absmiddle"></i>    Stopping of mining does not imply that the seismic activity stops immediately</font></p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2"><i><img src="/img/revistas/jsaimm/v112n8/set.jpg" align="absmiddle"></i>    On the 97 shaft pillar curve it appears that the slope reduction has been induced    by a significantly lower mining rate</font></p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2"><i><img src="/img/revistas/jsaimm/v112n8/set.jpg" align="absmiddle"></i>    The seismic hazard for the 97 area is similar to the 102E (336) longwall and    higher than the 104E (336) longwall.</font></p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2"><i>Mining rate    assessment</i></font></p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2">This part of the    seismic assessment was done in an attempt to determine the effect of mining    rate on seismic activity that occurs as a result of mining operations. The initial    part of this assessment was to compare cumulative production to cumulative seismic    displacement, and this is shown in <a href="#f5">Figure 5</a>.</font></p>     <p><a name="f5"></a></p>     <p>&nbsp;</p>     <p align="center"><img src="/img/revistas/jsaimm/v112n8/11f05.jpg"></p>     <p>&nbsp;</p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2">Here it can be    seen that where the production curve is steeper (higher mining rate) the seismic    response is significantly higher in terms of the number and magnitude of events    that occurred. When considering this with the data shown in <a href="#f6">Figure    6</a>, it appears that when the production rate in the shaft pillar exceeds    3500-4000 m<sup>2</sup> per quarter, the seismic response in the shaft pillar    does not just increase, but there appears to be a lock-up with respect to the    seismic response. Similarly, in an industry review of shaft pillars it was found    that mining rate within shaft pillar boundaries should be limited to 2000 m2/month    (Dukes, 2007). It has also been shown that the short-term hazard, associated    with spatially disordered and non-adjacent blasting of mining panels, was lower    than where panels were blasted adjacent to each other, irrespective of the rate    of mining. Non-adjacent blasting at a lower mining rate generated even more    favourable conditions (Mendecki, 2005).</font></p>     ]]></body>
<body><![CDATA[<p><a name="f6"></a></p>     <p>&nbsp;</p>     <p align="center"><img src="/img/revistas/jsaimm/v112n8/11f06.jpg"></p>     <p>&nbsp;</p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2">This seismic analysis    has shown that the seismic response of specifically the 97 area in the shaft    pillar is notably higher than in any of the normal longwalls at TauTona Mine.    Also, the seismic response of the 97 area is similar to, if not higher than,    the old 336 area. It can also be concluded that a high production rate (volume    of extraction with respect to time), specifically in shaft pillars, has either    an exponential effect on the seismic response within the shaft pillar boundaries    or seismic lockup may occur. Futhermore, non-adjacent blasting of panels will    have a more favourable effect on the seismic response.</font></p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2"><i>Numerical modelling    and seismic integration in the numerical model</i></font></p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2">Standard linear    elastic numerical modelling was originally used to assess mining in the shaft    pillar. Some results obtained with this modelling will be discussed and compared    to the seismic data discussed above. Leading on from this assessment and from    several incidents in the shaft pillar that were identified as anomalous compared    to the rest of the mine, numerical modelling with seismic integration on the    geological structures was completed. The results obtained from this are also    discussed. Finally, as part of an infrastructure assessment, 3D seismic integration    in the model was conducted, and these results are also discussed.</font></p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2"><i>Linear elastic    modelling</i></font></p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2">In this exercise    linear elastic modelling (Map3D) was used to assess different areas at TauTona    Mine, and results obtained were compared to modelling results obtained in the    shaft pillar. The variable obtained from the model and used in this assessment    was energy release rate or ERR (Map3d manual), and the results are shown in    <a href="#f7">Figure 7</a> (September 2004 to September 2005) and <a href="#f8">Figure    8</a> (September 2005 to September 2006). In both these figures it can be seen    that the ERRs for the 97 shaft pillar areas are similar to, and not significantly    higher than, any of the other areas at TauTona Mine.</font></p>     <p><a name="f7"></a></p>     ]]></body>
<body><![CDATA[<p>&nbsp;</p>     <p align="center"><img src="/img/revistas/jsaimm/v112n8/11f07.jpg"></p>     <p>&nbsp;</p>     <p><a name="f8"></a></p>     <p>&nbsp;</p>     <p align="center"><img src="/img/revistas/jsaimm/v112n8/11f08.jpg"></p>     <p>&nbsp;</p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2">However when the    seismic response of the areas is compared it can be seen that the response of    the 97 shaft pillar areas is markedly higher than that of the other areas, as    shown in <a href="#f9">Figure 9</a>. In an attempt to understand the difference    in the seismic response, the numerical assessment was expanded to include seismic    integration. This was accomplished using Map3Di, which has the ability to integrate    seismic data.</font></p>     <p><a name="f9"></a></p>     <p>&nbsp;</p>     ]]></body>
