http://dx.doi.org/10.18820/24150487/as28i2.5 

RESEARCH ARTICLE

 

Examining the maturity of South Africa's government departments to implement the Infrastructure Delivery Management System (IDMS)

 

 

Progress ChigangachaI; Theodore HauptII; Bankole AwuzieIII

IConstruction Studies, School of Engineering, University of KwaZulu-Natal, South Africa. Phone: 078 869 7119, email: <pschigangacha@gmail.com> ORCID: https://orcid.org/0000-0002-5602-8673
IIFaculty of Engineering, Mangosuthu University of Technology, Durban, South Africa. Phone: 0826861852, email: <theo.haupt@mut.ac.za>, ORCID: https://orcid.org/0000-0002-2531-3789
IIIFaculty of Engineering, Built Environment and Information Technology, Central University of Technology, Free State, South Africa. Phone: 051 507 4315, email: <bawuzie@cut.ac.za>, ORCID: https://orcid.org/0000-0003-3371-191X

 

 


ABSTRACT

The purpose of this exploratory study is to examine the maturity of South Africa's provincial government departments in engaging with the Infrastructure Delivery Management System (IDMS) towards facilitating effective infrastructure delivery. Furthermore, the study sought to formulate evidence-based interventions that could be utilised by these government departments to engender successful delivery of infrastructure assets and associated services to their beneficiaries. This research was descriptive and employed the quantitative research approach. Data was elicited from three provincial government departments in KwaZulu-Natal, South Africa. Structured maturity modelling questionnaires were deployed for data collection from the respondents. The emergent data was analysed using the Statistical Package for the Social Sciences (SPSS), Version 26. A One-Way ANOVA, aimed at enabling a comparative analysis of differences in the degree of maturity between the three provincial government departments that utilise the IDMS, was conducted. Results from the study indicate that the three departments (cases) had a maturity rating between 3 and 4, signifying well-defined and documented standard processes that can be improved over time. However, an IDMS-ready organisation would ideally have a maturity rating at level 5. In addition, the leadership dimension was found to be a driver of all other dimensions, where a high maturity level under this dimension directly correlates with improved maturity in the other dimensions. It is recommended that adequate management and leadership support is needed to improve organisational maturity in relation to IDMS implementation. The study was confined to KwaZulu-Natal, due to the short survey period for information gathering and data collection. The COVID-19 pandemic also had a great impact on the undertaking of some key research processes mostly affecting the research methodology, particularly during data collection. This study is the first of its kind in South Africa to assess the maturity of provincial government departments to implement the IDMS, which is indicative of an evaluation void gap.

Keywords: Infrastructure Delivery Management System (IDMS), public sector, organisational maturity, organisational readiness, South Africa


ABSTRAK

Die doel van hierdie verkennende studie is om die volwassenheid van die provinsiale regeringsdepartemente in Suid-Afrika te ondersoek deur met die infrastruktuurleweringsbestuurstelsel (IDMS) in verbinding te tree om effektiewe infrastruktuurlewering te vergemaklik. Verder wou die studie bewysgebaseerde intervensies formuleer wat deur hierdie regeringsdepartemente gebruik kan word om 'n suksesvolle aflewering van infrastruktuurbates en verwante dienste aan hul begunstigdes te verseker. Hierdie beskrywende navorsing maak gebruik van die kwantitatiewe navorsingsbenadering. Data is verkry uit drie provinsiale regeringsdepartemente in KwaZulu-Natal, Suid-Afrika. Gestruktureerde volwassenheidsmodelle-vraelyste is ontplooi vir data-insameling vanaf die respondente. Die opkomende data is ontleed met behulp van die Statistical Package for the Social Sciences (SPSS), Weergawe 26. 'n Eenrigting ANOVA is gebruik, om 'n vergelykende ontleding van die verskille in die mate van volwassenheid tussen die drie provinsiale staatsdepartemente wat die IDMS gebruik, moontlik te maak. Resultate uit die studie dui aan dat die drie departemente (gevalle) 'n volwassenheidsgraad tussen 3 en 4 gehad het, wat goed gedefinieerde en gedokumenteerde standaardprosesse aandui wat mettertyd verbeter kan word. 'n Organisasie wat gereed is vir IDMS het egter ideaal 'n volwassenheidsgraad op vlak 5. Die leierskapdimensie was ook 'n drywer van alle ander dimensies, waar 'n hoë volwassenheidsvlak onder hierdie dimensie direk korreleer met verbeterde volwassenheid in die ander dimensies. Dit word aanbeveel dat voldoende bestuurs-en leierskapsteun nodig is om organisatoriese volwassenheid ten opsigte van IDMS-implementering te verbeter. Die studie was beperk tot KwaZulu-Natal weens die kort opnametydperk vir die versameling van inligting en die insameling van data. Boonop het die COVID-19-pandemie 'n groot impak gehad op die uitvoering van enkele belangrike navorsingsprosesse wat meestal die navorsingsmetodologie beïnvloed het, veral tydens die insameling van data. Hierdie studie is die eerste in sy soort in Suid-Afrika wat die volwassenheid van provinsiale regeringsdepartemente beoordeel het om die IDMS te implementeer, wat 'n teken is van 'n leemte in die evaluering.

Sleutelwoorde: Afleweringbestuurstelsel vir infrastruktuur, openbare sektor, organisatoriese gereedheid, organisatoriese volwassenheid, Suid-Afrika


 

 

1. INTRODUCTION

Infrastructure has been described as an enabler of business growth and productivity (Quarterly Bulletin, 2012: 1; OECD, 2015: 1). Its contribution towards the actualisation of most of the sustainable development goals (SDGs) resonates in extant literature (Fasoranti, 2012: 513; Mahamadu, Manu, Booth, Olomolaiye, Coker, Ibrahim & Lamond, 2018: 2-24; Manu, Asiedu, Mahamadu, Olomolaiye, Booth, Manu, Ajayi & Agyekum, 2021). In addition, such contributions are known to extend to the achievement of goals associated with national development plans of successive governments across the globe. The attainment of these goals culminates in improved levels of economic growth, national competitiveness, and citizen well-being (Watermeyer 2018: 1; OECD, 2015: 1; Australian Government, Department of Infrastructure and Transport, 2012; Calderon & Serven, 2004: 2). The importance of adequate infrastructure is further demonstrated in its ability to impact on the well-being of individuals, as it affects several key functional societal elements such as the adequate provision of transport, electricity and water supplies, telecommunications, schools, and hospital infrastructure (OECD, 2015: 1; Quarterly Bulletin, 2012: 4).

