Acta Structilia

On-line version ISSN 2415-0487
Print version ISSN 1023-0564

Acta structilia (Online) vol.26 n.1 Bloemfontein  2019

http://dx.doi.org/10.18820/24150487/as26i1.4 

REVIEW ARTICLES

 

The implementation of alternative dispute-resolution methods by architectural practitioners in South Africa

 

 

Tariené GaumI; Jacques LaubscherII

IMrs. Tariené Gaum, Part-time Lecturer, Department of Architecture, Tshwane University of Technology, No 201 Fairfield, 1164 Dormer Avenue, Queenswood, South Africa. Phone: + 27 63 695 4584, email: <wilcockst@tut.ac.za> ORCID: https://orcid.org/0000-0003-3328-9026
IIProf. Jacques Laubscher, Head of Department, Department of Architecture, Tshwane University of Technology, PO Box 95469, Waterkloof, 0145, South Africa. Phone: + 27 12 382 5252, email: <laubscherj@tut.ac.za> ORCID: https://orcid.org/0000-0002-2086-7563

 

 


ABSTRACT

Disputes within the built environment are usually diverse, with their complexity often depending on the number of role players and difficulty of the construction project. Disputes can be resolved through litigation, but this is often costly and time consuming. A study in 2012 reveals that, among others, arbitration, mediation, negotiation and adjudication are different forms of Alternative Dispute-Resolution (ADR) methods preferred and used to resolve disputes in the built environment. This article offers insight into the current preference and application of ADR methods by architectural practitioners in the South African built environment. Registered persons, as defined by the South African Council for the Architectural Profession (SACAP), formed the population of this study. According to SACAP, a registered person is defined as a person who is registered in one of the categories of professionals and/or candidates. The study will refer to architectural practitioners as a collective population group. A questionnaire survey was distributed to 13 622 registered SACAP professionals and candidates to determine the implementation of ADR methods. This questionnaire was distrusted by the Chief Operations Officer, Mrs Barbara van Stade to the aforementioned SACAP database. The survey response amounted to 396 participating architectural practitioners, resulting in 2.91% of registered architectural professionals and candidates in the South African built environment. Consequently, this is the most comprehensive study on the preferred use of ADR methods by architectural practitioners in the built environment of South Africa. This study specifically focuses on architectural practitioners who have been involved in settling disputes between the period of 2012 to 2016. The findings reveal a shifting preference in ADR methods used since what the previous study found in 2012. Although previous studies indicate adjudication as the preferred method to resolve disputes, the data reveals that architectural practitioners increasingly make use of negotiation, followed by mediation and then arbitration. This study identifies current ADR trends, and provides a perspective on the future development of ADR mechanisms for architectural professionals in the South African built environment.

Keywords: Alternative dispute resolution (ADR), architectural practitioners, built environment, South African Council for the Architectural Profession (SACAP)