<body><![CDATA[<p align="center"><img src="/img/revistas/jsaimm/v112n8/11f09.jpg"></p>     <p>&nbsp;</p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2"><i>Integration    of seismicity on geological structures</i></font></p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2">Map3Di is an advance    on the standard MAP3D program that permits superposition of external field loading    effects onto a standard Map3D model. Slip or dilation on a fault plane is applied    by subdividing the known extent of the fault into small planar zones and then    specifying the slip or dilation components in each zone. Effectively, the deformations    indicated by seismicity are superimposed onto the Map3D mine model, thereby    redistributing the stresses to accommodate the deformations (Mendecki <i>et    al.,</i> 2001).</font></p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2">Using this methodology,    two incidences of major seismic events were back-analysed. Firstly, the occurrence    of an event in the 97W area was analysed. This event of local magnitude (mL)    2.5 resulted in major failure and loss of life in 97W3 panel. Underground investigations    revealed that major reverse slip had occurred on a ramp fault structure in the    face area of the panel. Following the event, a shear fracture with approximately    12 cm of displacement was observed in a panel mining north (up-dip), ahead of    the breast panel. The shear structure was striking parallel to the previous    breast face (see <a href="#f10">Figure 10</a>). What was not well understood    was the reverse slip along the ramp fault structure and the magnitude of the    event that occurred. In order to gain understanding of this a numerical model    of the shaft pillar was built, and both the shear structure and the ramp fault    structure were included in this model as displacement discontinuities (see <a href="#f11">Figures    11</a> and <a href="#f12">12</a>). The model was then run with three mining    steps up to the time of the event.</font></p>     <p><a name="f10"></a></p>     <p>&nbsp;</p>     <p align="center"><img src="/img/revistas/jsaimm/v112n8/11f10.jpg"></p>     <p>&nbsp;</p>     <p><a name="f11"></a></p>     ]]></body>
<body><![CDATA[<p>&nbsp;</p>     <p align="center"><img src="/img/revistas/jsaimm/v112n8/11f11.jpg"></p>     <p>&nbsp;</p>     <p><a name="f12"></a></p>     <p>&nbsp;</p>     <p align="center"><img src="/img/revistas/jsaimm/v112n8/11f12.jpg"></p>     <p>&nbsp;</p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2">At this point,    the mL 2.5 seismic event was integrated into the model along the shear structure    at approximately the position that it occurred. The results from this model    showed that normal slip occurred along the shear structure. This resulted in    an upward sense of movement of the hangingwall above the ramp structure, which    in turn induced reverse slip along this structure. This effectively dislodged    the footwall of the structure into the stope. An assessment of the ESS along    the structure also revealed that a mL 2.5 event could occur along this structure    with a strike length of 45 m. Furthermore, a second event associated with a    ramp structure occurred in the position as shown in <a href="#f10">Figure 10</a>.    This event was of m<sub>L</sub> 1.8 with a corresponding face length of 12 m    to 15 m. What is of interest to note here is that this data conforms to a previous    postulation that was made concerning the panel face length having a direct bearing    on the magnitude of the event that may occur (van Aswegen, 2006).</font></p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2">The second incident    consisted of a multitude of events which included a mL 4 seismic event that    was initiated on the 97W side of the shaft pillar. The sequence of these events    that occurred is shown in <a href="#f13">Figure 13</a>. The 97E panels intersected    an unknown 1.5 m fault that was striking almost parallel to the faces. This    resulted in the mining strategy being changed from breast mining to northside    mining being used to negotiate the fault. During this northside mining the first    seismic event (m<sub>L</sub> 3) occurred, with the second (m<sub>L</sub> 2.6)    occurring approximately a minute later and the third event (mL 4) a day later.    What was not fully understood here was firstly why the first event occurred    even though the strategy had been changed, and secondly why the third event    still occurred when intuitively it was thought that the first and second events    should have de-stressed the fault.</font></p>     <p><a name="f13"></a></p>     ]]></body>