The need to capacitate public sector organisations to enhance successful infrastructure delivery has assumed a frontline position in contemporary infrastructure delivery discourse, globally over the past two decades (Malete & Khatleli, 2019: 133; Thumbiran & Raphiri, 2016: 4). Organisations such as the UK's Infrastructure and Projects Authority and the Infrastructure Client Group have played significant roles in proposing guidelines for assisting infrastructure client organisations in improving their infrastructure procurement capabilities (ICE, 2021). In Australia, individual agencies and scholars are publishing and adopting their own guidelines, in some instances with hardly any or no coordination by government. This led to the publication of guidelines such as the Project Initiation Routemap (IPA, 2016), the ICE's Intelligent Client Capability Framework (Madter & Bower, 2015: 6-7), and the RICS Informed Infrastructure Client guidance document (RICS, 2015: 1-25).

Within the South African infrastructure procurement landscape, the Infrastructure Delivery Management System (IDMS) serves as a predominant guide for public sector organisations seeking to procure infrastructure assets and associated services (National Treasury, 2012: 3). In addition, a client guide for improving infrastructure project outcomes has also been proposed to support infrastructure clients within the South African context (Watermeyer, 2018). In as much as these guidelines are expected to guide clients towards effective infrastructure delivery, impediments to efficient infrastructure delivery persist, due to a seeming lack of capacity in public sector organisations to implement the IDMS. This much is confirmed by Thumbiran and Raphiri (2016: 4), who maintain that improper and/or lack of utilisation of the IDMS could be the cause of the underwhelming public sector infrastructure procurement performance. This study is prompted by this observation. Accordingly, this study seeks to assess the maturity of public sector infrastructure client organisations within the South African context to engage with the IDMS in the required manner, in order to achieve optimal infrastructure procurement. Furthermore, this study stems from the central proposition that poor interpretation and implementation of the IDMS by these organisations can lead to poor procurement performance. The lack of studies into this aspect has been observed, hence rendering this study imperative.

 

2. LITERATURE REVIEW

2.1 Nexus between infrastructure and national economic growth

Fourie (2006: 531) defines infrastructure in terms of "capitalness" and "publicness", with the former taking into account the degree of capital intensity, comprising of capital-intensive facilities, and the latter tackling the: social significance of infrastructure. An alternative definition of infrastructure reads "facilities, structures, networks, systems, plant, property, equipment, or physical assets - and the enterprises that employ them - that provide public goods, or goods that meet a politically mandated, fundamental need that the market is not able to provide on its own" (OECD, 2015: 2). On the other hand, Khumalo, Choga and Munapo (2017: 38) define infrastructure as a "set of facilities and systems that are necessary for a community to function". Gaal and Afrah (2017: 49) opine that infrastructure is the basic equipment and structures which are prerequisites for a country, region, or organisation to function properly. In the vast majority of the developing nations, the paucity of basic infrastructure has hampered economic progress and national competitiveness (Kodongo & Ojah, 2016: 105; Oxford Analytica, 2017: 3; Wethal, 2019: 2-3).

The correlation between infrastructure and national economic growth, as well as the interest in this area has long been a subject of research (Palei, 2015: 169-170; OECD, 2015: 2-4; Seadi, 2012: 1; Kim, 2006: 1; Agénor, 2010: 933). As far back as 1989, researchers such as Aschauer have sought to quantify the impact of infrastructure assets on economic growth. The effects of infrastructure productivity have been studied using economic models (Lakshmanan, 2011: 1-12). In some instances, behavioural approaches have been used to calculate the impact of infrastructure on national growth (Chatterjee & Mahbub Morshed, 2011: 1288-1306). Irrespective of the methods used, there appears to be consensus that infrastructure stimulates economic growth (Seidu, Young, Robinson & Ryan 2020: 225; Calderon & Serven, 2004: 1). Aschauer (1989), cited in Ramirez and Esfahani (1999: 1), observed a dip in economic growth rates following a reduction in investment. Furthermore, the International Monetary Fund (IMF) (2014) reported that one percentage point in infrastructure investment in relation to GDP results in long-term gain outputs averaging 1% to 5%. Seadi (2012: 1-2) went further to posit that infrastructure is crucial for the achievement of a country's development plans and economic goals, as it drives production processes across all economic facets. Despite the added benefits of infrastructure investment, the choice of investment must be carefully planned to ensure that infrastructure does not outweigh demand, as overinvestment can prove to be counterproductive (Seidu et al., 2020: 219-220). The fact that infrastructure impacts on productivity and national growth can be substantiated from different angles, some of which have been summarised as:

Trade, as a significant contributor of economic and national development, is largely dependent on the availability of adequate infrastructure (Calderon & Serven, 2004: 1; Watermeyer & Phillips, 2020: 2).

Many governments have used infrastructure as a driver for economic growth through job creation, as they resort to funding labour-intensive infrastructural projects, especially during times of recession (Quarterly Bulletin, 2012: 1; Watermeyer, 2018: 1).

In some instances, infrastructure yields high rates of return on investment, leading to increased national income and overall national growth (Quarterly Bulletin, 2012: 1; Watermeyer, 2018: 1).

Infrastructure has also been a key factor in the integration and augmentation of markets and industries such as linking citizens to economic hubs through transport infrastructure, hence boosting economic activity (WEF, 2012: 2; Watermeyer, 2018: 1).

Transport infrastructure reduces time lost in traffic and the impact of distance, leading to greater productivity (Watermeyer, 2018: 1).

Telecommunications infrastructure allows for speedy flow of information, which is a requisite for business operations (Watermeyer, 2018: 1).

Electricity and water infrastructure is important for a well-functioning society and business operations (Watermeyer, 2018: 1).

2.2 Infrastructure delivery

There is persuasive evidence that infrastructure is an indispensable panacea to the challenges faced in most of the developing countries including South Africa, as it stimulates a robust and growing economic market (Malete & Khatleli, 2019: 129; Policy Brief, 2015: 3). Some of these challenges include, inter alia, poverty, huge public service delivery backlogs, and job deficiencies. As such, various scholars have argued for the improved ease of public access to infrastructure as a means of contributing to a reduction in income inequality prevalent in the vast majority of countries (Estache 2003; Zolfaghari, Kabiri & Saadatmanesh, 2020: 1147; Medeiros & Ribeiro, 2020). Consequently, South Africa has increased its expenditure on infrastructure development and improvement, in order to support its economic growth and development plans in a bid to reduce poverty and inequality, whilst addressing infrastructure backlogs and shortages (National Treasury, 2017: 3). According to Watermeyer and Phillips (2020: 1), the South African National Development Plan 2030 had set a public infrastructure investment target of 10% of the gross domestic product (GDP). Such ambitious targets are not peculiar to South Africa, as countries situated across the developed and developing world contexts have set similar targets. Corroborating this trend, Serebrisky, Suárez-Alemán, Pastor and Wohlhueter (2017: 8) confirmed that infrastructure investments as a proportion of GDP stood at 8.5% in China, 5% in India and Japan, and 4% in Australia, Canada and South Korea, respectively.