ABSTRAK

Dispute in die konstruksiebedryf is oor die algemeen uiteenlopend en die kompleksiteit daarvan is gewoonlik afhanklik van die aantal rolspelers en moeilikheidsgraad van die konstruksieprojek. Geskille kan soms opgelos word deur litigasie, maar dit is dikwels duur sowel as tydrowend. 'n Studie in 2012 onthul dat arbitrasie, bemiddeling, onderhandeling en beoordeling onder meer verskillende vorme van alternatiewe geskilbeslegting (ADR) metodes is wat verkies en gebruik word om geskille in die konstruksiebedryf op te los. Hierdie studie bied insig tot die huidige voorkeur en implementering van ADR-metodes soos toegepas deur argitektuurpraktisyns in die Suid-Afrikaanse boubedryf. Geregistreerde persone, soos beskryf deur die Suid-Afrikaanse Raad vir die Argitektuurprofessie (SACAP), het die bevolking van die studie gevorm. Volgens SACAP word 'n geregistreerde persoon gedefinieer as iemand wat geregistreer is in een van die kategorieë van professionele mense en/of kandidate. 'n Vraelys is versprei na 13 622 geregistreerde SACAP professionele mense en kandidate om die huidige implementering van ADR-metodes te bepaal. Hierdie vraelys is uitgestuur deur die hoofbedryfsbeampte, Mev Barbara van Stade, aan die voorgenoemde SACAP-databasis. Die vraelys is volledig voltooi deur 396 argitektuurpraktisyns en verteenwoordig dus 2.91% van geregistreerde professionele mense en kandidate in die Suid-Afrikaanse boubedryf. Hierdie is die mees omvattende studie oor die voorkeur en implementering van ADR-metodes soos gebruik deur argitektuurpraktisyns in die bouomgewing van Suid-Afrika. Hierdie artikel fokus spesifiek op argitektuurpraktisyns in die boukunde wat vanaf 2012 tot 2016 by geskilbeslegtigingprosedures betrokke was. Die waarnemings dui op 'n verskuiwing van voorkeur rakende ADR-metodes sedert die vorige studie se gepubliseerde navorsingsresultate in die gebruik daarvan in 2012. Alhoewel vorige studies onthul dat beoordeling as die mees gekose metode gebruik is, toon die huidige resultate van die studie 'n toenemende gebruik in onderhandeling, gevolg deur bemiddeling/ mediasie en dan arbitrasie. Hierdie studie identifiseer huidige ADR-tendense en bied 'n perspektief op die toekomstige ontwikkeling van ADR-meganismes vir argitektuurpraktisyns in die Suid-Afrikaanse konstruksie-industrie.

Sleutelwoorde: Alternatiewe geskilbeslegtingprosedure (ADR), argitektuur-praktisyns, Suid-Afrikaanse Raad vir die Argitektuurprofessie (SACAP)


 

 

1. Introduction

According to Statistics South Africa (2018), the South African construction industry has recorded a negative growth since 2016, losing approximately R1.7 billion in value.

In countries facing difficult economic times, the built environment often experiences an increase in risk and liability issues, leading to regular dispute occurrences (El-Adaway & Kandil, 2009: 819; Loosemore, 2009: 95; Soo & Lam, 2012: 115). Annual reports from major South African construction companies indicate that losses are mainly attributed to disputes and the poor economic status of a country (Group Five, 2013; Murray & Roberts, 2013; WBHO, 2013).

Several studies have been conducted on the complex nature of the South African construction industry and the number of role players contributing to disputes arising from contracts (Povey, 2005; Povey, Cattell & Michell, 2006; Verster, 2006; Verster & Van Zyl, 2007; Maritz, 2007; 2009; Van Zyl, Verster & Ramabodu, 2010; Bvumbwe & Thwala, 2011; Maiketso & Marife, 2012; Du Preez & Verster, 2012; 2013; Powell & Nielsen, 2013; Sithole, 2016; Balogun, Anzari & Thwala, 2017). Studies on effective dispute resolution include and discuss the different mechanisms and procedures that assist in resolving disputes (Powell & Nielsen, 2013; Sithole, 2016; Balogun et al., 2017). Available alternative dispute-resolution (ADR) mechanisms used to resolve disputes include arbitration, mediation, adjudication, negotiation, fact-finding, mini-trials, conciliation, neutral evaluation, and expert determination (Bunni, 2000: 105; McCreary, Gamman & Brooks, 2001: 329; Seifert, 2005: 149; Gebken & Gibson, 2006: 264). Despite the fact that ADR mechanisms and processes specifically designed to assist both parties in dispute settlement exist in the South African construction industry (Butler & Finsen, 1993), the rate at which disputes occur in the architectural environment is unclear (De Oliveira, 2012: 80; Wilcocks, 2016).

From the literature it is also unknown which ADR methods are currently preferred by South African architectural practitioners. It is against this background that this study was initiated to identify the preferred application of ADR as indicated by architectural practitioners in the built environment of South Africa. To achieve this aim, the study set out two objectives, namely to identify how many architectural practitioners have recently been involved in the process of dispute resolution, and to determine which ADR method/s do architectural practitioners prefer to implement when faced with these disputes. Identifying such methods and their specific benefits will assist practitioners in ensuring that proper decision-making processes are put in place to deal with disputes, in future building projects.