<body><![CDATA[<p>&nbsp;</p>     <p align="center"><img src="/img/revistas/jsaimm/v112n8/11f13.jpg"></p>     <p>&nbsp;</p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2">The same methodology    as described in the first paragraph of this section was used to back-analyse    this situation. The fault was built with displacement discontinuity as shown    in <a href="#f14">Figure 14</a>. The modelled mining consisted of the 97E panels    being mined breast-onto the fault. The mining was then turned north with a northside    panel. It was found that as the breast mining approached the fault, positive    ESS lobes were formed close to the reef horizon. Using Ryder's method (Ryder,    1988) of calculating expected event magnitudes from ESS, it was found that that    there was sufficient potential for both these events to occur. This assessment    also showed that the minimal mining being done in the northside panel was sufficient    to cause an increase in the existing ESS lobe.</font></p>     <p><a name="f14"></a></p>     <p>&nbsp;</p>     <p align="center"><img src="/img/revistas/jsaimm/v112n8/11f14.jpg"></p>     <p>&nbsp;</p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2">In addition, a    further ESS lobe was found to exist on the geological structure fairly high    in the hangingwall of the stope, and this lobe definitely had potential to result    in the mL 4 event that occurred. In the model it can be seen that this positive    ESS lobe owes its existence to the initial mining that took place when the pillar    was formed, rather than mining activity at the time of the event. In the physical    rockmass, positive ESS lobes do not exist because movement associated with this    ESS will take place either slowly (creep) or quickly to relieve the ESS build-up.    However, it is also known that asperities may exist on the geological features,    which could hang up this movement along the feature. In this instance, small    increases in either the ESS or the lobe size can be sufficient to 'break' the    asperity, resulting in a large event occurring. Increases as described above    were observed in the positive ESS lobes already existing on the geological feature    in the model as a result of the northside mining. This process is probably why    the first seismic event occurred when it did. It does not, however, explain    the occurrence of the second and third events. Further work was required to    explain this, and as such the three seismic events that occurred were integrated    into the model in a step-wise fashion. In this implementation it was found that    the first event created positive increases in both the ESS and the lobes at    the positions where the second and third events occurred. From this it can be    concluded that the static stress changes associated with first event was sufficient    to trigger the second and third events.</font></p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2">These results prompted    further work to ascertain the extent to which the mL 4 event influenced the    occurrence of the remaining seismic events in the so-called swarm. To this end,    the solid remaining in the reef plane was built into the model using displacement    discontinuities. This model was then run and the seismic data concerning the    mL 4 event was integrated into this model along the geological feature. The    results showed that significant static changes in <i>a<sub>n</sub> (a<sub>n</sub></i>    is defined as the stress existing in the direction normal to the reef plane)    occurred in the areas where the other seismic events occurred (see <a href="#f15">Figure    15</a>). Changes to <i>a<sub>n</sub></i> imply changes to the principal field    stresses, which in turn implies changes to the ESS acting on the structures.    ESS is equivalent to Coulomb failure stress (CFS), which is widely used in crustal    seismology (Hofmann <i>et al.,),</i> where it has been found that a static Coulomb    stress change in excess of 1 bar (0.1 MPa) caused by a large seismic event is    sufficient to trigger aftershocks (Harris, 1998). When taking the above into    consideration it can be interpreted that the static stress changes associated    with the mL 4 event are a major contributing factor to the occurrence of the    remaining events in the 'swarm'. Effectively, what can be considered to be minor    stress changes has resulted in major seismic activity. What can also be concluded    from the above work, specifically with respect to the fault in the 97E area,    is that the historical latent seismic potential of structures in the shaft pillar    was significantly under-estimated during the initial design phase.</font></p>     ]]></body>
<body><![CDATA[<p><a name="f15"></a></p>     <p>&nbsp;</p>     <p align="center"><img src="/img/revistas/jsaimm/v112n8/11f15.jpg"></p>     <p>&nbsp;</p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2">What now needs    to be considered is whether the increase in static stress as a result of seismic    activity is a major contributing factor to the higher-than-expected deformation    experienced in the 97 hoist chambers. In order to do this, the seismic data    obtained from the shaft pillar during the period that the pillar was being mined    was integrated into the numerical model. This methodology is described in the    following section.</font></p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2"><i>Integration    of the seismic information in 3D space in the numerical model</i></font></p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2">The higher-than-expected    deformation in the 97 hoist infrastructure area could be attributed to one or    both of the following:</font></p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2"><i><img src="/img/revistas/jsaimm/v112n8/set.jpg" align="absmiddle"></i>    Effects of mining is larger than expected</font></p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2"><i><img src="/img/revistas/jsaimm/v112n8/set.jpg" align="absmiddle"></i>    The design criterion of 5 MPa was overstated.