Despite the increased construction spend to alleviate the infrastructure deficit being experienced in South Africa, a considerable infrastructure gap persists (Malete & Khatleli, 2019: 129; Policy Brief, 2015: 2; Watermeyer & Phillips, 2020: 2). Notably, the challenges impacting on efficient infrastructure delivery cannot be exclusively attributed only to funding challenges but also to institutional failures and a lack of requisite capacity within the public sector (Rwelamila, 2007: 56-57; National Treasury, 2012; Khumalo et al., 2017: 35; Laryea, 2019: 618; Watermeyer, 2018; Watermeyer & Phillips, 2020: 6). The lack of organisational/institutional capacity within public sector organisations to engage in effective infrastructure procurement appears commonplace in the literature (Brook, 2021: 6; Khumalo et al., 2017: 35; Mahamadu et al., 2018: 3; Awuzie & McDermott, 2019; Laryea, 2019: 618; Watermeyer & Phillips, 2020: 6; Manu et al. 2021: 4). Various scholars admit to the criticality of institutional/organisational procurement capacity of public sector organisations in engendering the actualisation of procurement objectives associated with the commissioning of infrastructure projects. Relying on quantitative data gathered from 590 respondents in Nigeria and Ghana, Manu et al. (2021: 17) established that certain procurement capabilities contributed to the attainment of more procurement objectives when compared to other capabilities. Similarly, Winch and Leiringer (2016) postulated the potential of the 'strong owner' infrastructure client to bring about positive project delivery performance based on inherent capabilities. This resulted in the development of the 'owner project capabilities' based on the dynamic capabilities theoretical lens. Awuzie, Farag and McDermott (2017) corroborate this through the findings of their investigation into the influence of client attributes on successful social value implementation during infrastructure procurement. Lindblad and Gustavsson (2021) reiterate the ability of public sector clients to foster a change in working practices within the construction industry using a BIM exemplar. However, the ability to achieve this will be predicated on the procurement capabilities inherent in such organisations. Based on the foregoing, the contribution of properly capacitated public sector organisations to successful infrastructure procurement cannot be overemphasised (Watermeyer, 2018: 2).

2.3 Infrastructure Delivery Management System (IDMS)

The IDMS is a brainchild of the South African Government, in collaboration with the National Treasury, the Department of Public Works (DPW), the Construction Industry Development Board (CIDB), and the Development Bank of Southern Africa (DBSA) (CIDB, 2010: 9). The IDMS was formulated mainly to address the need for improved and adequate quality infrastructure and to curb the various challenges affecting infrastructure delivery. The main objectives of the IDMS can be summarised as providing a benchmark through fostering best practice; fostering improvement in the delivery of infrastructure; addressing skills deficiencies; ensuring a balance in infrastructural roll outs; enhancing cost effectiveness, and improving infrastructure planning (Malete & Khatleli; 2020: 130; Civilution, 2016: 2-3; National Treasury, 2012; WCG, 2012: 3).

This strategic guideline consists of a sequence of interrelated activities responsible for the transformation of infrastructural inputs into outputs (WCG, 2012: 2). Value placed on the IDMS is embedded in its strategic attributes to address the four key dimensions relating to infrastructure delivery, namely institutions, people, organisational behaviour, and human resource systems. As a standardised approach to public sector infrastructure delivery and management, the IDMS describes and outlines the processes pertaining to infrastructure delivery, from planning to asset disposal, thereby setting a benchmark for best practice guide (CIDB, 2010: 13). WCG (2012: 1) advises that the IDMS must be used throughout the entire life cycle of an infrastructural asset, incorporating activities such as "planning, budgeting, procurement, delivery, maintenance, operation, monitoring and evaluation of infrastructure".

2.3.1 Evolution of the IDMS

Formulated in 2004 as a tool to manage the delivery of infrastructure, the IDMS has evolved and has since shifted its focus from being substantially on project management to asset management, where it considers the full life cycle of infrastructure assets. Figure 1 illustrates the IDMS evolution since its inception.

 

 

2.3.2 IDMS alignment with ISO 55000 Asset Management System

Asset management, according to ISO 55000: 10, is a "coordinated activity of an organisation to realise value from assets". Infrastructure asset management strives to achieve a desired level of service in a cost-effective manner. Similar to IDMS processes, asset management processes are integral to the organisation's infrastructure planning, budgeting, and delivery processes. Figure 2 shows the relationship between key asset management terms.

 

 

The International Infrastructure Management Manual (2011), cited in Department of Higher Education and Training (DHET) - University Macro Infrastructure Framework (MIF) [Annexure 4] (DHET, 2019: 1) describes the key elements of asset management for infrastructure as:

Performance assessment defining the level of service and monitoring performance.

Gap assessment - demand management and infrastructure investment.

Risk management - identifying, assessing and appropriately managing risks.

Financial assessment - long-term financial plans identifying required expenditure and funding.

Service life approach to developing cost-effective management strategies for the long term that meet the desired level of service.

Figure 3 illustrates the relationship between the IDMS adaptation of ISO 55000 elements of an asset management system.

 

 

2.3.3 Objectives of the IDMS

The main objectives of the IDMS can be listed as:

Best practice guide. To set a guideline and act as a benchmark to public sector infrastructure delivery (CIDB, 2010: 13; Civilution, 2016: 3).

Improved delivery. To enhance improved infrastructure delivery (Civilution, 2016: 2; CIDB, 2018).

Shortage of skills. To address the apparent deficiencies in the availability of a skilled and competent workforce (Civilution, 2016: 2).

Improved planning. The IDMS seeks to curb the challenges of poor planning that have bedevilled South Africa's public sector infrastructure delivery (Civilution, 2016: 2).

Cost effectiveness. The IDMS seeks to ensure value for money during infrastructure delivery (CIDB, 2010: 101).