</font></p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2">Consideration of    the first point revealed that either the initial modelling was inaccurate or,    due to seismic deformation, higher stress concentrations are occurring in the    intact areas. Extensive re-modelling with a different linear elastic model (Map3D)    has not revealed any inaccuracies or anomalies concerning the initial modelling,    which was done with MinsimW. At the time that the initial modelling was done,    the methodology for integrating seismic data with numerical modelling was in    its infancy and not freely available. Some integration work was done at the    time by ISSI (Integrated Seismic Systems International), where historical seismic    data that occurred along the geological structures was incorporated. This exercise    revealed that the stability of the major structures was dependent on the existing    k-ratio (k-ratio is the ratio between the vertical and the horizontal stress).    In addition, a ranking of the hazard potential of the geological structures    was conducted. No work was done with respect to the possibility of significant    static stress increase occurring as a result of seismic activity, and this possibility    was not taken into account at the time. It is now suspected that seismic-induced    static stress increase may be a cause for the higher-than-expected level of    deformation in the 97 hoist chambers, and as such the 3D seismic integration    described below was carried out.</font></p>     ]]></body>
<body><![CDATA[<p><font face="Verdana, Arial, Helvetica, sans-serif" size="2">The 5 MPa stress    criterion was a relatively subjective design value based on some industry experience.    It is not known with any certainty if it is tolerable in this situation where    the hoist chambers with sensitive machinery already lie in a stress field exceeding    97 MPa. As a preliminary attempt to quantify this, an inelastic 2D assessment    was also done, and this is discussed in the following section.</font></p>     <p>&nbsp;</p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="3"><b>Methodology</b></font></p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2">The method followed    in conducting the 3D integration is firstly described, and then the results    obtained from this integration are discussed.</font></p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2">The rock mass in    the shaft pillar area was divided into into small 3D zones—voxels (cubic boxes)—of    particular dimension. Seismic deformation of the rock mass is specified in terms    of strain per voxel. The apparent volume of an event, together with a source    model assumption, gives the physical deformation at a voxel centre point. This    is cumulated for all events touching that voxel, and is transformed into a strain    estimate by dividing by the voxel side length. This is calculated for the relevant    seismicity, for all voxels in the integration volume, and then serves as input    for Map3Di. The model then updates the overall stress state to accommodate the    contribution of the integrated field loading (Hofmann, 2003).</font></p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2">The numerical model    that was used consisted of the shaft pillar with no mining being conducted within    the shaft pillar boundaries as a base case. In the second step, all the mining    that had to date been completed was incorporated. In the third step. the seismic    data for events affecting the shaft pillar during this mining operation were    integrated into the model. The results from step 1 were then subtracted from    step 2 to obtain the static stress change induced by the mining. Similarly,    this was done for steps 2 and 3 to obtain the dynamic stress change associated    with the dynamic loading.</font></p>     <p>&nbsp;</p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="3"><b>Results</b></font></p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2">The results obtained    for this modelling are illustrated in <a href="#f16">Figures 16</a> and <a href="#f17">17</a>    and quantified in the graph in <a href="#f18">Figure 18</a>. In <a href="#f16">Figure    16</a> it can be seen that the criteria of 5 MPa are not exceeded in the 97    hoist excavations, but they are exceeded to some extent in the 100 refrigeration    plant area. This is due to the additional mining that was done in the 97 reef    drive that was not included in the initial modelling exercise. Conversely, in    <a href="#f17">Figure 17</a> it can be seen that as a result of the dynamic    loading, the 5 MPa criterion has been exceeded in both areas. <a href="#f18">Figure    18</a> shows results that were obtained from benchmark points included in the    model adjacent to some of the chambers in the 97 hoist area. Here it can also    be seen that when the dynamic loading is included the 5 MPa criterion is exceeded    at certain points. From this it can be concluded that, firstly, the dynamic    loading within the shaft pillar area is one of the drivers of the higher-than-expected    rate of deformation experienced in the 97 hoist chambers. Secondly, although    the 100 refrigeration plant has been subjected to a similar stress increase    there does not appear any evidence of higher-than-expected deformation.</font></p>     <p><a name="f16"></a></p>     ]]></body>