Reduction of the infrastructure gap. The IDMS seeks to reduce the infrastructure gap and to make affordable quality infrastructure available (National Treasury, 2012: 3)

2.3.4 Impediments to optimal IDMS implementation

The impediments affecting IDMS implementation are in part responsible for the failure by the relevant provincial government departments to successfully deliver infrastructure and associated services. As a result of these challenges, the economic conditions of a country are negatively impacted, due to the overt dependence on infrastructure to address developmental aspirations and policy objectives. Some of these challenges include:

Prevalence of poor interdepartmental relationships and unclear communication channels (Thiry & Deguire 2007: 653; Thumbiran & Raphiri, 2016: 4; Awuzie & McDermott, 2019: 115-142).

Poor leadership and management structures (Awuzie & McDermott, 2019: 115-142; Thumbiran & Raphiri, 2016: 4).

Limited technical capacity (Thumbiran & Raphiri, 2016: 4).

Governance issues and collusion within the industry (Thumbiran & Raphiri, 2016: 4; Awuzie & McDermott, 2019: 115-142).

2.4 Maturity modelling

Fowler (2014) defined a maturity model as a tool that measures the effectiveness of an individual or organisation to achieve desired outcomes. Furthermore, the model enables an establishment of the capabilities required to enhance process or organisational improvement. Maturity models facilitate an identification and performance of the relevant steps required by organisations and/or individuals to attain higher levels of maturity concerning a phenomenon (Kohlegger, Maier & Thalmann, 2009: 59). The use of maturity models has been on the rise since its initial development by US-based Software Engineering Institute (SEI), in association with the Mitre Corporation in 1986 (Willis & Rankin, 2010: 87). At that point, it was saddled with an initial aim of improving the software processes of certain organisations. Despite having evolved from the software industry, the use of maturity models has since spread to other industries such as project and programme management, among others (Willis & Rankin, 2010: 88; Grim, 2009: 71). The utility of these models across various domains has been attributed to their process-oriented nature and ease of adaptation to other domains (Bayraksan, 2009: 3; Grim, 2009: 74).

Maturity models are used to evaluate an organisation's capability of maturity elements, usually from a rating of 1 - initial (ad hoc) to 5 -optimised. Schumacher, Enrol and Sihn (2016: 164) as well as Grim (2009: 72) posit that level 1 shows a complete lack of attributes, whereas level 5 describes world-class attributes. According to ISO 8000-62 (2018: 2-3) as well as Carretero, Caballero and Piattini (2016: 249), maturity assessments consider the following process attributes to determine the level of maturity:

Process performance.

Performance management.

Work product management.

Process definition.

Process deployment.

Quantitative analysis (Process measurement).

Quantitative control (Process control).

Process innovation (Process optimisation.

Process innovation implementation.

2.4.1 Maturity scale for appraising public sector readiness to utilise the IDMS

The main objective of maturity modelling is to drive process improvement. As such, maturity models can be applied as a control measure to ensure that processes are consistently adhered to within an organisation, consequently fostering management excellence. While Heller and Varney (2013: 7) identified seven tenets of a maturity model, Schumacher et al. (2017: 163) identified nine. Building on the foundation laid by both studies, a structured maturity model matrix was developed. This emergent maturity model matrix was divided into nine dimensions. (See Table 1.)

 

 

3. METHODOLOGY

3.1 Research methods

This study examined the maturity of South Africa's provincial government departments in engaging with the extant IDMS. A multi-case study research design was used, and data was collected quantitatively through structured maturity modelling questionnaire surveys. Three provincial government departments of Education, Health and Public Works in the KwaZulu-Natal region that utilise the IDMS were identified and used as case studies. This allowed for an in-depth understanding of the level of maturity of each department and for comparative analysis purposes via a cross-case analysis of the findings and to subsequently evaluate the critical areas of where major variances were noted. Given that the cases could not be considered without the context, only provincial government departments that engage the IDMS were selected for this study.

3.2 Population and sample

The target respondents were architects, engineers and quantity surveyors in senior, management and leadership positions with over five years' working experience in the industry. They were required to have extensive knowledge of IDMS implementation. As informed by the outcome from a pilot study, the population was greatly reduced and distribution of questionnaires was streamlined to only individuals in senior positions and those in a managerial capacity with the requisite knowledge and experience relating to IDMS implementation, in lieu of distribution to everyone engaging the IDMS. This resulted in a combined list of 54 professionals forming the population. Krejcie and Morgan (1970: 608) recommend that, for a population of 55, the sample size ought to be 44. This study, however, surveyed the entire population due to its small size. In addition, the study placed priority on obtaining quality results rather than population and sample sizes.

Questionnaires were sent to 54 participants by email and a total of 34 questionnaires were completed correctly and returned, representing a 63% response rate (Table 2). Taking a proposition by Moyo and Crafford (2010: 68) into account where survey responses within the built environment vary between 7% and 40%, the response is good to support this empirical study.

 

 

3.3 Data collection

Initially, expert interviews were conducted to facilitate the development of the maturity model by establishing the key maturity items to be included. Thereafter, a preliminary maturity model was developed, and a pilot study was undertaken to improve the data-collection instrument (questionnaire) and to provide valuable feedback that would subsequently be incorporated. Questionnaires were distributed electronically from October 2019 to July 2020. This study reports on the latter stage only.

The structured maturity modelling questionnaire was divided into two sections. The first section captured data about, for example, the respondents' years of experience with IDMS implementation and the government department with which they were associated. The second section collected data on the perceived maturity across the nine dimensions of the maturity model. The maturity items were developed via a two-step process, which entailed a systematic literature review and expert interviews. The proposed model, consisting of nine dimensions, was subdivided into a total of 52 maturity items. Respondents were required to rate the maturity items on a 5-point Likert scale (1 = not fully implemented, 5= fully implemented). However, the maturity items had differing importance towards maturity in IDMS implementation, as an example, on the leadership dimension, the item "We have skilled leadership which leads by example" could have a higher contribution when compared to the item "Our senior/top management are committed to implementation of the IDMS in our enterprise". This, therefore, called for a practical importance rating to be included in the questionnaire, in order to establish the item's maturity contribution, where (rating = 1) meant "not important" and (rating = 4) meant very important. To reduce the respondents' bias, closed-ended questions were used for section two (Akintoye & Main, 2007: 601).

3.4 Data analysis and interpretation of the findings

The following formula was used to calculate the maturity level:

Where M = Maturity D = Dimension I = Item

g = Weighting factor

n = Number of maturity item

Table 3 presents the proposed maturity scale.

 

 

Table 3 illustrates the maturity scale in relation to organisation level of implementation of the IDMS. It is in the interest of an organisation to continuously strive to improve its processes, in order to transition from one level to the next in pursuit of delivering improved outcomes. Figure 4 illustrates the organisational process capabilities to foster such transition.

 

 

Descriptive statistical analysis was conducted, using the Statistical Package for the Social Sciences (SPSS), version 25 (Pallant, 2013: 134). The analysis of questionnaire data is presented in two stages, the first stage being an intra-case analysis, and the second stage being the cross-case analysis. For the cross-case analysis, the statistical analysis used is the One-Way ANOVA, which aimed at conducting a comparative analysis of differences between the three entities/organisations (provincial government departments) that utilise the IDMS.

The collected data was subjected to a reliability and consistency test using the Cronbach alpha test. The alpha values ranged between 0.70 and 0.91, which is indicative of at least a "good" level of reliability and is, therefore, acceptable. It is recommended that acceptable values of Cronbach's alpha should range from 0.60 to 0.95 (Taber, 2018: 1279).

3.5 Limitations of the study

A small sample size was used because of the specialist or expert input required from the study participants. Only those individuals with substantial experience and detailed knowledge of the IDMS had the capability to partake in the study, thereby significantly limiting the number of participants. Furthermore, the study was confined to KwaZulu-Natal, due to the short survey period for information gathering and data collection. The COVID-19 pandemic greatly impacted on data collection, as some of the individuals who were identified as key to providing information in relation to IDMS implementation were not available to contact.

 

4. RESULTS

4.1 Respondents' profile

The results in Table 4 are indicative of a good mix and a fair representation of each department in the study population. Based on frequency of occurrence, most of the respondents (61.8%) were males; 8.8% of the respondents were in the age group 18-25 years, with 26.5% of the respondents having experience in IDMS implementation of between 1 to 5 years. This shows that there were few participants aged between 18 and 25 years. These results further demonstrate the much-needed experience in IDMS implementation.

 

 

4.2 IDMS implementation: Cross-case analysis

Table 5 shows the comparative maturity indices and rankings of the nine dimensions between the three governmental departments.

 

 

The results indicate that DoH has the highest maturity rating (mean = 3,54), followed by DoE (mean = 3,08) and DPW third (mean = 3,00). It could be argued that the overall maturity index of the DoH is higher than that of the other two departments because of the high maturity of the leadership dimension. The pivotal role of upper management (leadership) is critical to setting strategic direction, policy planning as well as general management and monitoring of all employees, which are all imperative for organisational success. In other words, the leadership dimension can be viewed as a driver of all other dimensions, where a high maturity level under this dimension directly correlates with improved maturity in the other dimensions. Similarly, committing to tackle any other dimension without leadership commitment could have a negative impact on the overall organisational maturity index, as leadership should be the driving force for all initiatives. It could, therefore, be argued that the lower overall maturity indices for DPW and DoE could be attributed to their focus and priority being on other dimensions and not on leadership, which was ranked 4th within both departments. Figure 5 is a radar chart used to provide a holistic visualisation of the comparative results in the nine dimensions between the departments.

 

 

It is evident that DoH consistently performed high in all but two dimensions, namely customers and culture. While the DoH performed better in the leadership dimension, both the DoE and DPW had the highest implementation in the governance dimension. It is notable that all three departments had a relatively high implementation level for the governance dimension, probably as an effort to curb the reported widespread poor governance issues in and across public entities. The culture dimension, however, shows a very different picture, as it was generally ranked low across all departments. Evidently, DoH performed significantly better when compared to the other two departments in the technology and operations dimensions. On the other hand, DPW had a seemingly low rating in the technology and operations dimensions. Generally, Figure 5 suggests that, in order to improve on organisational maturity and overall organisational readiness, the departments could improve on all dimensions, as all but the governance dimension within DPW have scores <4.

4.3 ANOVA Statistical analysis

The one-way analysis of variance (ANOVA) was used to determine whether there were any statistically significant differences between the means of the three departments. Table 6 summarises the ANOVA findings.

The significant values, p <0.05, are indicated with a *. Evidently, the three departments ranked 21 out of 52 items as significantly different. Of those 21 items, the ANOVA test further shows that four out of the nine dimensions, namely strategy, leadership, culture and technology each have >50% of their statements with a p <0.05 indicative of significant differences in these dimensions. These differences indicate that each organisation is unique and has its own management styles, further supporting the need to use the IDMS as a guide, and to further adapt it to be organisation specific, in order to enhance its effective utilisation. In addition, these differences could explain the disparity in maturity to implement the IDMS by the departments. On the other hand, for the balance of the statements across all dimensions (31 out of 52) (60%), where P value >0.05, it implies that there are no statistically significant differences between the groups. This could signify that intervention could be applied at national level to address any challenges in IDMS implementation across the dimensions in a bid to improve both dimension and organisation maturity ratings.

4.4 Comparison between maturities of provincial government departments against the maturity levels needed to effectively implement IDMS

For an organisation to be considered mature, it has to be rated at level 5 of the maturity model, which denotes systems and processes being optimised. An IDMS-ready organisation would, therefore, be proactive and will possess the ability to efficiently manage and maintain its portfolio management, programme and project management, as well as operations and maintenance processes. It is, therefore, evident that, even though a maturity rating of 5.0 is required for the implementation, the departments are all ranked within level 3. This calls for the departments to constantly work on improving their processes, especially within the leadership and people dimensions that have been identified in the study and in literature, respectively as carrying more weighting with respect to improving organisational maturity. Furthermore, as noted in Figure 1, the IDMS is bound to evolve, and its evolution has seen a shift from focus being mostly on project management to asset management. This evolution consequently requires the departments to adapt to such changes by realigning their organisational processes and constantly building their capacity.

Previous studies have identified the leadership dimension as having a huge impact on organisational or project performance. A case study conducted by Watermeyer (2018), which surveyed 130 senior officials in public office involved in infrastructure projects, found leadership, among other factors, as critical to influencing successful project outcomes. Another study by Chaudhry, Kalyar, Rehman and Kouassi (2012: 21) found that leadership, responsible for providing organisational direction by giving guidelines to its employees and managing them, ought to work closely with them and address any problems as they arise. IDMS implementation begins at the strategic level, indicative of the need for adequate leadership and expertise in infrastructure planning and management, with calculated decision-making, in order to attain optimal project performance. Importantly, SANS ISO 55000 identifies leadership and organisational culture as key determinants of value realisation. There is a positive correlation between effective leadership and improved project performance (Watermeyer & Phillips, 2020: 5; Yukl, 2009: 49-53). As such, effective leadership can be considered a requisite throughout the project's life cycle, commencing at a strategic level up to project close out (Watermeyer, 2018: 3). It is, imperative to ensure that, before responsibilities are assigned, employee skills and competence levels be assessed to ensure adequate task allocation that enhances organisation effectiveness and stability. A major impediment to infrastructure delivery and IDMS implementation has been attributed to the people dimension. The public sector has been cited as lacking sufficient expertise and capacity (Civilution, 2016: 2; Rwelamila, 2007: 56-57; National Treasury, 2012; Khumalo et al., 2017: 35; Laryea 2019: 618; Watermeyer, 2018; Malete & Khatleli, 2019; Watermeyer & Phillips, 2020: 6).