<body><![CDATA[<p>&nbsp;</p>     <p align="center"><img src="/img/revistas/jsaimm/v112n8/11f16.jpg"></p>     <p>&nbsp;</p>     <p><a name="f17"></a></p>     <p>&nbsp;</p>     <p align="center"><img src="/img/revistas/jsaimm/v112n8/11f17.jpg"></p>     <p>&nbsp;</p>     <p><a name="f18"></a></p>     <p>&nbsp;</p>     <p align="center"><img src="/img/revistas/jsaimm/v112n8/11f18.jpg"></p>     ]]></body>
<body><![CDATA[<p>&nbsp;</p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2">In order to quantify    the displacement that occurred in the sidewalls and the hangingwall of the 97    rock winders, FLAC2D inelastic modelling was done, and this is discussed in    the following section.</font></p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2"><b><i>2-Dimensional    inelastic modelling of the 97 rock hoist chamber</i></b></font></p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2"><i>Model description</i></font></p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2">A 2D section of    the rock hoist chamber was built using Flac2D, and this section is shown in    <a href="#f19">Figure 19</a>. <a href="#f20">Figure 20</a> shows the shotcrete    and anchors that have been included in this model to simulate the effect of    the support that is currently installed in the chamber. Stress inputs for the    model were obtained from the Map3D modelling described above. The model was    run in the following stages:</font></p>     <p><a name="f19"></a></p>     <p>&nbsp;</p>     <p align="center"><img src="/img/revistas/jsaimm/v112n8/11f19.jpg"></p>     <p>&nbsp;</p>     <p><a name="f20"></a></p>     ]]></body>
<body><![CDATA[<p>&nbsp;</p>     <p align="center"><img src="/img/revistas/jsaimm/v112n8/11f20.jpg"></p>     <p>&nbsp;</p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2"><i><img src="/img/revistas/jsaimm/v112n8/set.jpg" align="absmiddle"></i>    Stage 1: At time of excavation</font></p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2"><i><img src="/img/revistas/jsaimm/v112n8/set.jpg" align="absmiddle"></i>    Stage 2: Shaft pillar formed</font></p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2"><i><img src="/img/revistas/jsaimm/v112n8/set.jpg" align="absmiddle"></i>    Stage 3: Static stress increase due to mining within the pillar</font></p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2"><i><img src="/img/revistas/jsaimm/v112n8/set.jpg" align="absmiddle"></i>    Stage 4: Static stress increase due to dynamic loading</font></p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2"><i><img src="/img/revistas/jsaimm/v112n8/set.jpg" align="absmiddle"></i>    Stage 5: Static stress due to planned mining</font></p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2"><i><img src="/img/revistas/jsaimm/v112n8/set.jpg" align="absmiddle"></i>    Stage 6: Dynamic stress increase due to expected dynamic loading.</font></p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2"><i>Results obtained    from the model</i></font></p>     ]]></body>
<body><![CDATA[<p><font face="Verdana, Arial, Helvetica, sans-serif" size="2">History points    to monitor the deformation occurring in the model are shown in <a href="#f21">Figure    21</a>. For the sake of brevity, only the results obtained at position 8 are    discussed in this report. This point was chosen because it is in the centre    of one of the chamber sidewalls where the most lateral displacement would occur.    The results for this point are shown in <a href="#f22">Figure 22</a>. The static    increase that occurred as a result of the mining in the pillar is approximately    20 mm. Here it must be taken into account that the opposite sidewall has similar    deformation, and therefore the total deformation acting on the concrete foundations    and the floor of the hoist rooms was 50 mm due to the static stress increase    associated with the mining. However, when considering the total static stress    (mining-related and dynamic loading) it can be seen that this is approximately    120 mm. This is the current point in time at which the high rate of deformation    is being experienced in the rock hoist chamber. What is of major concern here    is the fact that the expected deformation that will occur as a result of the    static stress increase attributable to both the mining and the predicted dynamic    loading is at least 200 mm, in addition to the 100 mm discussed above. When    considering the above and the higher-than-expected deformation that has occurred,    it must be concluded that the planned additional mining will definitely result    in at least double the deformation that has already occurred, and this may result    in catastrophic failure of the foundations of the hoist in this chamber.</font></p>     <p><a name="f21"></a></p>     <p>&nbsp;</p>     <p align="center"><img src="/img/revistas/jsaimm/v112n8/11f21.jpg"></p>     <p>&nbsp;</p>     <p><a name="f22"></a></p>     <p>&nbsp;</p>     <p align="center"><img src="/img/revistas/jsaimm/v112n8/11f22.jpg"></p>     <p>&nbsp;</p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2">To this effect,    numerical modelling was conducted to ascertain which planned areas within the    shaft pillar could still be mined without adversely affecting the 97 hoist chambers    and the 100 refrigeration plant. This work is discussed in the following sections.</font></p>     ]]></body>