 

5. CONCLUSION

This study set out to examine the maturity of South Africa's government departments to implement the IDMS. By utilising a well-structured maturity modelling questionnaire by electronic means and purposive sampling techniques, data were collected from experienced individuals within the three government departments. Appropriate analytical tools were adopted, and the study was able to make meaningful findings.

The study found that, although all the nine dimensions of the maturity model, namely strategy, leadership, customers, products, operations, culture, people, governance, and technology, were critical to the state of organisational readiness, the leadership dimension carried more weight. The Department of Health, which had the most maturity/implementation of the leadership dimension, had a greater overall organisational maturity when compared to the departments of Education, and Public Works. It is, therefore, imperative that, in order to improve organisational readiness, the factors that influence maturity must be improved on. The pivotal role of upper management (leadership) is critical to enhancing organisational performance and is a driver of all other dimensions because increased leadership maturity influences the maturity of other dimensions. Similarly, committing to improve on any other dimension without leadership commitment would be futile and could have a negative impact on the overall organisational maturity index, as leadership should be the driving force for all initiatives.

This study is the first of its kind that seeks to assess the maturity of South Africa's public sector to implement the IDMS. Establishing the maturity level of an organisation is critical, because once assessed the areas in need of improvement will be highlighted, which if addressed would impact on improving the maturity of organisations to implement the IDMS. This study was also critical in establishing that the level of maturity of an organisation must be assessed prior to or accompanying the introduction of the IDMS to organisations. The instrument developed to measure an organisation's maturity could prove to be a very important tool in identifying organisational weaknesses and improving the level of maturity of the organisation.

Furthermore, this study counters the argument that the government perceives the implementation of its tools, the IDMS in this case, to be effective upon launching/implementation. It is apparent that the government has to do more to ensure that organisations are well equipped and are mature to an extent that ensures effectiveness in implementation of the tools before launching. In addition, establishing an organisation's maturity level equips leadership with the right knowledge to make informed decisions. This could help in formulating strategic plans and in fostering these organisations to effect the necessary changes. Therefore, the organisation can potentially reconsider the organisational theories and management models they utilise, which, in some instances, could be hindering organisational success.

 

6. RECOMMENDATIONS FOR FUTURE STUDIES

This study was carried out in the KwaZulu-Natal province of South Africa, and this is a critical limitation toward the generalisation of the findings. A similar and broader study could be undertaken, albeit, on a national level to compare the maturity of public entities throughout the country and to establish provincial differences.

 

REFERENCES

Agénor, P.R. 2010. A theory of infrastructure-led development. Journal of Economic Dynamics and Control, 34(5), pp. 932-950. https://doi.org/10.1016/j.jedc.2010.01.009        [ Links ]

Akintoye, A. & Main, J. 2007. Collaborative relationships in construction: The UK contractor's perception. Engineering, Construction and Architectural Management, 14(6), pp. 597-617. https://doi.org/10.1108/09699980710829049        [ Links ]

Aschauer, D.A. 1989. Is public expenditure productive? Journal of Monetary Economics, 23(2), pp. 177-200. https://doi.org/10.1016/0304-3932(89)90047-0        [ Links ]

Australian Government: Department of Infrastructure and Transport. 2012. Infrastructure planning and delivery: Best practice case studies, Vol. 2. Commonwealth of Australia.         [ Links ]

Awuzie, B.O. & Mcdermott, P. 2019. Infrastructure delivery systems: Governance and implementation issues. Singapore: Springer.         [ Links ]

Awuzie, B.O., Farag, F. & Mcdermott, P. 2017. Achieving social value through construction frameworks: The effect of client attributes. Proceedings of the Institution of Civil Engineers - Management, Procurement and Law, 171(1), pp. 25-31. https://doi.org/10.1680/jmapl.17.00009        [ Links ]

Bayraksan, H. 2009. A report on the capability maturity model. [Online]. Available at: <https://docplayer.net/11985145-A-report-on-the-capability-maturity-model.html> [Accessed: 19 November 2020].         [ Links ]

Brook, P. 2021. Case study on delivery management of infrastructure projects in the public sector. National Treasury, South Africa.         [ Links ]

Calderon, C. & Serven, L. 2004. The effects of infrastructure development on growth and income distribution. Policy Research Working Paper Number 3400. Washington DC: World Bank. https://doi.org/10.1596/1813-9450-3400        [ Links ]

Carretero, A.G., Caballero, I. & Piattini, M. 2016. MAMD: Towards a data improvement model based on ISO 8000-6X and ISO/IEC 33000. In: Clarke, P.M. et al. (Eds). Proceedings of the 16th International Conference on Software Process Improvement and Capability Determination (SPICE 2016 CCIS 609), 9-10 June, Dublin, Ireland, pp. 241-253. https://doi.org/10.1007/978-3-319-38980-6_18        [ Links ]

Chatterjee, S. & Mahbub Morshed, A.K.M. 2011. Infrastructure provision and macroeconomic performance. Journal of Economic Dynamics and Control, Elsevier, 35(8), pp. 1288-1306. https://doi.org/10.1016/j.jedc.2011.03.007        [ Links ]

Chaudhry, M.S., Kalyar, M.N., Rehman, A. & Kouassi, W. 2012. The impact of leadership on project performance. Industrial Engineering Letters, 2(2), pp. 18-24.         [ Links ]

CIDB (Construction Industry Development Board). 2010. Infrastructure Delivery Management Toolkit Management Companion. [Online]. Available at <http://toolkit.cidb.org.za/Shared%20Documents/IDM-Toolkit-Management-Companion-v9-1-2010-10-17.pdf> [Accessed: 13 January 2021].         [ Links ]

Civilution. 2016. Focus on: National Treasury standard for infrastructure procurement and delivery management. Department of National Treasury, South Africa.         [ Links ]

DHET (Department of Higher Education and Training) - University Macro Infrastructure Framework (MIF). 2019. Infrastructure Management Guidelines for Universities. 2nd edition. [Online]. Available at: <https://www.dhet.gov.za/Manuals/DHET%20MIF%20guidelines%20(second%20 edition)%20with%20Annexures.pdf> [Accessed: 14 May 2021]        [ Links ]

Estache, A. 2003. On Latin America's infrastructure privatization and its distributional effects. World Bank Working Paper. Washington, DC: World Bank. https://doi.org/10.2139/ssrn.411942        [ Links ]

Fasoranti, M.M. 2012. The effect of government expenditure on infrastructure on the growth of the Nigerian economy, 1977-2009. International Journal of Economics and Finance Issues, 2(4), pp. 513-518.         [ Links ]

Fourie, J. 2006. Economic infrastructure: A review of definitions, theory and empirics. South African Journal of Economics, Economic Society of South Africa, 74(3), pp. 530-556. https://doi.org/10.1111/j.1813-6982.2006.00086.x        [ Links ]

Fowler, M. 2014. Maturity model. [Online]. Available at: <https://martinfowler.com/bliki/MaturityModel.html> [Accessed: 12 February 2021].         [ Links ]

Gaal, H.O. & Afrah, N.A. 2017. Lack of infrastructure: The impact on economic development as a case of Benadir region and Hir-shabelle, Somalia. Developing Country Studies, 7(1), pp. 49-66.         [ Links ]

Grim, T. 2009. Foresight Maturity Model (FMM): Achieving best practices in the foresight field. Journal of Futures Studies, 13(4), pp. 69-80.         [ Links ]

Heller, A. & Varney, J. 2013. Using process management maturity models. A path to attaining process management excellence. Houston: APQC.         [ Links ]

ICE (Institute of Civil Engineers). 2021. Infrastructure client group. [Online]. Available at: <https://www.ice.org.uk/about-ice/infrastructure-client-group> [Accessed: 10 August 2021].         [ Links ]

IMF (International Monetary Fund). 2014. World economic outlook: Legacies, clouds, uncertainties. Washington D.C: International Monetary Fund. https://doi.org/10.5089/9781484372265.081        [ Links ]

IPA (Infrastructure and Projects Authority). 2016. The Project Initiation Routemap. [Online]. Available at: <https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/529311/ handbook_2016.pdf> [Accessed: 19 October 2020].         [ Links ]

ISO 55000. 2014. Asset management - Overview, principles and terminology. Geneva, Switzerland: ISO.         [ Links ]

ISO 8000-62. 2018. Data quality - Part 62: Data quality management: Organizational process maturity assessment: Application of standards relating to process assessment. Geneva, Switzerland: ISO.         [ Links ]

Khumalo, M.J., Choga, I. & Munapo, E. 2017. Challenges associated with infrastructure delivery. Public and Municipal Finance Journal, 6(2), pp. 35-45. https://doi.org/10.21511/pmf.06(2).2017.04        [ Links ]

Kim, B. 2006. Infrastructure development for the economic development in developing countries: Lessons from Korea and Japan. GSICS Working Paper Series 11, Graduate School of International Cooperation Studies, Kobe University.         [ Links ]

Kodongo, O. & Ojah, K. 2016. Does infrastructure really explain economic growth in sub-Saharan Africa? Review of Development Finance, 6(2), pp. 105-125. https://doi.org/10.1016/j.rdf.2016.12.001        [ Links ]

Kohlegger, M., Maier, R. & Thalmann, S. 2009. Understanding maturity models results of a structured content analysis. In: Tochtermann, K. (Ed.). Proceedings of I-KNOW '09 and I-SEMANTICS '09, 2-4 September, Graz, Austria, pp. 51-61.         [ Links ]

Krejcie, R.V. & Morgan, D.W. 1970. Determining sample size for research activities. Educational and Psychological Measurement, 30(3), pp. 607-610. https://doi.org/10.1177/001316447003000308        [ Links ]

Lakshmanan, T. 2011. The broader economic consequences of transport infrastructure investments. Journal of Transport Geography, 19(1), pp. 1-12. https://doi.org/10.1016/j.jtrangeo.2010.01.001        [ Links ]

Laryea, S. 2019. Factors causing inefficient infrastructure procurement and delivery management in South Africa. In: Laryea, S. & Essah, E. (Eds). Proceedings of the West Africa Built Environment Research (WABER) 10th Anniversary Conference, 5-7 August, Accra, Ghana, pp. 106-620.         [ Links ]

Lindblad, H. & Gustavsson, T.K. 2021. Public clients' ability to drive industry change: The case of implementing BIM. Construction Management and Economics, 39(1), pp. 21-35. https://doi.org/10.1080/01446193.2020.1807032        [ Links ]

Madter, N. & Bower, D.A. 2015. Briefing: The ICE intelligent client capability framework. Proceedings of the ICE - Management, Procurement and Law, 168(1), pp. 6-7. https://doi.org/10.1680/mpal.14.00036        [ Links ]

Mahamadu, A., Manu, P., Booth, C., Olomolaiye, P., Coker, A., Ibrahim, A. & Lamond, J. 2018. Infrastructure procurement skills gap amongst procurement personnel in Nigeria's public sector. Journal of Engineering Design and Technology, 16(1), pp. 2-24. https://doi.org/10.1108/JEDT-09-2017-0089        [ Links ]

Malete, R. & Khatleli, N. 2019. Efficacy in infrastructure delivery post-apartheid: An analysis of infrastructure delivery management system in the public sector in South Africa. In: Proceedings of the 11th Annual SACQSP International Conference, 16-17 September, Johannesburg, South Africa, pp. 129-138.         [ Links ]

Manu, P., Asiedu, R.O., Mahamadu, A.M., Olomolaiye, P., Booth, C., Manu, E., Ajayi, S. & Agyekum, K. 2021. Contribution of procurement capacity of public agencies to attainment of procurement objectives in infrastructure procurement. Engineering Construction and Architectural Management. Forthcoming. https://doi.org/10.1108/ECAM-05-2020-0375        [ Links ]

Medeiros, V. & Ribeiro, R.S.M. 2020. Power infrastructure and income inequality: Evidence from Brazilian state-level data using dynamic panel data models. Energy Policy, 146(C), Article 111734. https://doi.org/10.1016/j.enpol.2020.111734        [ Links ]

Moyo, T. & Crafford, G. 2010. The impact of hyperinflation on the Zimbabwean construction industry. Acta Structilia, 17(2), pp. 53-83.         [ Links ]