<body><![CDATA[<p><font face="Verdana, Arial, Helvetica, sans-serif" size="2"><i>Evaluation of    possible further extraction within the shaft pillar</i></font></p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2">The first part    of this work was done with the Map3D/3Di programs, where the effects of the    different mining areas on the 97 rock hoist chamber were compared. The results    for this exercise are shown in <a href="#f23">Figure 23</a>. Here it can be    seen that only the 97 West and the Thulani areas have a minimal effect on the    97 rock winder area. This, however, removes a significant amount of the planned    mining from the shaft pillar. Considering this, further work was done to determine    what portion of the bottom west of the RH1 could be mined in addition to the    Thulani and the 97 West mining. This area was assessed rather than the other    areas since the 97 east area has a high seismic potential and the RH1 top east    and west are in close proximity to the seismically active Wuddles Dyke. By reducing    the amount of mining in the bottom west of the RH1 area, a reduction in the    potential stress increase in the 97 hoist area is accomplished. Secondly, this    reduction of mining reduces the effect on the Wuddles Dyke. The total stress    increase in the 97 hoist area is predicted to be 0.5 MPa for the static increase    and 0.5 MPa for the dynamic increase (see <a href="#f24">Figure 24</a>). These    results were then input into the Flac2D model, and the results obtained are    shown in <a href="#f25">Figure 25</a>. Effectively, this reduction in the field    stress increase in the vicinity of the rock hoist chamber results in a significantly    lower increase in the expected deformation— from 160 mm across the excavation    to 40 mm, which can be catered for by the engineering design and application    of phasing measures to maintain and protect hoisting against slow deformations.</font></p>     <p><a name="f23"></a></p>     <p>&nbsp;</p>     <p align="center"><img src="/img/revistas/jsaimm/v112n8/11f23.jpg"></p>     <p>&nbsp;</p>     <p><a name="f24"></a></p>     <p>&nbsp;</p>     <p align="center"><img src="/img/revistas/jsaimm/v112n8/11f24.jpg"></p>     <p>&nbsp;</p>     ]]></body>
<body><![CDATA[<p><a name="f25"></a></p>     <p>&nbsp;</p>     <p align="center"><img src="/img/revistas/jsaimm/v112n8/11f25.jpg"></p>     <p>&nbsp;</p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2">A similar modelling    exercise was done for the 100 refrigeration plant. The expected vertical stress    increase is approximately 7 MPa as a result of this mining. This will result    in additional deformation of 30 mm to 50 mm in the sidewall of the excavations,    or a maximum of 100 mm across the refrigeration plant excavations. In this scenario,    as a result of the slots cut in the footwall of the excavation it is not expected    that this deformation will detrimentally affect the refrigeration plant equipment    (van Antwerpen, 2007).</font></p>     <p>&nbsp;</p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="3"><b>Conclusions</b></font></p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2">This seismic analysis    has shown that the seismic response in the shaft pillar is notably higher than    in any of the normal longwalls at TauTona Mine. Also, the seismic behaviour    of the 97 area is similar to, if not higher than, that of the old 336 area.    When taking this into consideration, together with the fact that a similarly    high-stressed area was successfully extracted, it must be borne in mind that    the shaft pillar includes sensitive infrastructure, which was not the case with    the similarly high-stressed area. The initial criterion that was used to establish    the amount of mining that could be done in the shaft pillar area without causing    significant damage to the infrastructure may be optimistic (Leach, 2007). This,    in conjunction with the deformation that occurred in the 97 hoist chambers and    the additional static stress increase associated with the dynamic loading, requires    that any additional mining in the shaft pillar be restrained. Consequently,    the overall planned mining in the Carbon Leader shaft pillar at TauTona Mine    has been completely reassessed and reduced to the areas shown in <a href="#f26">Figure    26</a>.</font></p>     <p><a name="f26"></a></p>     <p>&nbsp;</p>     ]]></body>
<body><![CDATA[<p align="center"><img src="/img/revistas/jsaimm/v112n8/11f26.jpg"></p>     <p>&nbsp;</p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2">Reducing the amount    of mining in the bottom west of the RH1 area firstly accomplishes a reduction    in the potential stress increase in the 97 hoist area. Secondly, the effect    of this mining on the Wuddles Dyke is significantly less than would otherwise    have been the case. The numerical modelling also shows that mining, although    significantly reduced, will still have an effect on both the 97 hoist chambers    and the 100 level refrigeration plant. The numerical modelling has indicated    that a further deformation of 40 mm can be expected across the hoist chambers.    With respect to the 100 level refrigeration plant, the deformation across the    chambers is expected not to be in excess of 100 mm. According to the Engineering    Manager this is not expected to affect the refrigeration plant infrastructure    (van Antwerpen, 2007).