Municipal Infrastructure Support Agent (MISA). 2019. Infrastructure Delivery Management System (IDMS) Pilot roll out in selected municipalities through stakeholder engagement and training. Training Module 3: Infrastructure Delivery Management Processes. Participants Manual. [Online]. Available at: <https://www.misa.gov.za/wp-content/uploads/2019/11/Module-A0_Executive-Overview_Manual_opt.pdf> [Accessed: 5 May 2021]        [ Links ]

National Treasury. 2012. Standard for an infrastructure delivery management system. Pretoria: National Treasury.         [ Links ]

National Treasury. 2017. Budget Review. Pretoria: National Treasury.         [ Links ]

OECD (Organization for Economic Co-operation and Development). 2015. Towards a framework for the governance of infrastructure. Public Governance and Territorial Development Directorate Public Governance Committee. [Online]. Available at: <https://www.oecd.org/gov/budgeting/Towards-a-Framework-for-the-Governance-of-Infrastructure.pdf> [Accessed: 12 January 2021]        [ Links ]

Oxford Analytica. 2017. Nigeria's infrastructure backlog could worsen. Expert briefings. [Online]. Available at: <https://doi.org/10.1108/OXAN-DB227584> [Accessed: 19 November 2020].         [ Links ]

Palei, T. 2015. Assessing the impact of infrastructure on economic growth and global competitiveness. Procedia Economics and Finance, vol. 23, pp. 168-175. https://doi.org/10.1016/S2212-5671(15)00322-6        [ Links ]

Pallant, J. 2013. SPSS survival manual - A step by step guide to data analysis using the SPSS program. 4th edition. Berkshire: McGraw Hill.         [ Links ]

Policy Brief. 2015. Responding to South Africa's infrastructure challenge. Financial and Fiscal Commission 1/2015.         [ Links ]

Quarterly Bulletin. 2012. Infrastructure development in South Africa and Gauteng. Economic Analysis Unit of SRM. Gauteng Province: Provincial Treasury. South Africa [Online]. Available at: <https://silo.tips/download/infrastructure-development-in-south-africa-and-gauteng> [Accessed: 15 December 2020]        [ Links ]

Ramirez, M.A. & Esfahani, H.A. 1999. Infrastructure and economic growth. Unpublished thesis, University of Illinois, Urbana-Champaing. https://doi.org/10.2139/ssrn.193808        [ Links ]

RICS (Royal Institute of Chartered Surveyors). 2015. The informed infrastructure client. London, UK: RICS.         [ Links ]

Rwelamila, P.M.D. 2007. Project management competence in public sector infrastructure organisations. Construction Management & Economics, 25(1), pp. 55-66. https://doi.org/10.1080/01446190601099210        [ Links ]

Schumacher, A., Enrol, S. & Sihn, W. 2016. A maturity model for assessing Industry 4.0 readiness and maturity of manufacturing enterprises. Procedia CIRP, 52(2016), pp. 161-166. https://doi.org/10.1016/j.procir.2016.07.040        [ Links ]

SEADI (Support for Economic Analysis Development in Indonesia Program). 2012. Economic Growth Office. USAID, Indonesia.         [ Links ]

Seidu, R., Young, B.E., Robinson, H. & Ryan, M. 2020. The impact of infrastructure investment on economic growth in the United Kingdom. Journal of Infrastructure, Policy and Development, 4(2), pp. 217-227. https://doi.org/10.24294/jipd.v4i2.1206        [ Links ]

Serebrisky, T., Suárez-Alemán, A., Pastor, C. & Wohlhueter, A. 2017. Increasing the efficiency of public infrastructure delivery: Evidence-based potential efficiency gains in public infrastructure spending in Latin America and the Caribbean. IDB Monograph no. 553, Inter-American Development Bank. https://doi.org/10.18235/0000846        [ Links ]

Taber, K.S. 2018. The use of Cronbach's alpha when developing and reporting research instruments in science education. Research in Science Education, 48(6), pp. 1273-1296. https://doi.org/10.1007/s11165-016-9602-2        [ Links ]

Thiry, M. & Deguire, M. 2007. Recent developments in project-based organizations. International Journal of Project Management, vol. 25, pp. 649-658. https://doi.org/10.1016/j.ijproman.2007.02.001        [ Links ]

Thumbiran, I. & Raphiri, R. 2016. CIDB perspective: Alignment to the construction procurement environment. CIDB Provincial Stakeholder Liaison Meetings, July-September.         [ Links ]

Watermeyer, R. 2018. Client guide for improving infrastructure project outcomes. Johannesburg, University of the Witwatersrand: School of Construction Economics and Management.         [ Links ]

Watermeyer, R. & Phillips, S. 2020. Public infrastructure delivery and construction sector dynamism in the South African economy. National Planning Commission Economy Series - Background Paper.         [ Links ]

WCG (Western Cape Government). 2012. Standard for an infrastructure delivery management system. Western Cape Provincial Treasury. [Online]. Available at: <https://www.westerncape.gov.za/other/2012/47wc_standard_for_an_infrastructure.pdf> [Accessed: 16 February 2021]        [ Links ]

WEF (World Economic Forum and PwC). 2012. Strategic infrastructure steps to prioritize and deliver infrastructure effectively and efficiently. Report. World Economic Forum, Geneva, Switzerland.         [ Links ]

Wethal, U. 2019. Building Africa's infrastructure: Reinstating history in infrastructure debates. Forum for Development Studies, 46(3), pp. 473-499. https://doi.org/10.1080/08039410.2019.1616609        [ Links ]

Willis, C.J. & Rankin J.E. 2010. Measuring the maturity of Guyana's construction industry using the Construction Industry Macro Maturity Model (CIM3). Journal of Construction in Developing Countries, 15(2), pp. 87-116.         [ Links ]

Winch, G.M. & Leiringer, R. 2016. Owner project capabilities for infrastructure development: A review and development of the "strong owner" concept. International Journal of Project Management, 34(2), pp. 271-281. https://doi.org/10.1016/j.ijproman.2015.02.002        [ Links ]

Yukl, G. 2009. Leadership and organizational learning: An evaluative essay. Leadership Quarterly, vol. 20, pp. 49-53. https://doi.org/10.1016/j.leaqua.2008.11.006        [ Links ]

Zolfaghari, M., Kabiri, M. & Saadatmanesh, H. 2020. Impact of socioeconomic infrastructure investments on income inequality in Iran. Journal of Policy Modeling, 42(5), pp. 1146-1168. https://doi.org/10.1016/j.jpolmod.2020.02.004        [ Links ]

 

 

DECLARATION: The author(s) declared no potential conflicts of interest with respect to the research, authorship, and/or publication of this article

Creative Commons License All the contents of this journal, except where otherwise noted, is licensed under a Creative Commons Attribution License