</font></p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2">It is also concluded    that a high production rate specifically in shaft pillars has either an exponential    effect on the seismic response within the shaft pillar boundaries or seismic    lockup may occur. Futhermore, non-contiguous blasting, i.e. not blasting of    adjacent panels at the same time, will have a more favourable effect on the    seismic response. From the evidence provided in this paper it is concluded that    the production rate within the shaft pillar boundaries should be maintained    at less than 2200 m<sup>2</sup>/month.</font></p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2">The cumulative    potency vs. cumulative production criterion shows promise as a medium-term monitoring    parameter for seismic analysis when mining is approaching geological features    and to quantify the required production rate within the shaft pillar.</font></p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2">When considering    the evidence related to the panel length, it must be concluded that panel lengths    must be restricted to a maximum length of 25 m in areas with relatively higher    seismic activity, such as the TauTona shaft pillar.</font></p>     <p>&nbsp;</p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="3"><b>Final outcome</b></font></p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2">All mining in the    CLR shaft pillar has now been stopped. The red mining limits shown in <a href="#f27">Figure    27</a> were the previous updated design limits, and the blue lines indicate    the new limits. Most mining had to be stopped short of the design, as can be    seen in <a href="#f27">Figure 27</a>. The seismic response in the west mining    panels continued to escalate and as a result of this all west mining panels    were stopped. In the Thulani area, mining in the bottom portion was stopped    due to both seismic and mining restraints, whereas the upper portion was allowed    to continue over the stopping line due to the low seismic response and minimal    effect on the 100 level refrigeration plant. Further work is required to quantify    the anomalous seismic response, specifically of the west mining panels, to gain    a better understanding of design rules for possible further extraction once    the shaft infrastructure at TauTona Mine is abandoned.</font></p>     <p><a name="f27"></a></p>     ]]></body>
<body><![CDATA[<p>&nbsp;</p>     <p align="center"><img src="/img/revistas/jsaimm/v112n8/11f27.jpg"></p>     <p>&nbsp;</p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="3"><b>References</b></font></p>     <!-- ref --><p><font face="Verdana, Arial, Helvetica, sans-serif" size="2">Harris, R.A. 1998.    Introduction to special section: Stress triggers, stress shadows, and implications    for seismic hazard. <i>Journal of Geophysical Research,</i> vol. 103 (B10),    no. 24. pp. 347-358.</font>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;[&#160;<a href="javascript:void(0);" onclick="javascript: window.open('/scielo.php?script=sci_nlinks&ref=251373&pid=S0038-223X201200080001100001&lng=','','width=640,height=500,resizable=yes,scrollbars=1,menubar=yes,');">Links</a>&#160;]<!-- end-ref --><!-- ref --><p><font face="Verdana, Arial, Helvetica, sans-serif" size="2">Hoffmann, G. and    Murphy, S. Coloumb stress triggering in the underground environment. <i>Proceeding    of the 1st Canada-US Rock Mechanics Symposium,</i> Vancouver, Canada, 27-31    May 2007.</font>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;[&#160;<a href="javascript:void(0);" onclick="javascript: window.open('/scielo.php?script=sci_nlinks&ref=251374&pid=S0038-223X201200080001100002&lng=','','width=640,height=500,resizable=yes,scrollbars=1,menubar=yes,');">Links</a>&#160;]<!-- end-ref --><!-- ref --><p><font face="Verdana, Arial, Helvetica, sans-serif" size="2">Mendecki, A. Persistence    of seismic rock mass response to mining. <i>Proceedings of the 6th International    Symposium on Rockburst and Seismicity in Mines,</i> Perth, Australia, March    2005.</font>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;[&#160;<a href="javascript:void(0);" onclick="javascript: window.open('/scielo.php?script=sci_nlinks&ref=251375&pid=S0038-223X201200080001100003&lng=','','width=640,height=500,resizable=yes,scrollbars=1,menubar=yes,');">Links</a>&#160;]<!-- end-ref --><!-- ref --><p><font face="Verdana, Arial, Helvetica, sans-serif" size="2">Dukes, G. Shaft    pillar extraction survey. AngloGold Ashanti. <i>Unpublished internal report,</i>    June 2007.</font>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;[&#160;<a href="javascript:void(0);" onclick="javascript: window.open('/scielo.php?script=sci_nlinks&ref=251376&pid=S0038-223X201200080001100004&lng=','','width=640,height=500,resizable=yes,scrollbars=1,menubar=yes,');">Links</a>&#160;]<!-- end-ref --><!-- ref --><p><font face="Verdana, Arial, Helvetica, sans-serif" size="2">Mendecki, A. Optimisation    of the routine seismic hazard rating system for ANG mines. AngloGold Ashanti.    <i>Unpublished report,</i> 2004.</font>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;[&#160;<a href="javascript:void(0);" onclick="javascript: window.open('/scielo.php?script=sci_nlinks&ref=251377&pid=S0038-223X201200080001100005&lng=','','width=640,height=500,resizable=yes,scrollbars=1,menubar=yes,');">Links</a>&#160;]<!-- end-ref --><!-- ref --><p><font face="Verdana, Arial, Helvetica, sans-serif" size="2">Ryder, J.A. 1988.    Excess shear stress in the assessment of geologically hazardous situations.    <i>Journal of the South African Institute of Mining and Metallurgy,</i> vol.    88, no. 1. pp. 27-39.</font>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;[&#160;<a href="javascript:void(0);" onclick="javascript: window.open('/scielo.php?script=sci_nlinks&ref=251378&pid=S0038-223X201200080001100006&lng=','','width=640,height=500,resizable=yes,scrollbars=1,menubar=yes,');">Links</a>&#160;]<!-- end-ref --><!-- ref --><p><font face="Verdana, Arial, Helvetica, sans-serif" size="2">Van Antwerpen,    J. 2007. TauTona Gold Mine. <i>Personal communication,</i> June 2007.</font>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;[&#160;<a href="javascript:void(0);" onclick="javascript: window.open('/scielo.php?script=sci_nlinks&ref=251379&pid=S0038-223X201200080001100007&lng=','','width=640,height=500,resizable=yes,scrollbars=1,menubar=yes,');">Links</a>&#160;]<!-- end-ref --><!-- ref --><p><font face="Verdana, Arial, Helvetica, sans-serif" size="2">Leach, T. 2007.    Consultancy report: Summary—Rock engineering discussions concerning mining in    the TauTona shaft pillar. 25 May 2007.</font>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;[&#160;<a href="javascript:void(0);" onclick="javascript: window.open('/scielo.php?script=sci_nlinks&ref=251380&pid=S0038-223X201200080001100008&lng=','','width=640,height=500,resizable=yes,scrollbars=1,menubar=yes,');">Links</a>&#160;]<!-- end-ref --><p>&nbsp;</p>     <p>&nbsp;</p>     <p><font face="Verdana, Arial, Helvetica, sans-serif" size="2">&copy; The Southern    African Institute of Mining and Metallurgy, 2012.ISSN2225-6253. This paper was    first presented at the, Southern Hemisphere International Rock Mechanics Symposium    (SHIRMS) 2012, 15-17 May 2012, Sun City, South Africa.</font></p>      ]]></body>
<REFERENCES></REFERENCES<back>
<ref-list>
<ref id="B1">
<nlm-citation citation-type="journal">
<person-group person-group-type="author">
<name>
<surname><![CDATA[Harris]]></surname>
<given-names><![CDATA[R.A.]]></given-names>
</name>
</person-group>
<article-title xml:lang="en"><![CDATA[Introduction to special section: Stress triggers, stress shadows, and implications for seismic hazard.]]></article-title>
<source><![CDATA[Journal of Geophysical Research]]></source>
<year>1998</year>
<volume>103</volume>
<numero>24</numero>
<issue>24</issue>
<page-range>347-358</page-range></nlm-citation>
</ref>
<ref id="B2">
<nlm-citation citation-type="confpro">
<person-group person-group-type="author">
<name>
<surname><![CDATA[Hoffmann]]></surname>
<given-names><![CDATA[G.]]></given-names>
</name>
<name>
<surname><![CDATA[Murphy]]></surname>
<given-names><![CDATA[S.]]></given-names>
</name>
</person-group>
<source><![CDATA[Coloumb stress triggering in the underground environment.]]></source>
<year></year>
<conf-name><![CDATA[1st Canada-US Rock Mechanics Symposium]]></conf-name>
<conf-date>27-31 May 2007</conf-date>
<conf-loc>Vancouver </conf-loc>
</nlm-citation>
</ref>
<ref id="B3">
<nlm-citation citation-type="confpro">
<person-group person-group-type="author">
<name>
<surname><![CDATA[Mendecki]]></surname>
<given-names><![CDATA[A.]]></given-names>
</name>
</person-group>
<source><![CDATA[Persistence of seismic rock mass response to mining.]]></source>
<year></year>
<conf-name><![CDATA[6th International Symposium on Rockburst and Seismicity in Mines]]></conf-name>
<conf-date>March 2005</conf-date>
<conf-loc>Perth </conf-loc>
</nlm-citation>
</ref>
<ref id="B4">
<nlm-citation citation-type="">
<person-group person-group-type="author">
<name>
<surname><![CDATA[Dukes]]></surname>
<given-names><![CDATA[G.]]></given-names>
</name>
</person-group>
<source><![CDATA[Shaft pillar extraction survey.: AngloGold Ashanti. Unpublished internal report]]></source>
<year>June</year>
<month> 2</month>
<day>00</day>
</nlm-citation>
</ref>
<ref id="B5">
<nlm-citation citation-type="">
<person-group person-group-type="author">
<name>
<surname><![CDATA[Mendecki]]></surname>
<given-names><![CDATA[A.]]></given-names>
</name>
</person-group>
<source><![CDATA[Optimisation of the routine seismic hazard rating system for ANG mines.: AngloGold Ashanti. Unpublished report]]></source>
<year>2004</year>
</nlm-citation>
</ref>
<ref id="B6">
<nlm-citation citation-type="journal">
<person-group person-group-type="author">
<name>
<surname><![CDATA[Ryder]]></surname>
<given-names><![CDATA[J.A.]]></given-names>
</name>
</person-group>
<article-title xml:lang="en"><![CDATA[Excess shear stress in the assessment of geologically hazardous situations.]]></article-title>
<source><![CDATA[Journal of the South African Institute of Mining and Metallurgy]]></source>
<year>1988</year>
<volume>88</volume>
<numero>1</numero>
<issue>1</issue>
<page-range>27-39</page-range></nlm-citation>
</ref>
<ref id="B7">
<nlm-citation citation-type="journal">
<person-group person-group-type="author">
<name>
<surname><![CDATA[Van Antwerpen]]></surname>
<given-names><![CDATA[J.]]></given-names>
</name>
</person-group>
<article-title xml:lang="en"><![CDATA[TauTona Gold Mine.]]></article-title>
<source><![CDATA[Personal communication]]></source>
<year>2007</year>
<month>Ju</month>
<day>ne</day>
</nlm-citation>
</ref>
<ref id="B8">
<nlm-citation citation-type="">
<person-group person-group-type="author">
<name>
<surname><![CDATA[Leach]]></surname>
<given-names><![CDATA[T.]]></given-names>
</name>
</person-group>
<source><![CDATA[Consultancy report: Summary-Rock engineering discussions concerning mining in the TauTona shaft pillar.]]></source>
<year>2007</year>
</nlm-citation>
</ref>
</ref-list>
</back>
</article>