 

2. Literature review

In order to understand the use of ADR methods in the South African built environment, it is important to introduce the current theory on the various ADR concepts included in this study. The existing theory focuses on the general description of ADR mechanisms, goals, advantages and disadvantages, the general application of ADR in the South African built environment, causes of disputes, and dispute methods commonly used in the South African built environment.

2.1 ADR concept, mechanisms and main goal

The majority of ADR practitioners prefer the acronym ADR to refer to appropriate/amicable dispute-resolution methods (Goldsmith, Pointon & Ingen-Housz, 2006: 7). According to the Collins Dictionary of Law (Stewart, 2006: 22), "Alternative Dispute Resolution (ADR) is used to resolve disputes through means other than by approaching the ordinary courts". For the purpose of this study, ADR is defined as a legal method that allows for the resolution of a conflict and/or dispute through a process that is tailored for the particular form of conflict and/or dispute.

The main goal of ADR is to provide a wide range of mechanisms/ procedures that are appropriate to all parties, in order to resolve disputes effectively without the use of litigation (Finsen, 2005: 221-222; Du Preez, Berry & Oosthuizen, 2010: 164). These mechanisms/ procedures include agent resolution, ombudsman, adjudication, conciliation, negotiation, mediation, and arbitration (Pretorius, 1993: 3; Finsen, 2005: 32; Verster & Van Zyl, 2007: 3; Verster, Ramabodu & Van Zyl, 2013; Wiese, 2016).

2.2 Advantages and disadvantages of ADR

Studies on the advantages and disadvantages of ADR mechanisms/ procedures identified various positive and negative attributes that might become specific to a particular case or situation (Finsen, 2005: 221-222; Goldsmith et al., 2006: 15-16; Victorian Law Reform Commission, 2008: 207-208; Ramsden, 2009: 1; Reynolds, 2010: 77; Sorsa, 2011: 88; WIPO, 2012: 5). Table 1 shows a summary of the positive and negative attributes of ADR.

 

 

2.3 ADR in the South African built environment

Although ADR is extensively used and developed internationally, the built environment of South Africa was introduced to the process of ADR with Quail (1978: 165), establishing the introduction of the mediation process in 1976. Since the late 1980s, standard forms of ADR have evolved, each with their own characteristics, as a result of a search for quicker and cheaper alternatives to litigation (Chong & Zin, 2012: 433). Some of these procedures are negotiation, conciliation, mediation, arbitration, adjudication, mini-trial, private judging, summary jury trial, early neutral evaluation, last offer arbitration and mediation, and last offer arbitration (Sithole, 2016: 36). Some of the methods are institutionalised in the Dispute Resolution Boards (DRBs) (Fenn, Lowe & Speck, 1997: 514), Dispute-Review Boards and Dispute Adjudication Boards (DAB) (Bunni, 2000; Seifert, 2005), among others (Steen, 1994; CRCCI, 2007; Ehrlich, 2012: online).

The built environment of South Africa makes provision for ADR methods in a variety of contracts. These include, among many others, the Joint Building Contracts Committee Principal Building Agreement (JBCC PBA) (2018), the General Conditions of Contract for Construction Works (GCC) (2015), International Federation of Consulting Engineers (FIDIC) (2017), the Professional Client/Consultant Services Agreement Committee (PROCSA) (2017), and the South African Institute of Architects Client-Architect Agreement (SAIA CAA) (2008). It is necessary to understand that new procedures and methods are vital to expand the fast-track nature of the construction industry. The development and implementation of ADR methods often increase with accelerated rates of construction, design and procurement documents (Finsen, 2005: 214-216). Finsen (2005: 216) and Verster (2006: 17) argue that ADR is an essential part of the management of construction projects playing a fundamental role in the successful completion of complex projects. According to Povey (2005: 2), the facilitator of the ADR process could be a practising professional with the necessary experience, or a retired industry professional. Facilitators must be registered with the Association of Arbitrators (AOA: 2014).

2.4 Cause of disputes within the South African built environment

Disputes arising within the built environment are usually diverse in nature because of the complexity of the construction industry (Bvumbe & Thwala, 2011: 32; Thumbiran, 2015: 1). The underlying cause of disputes between the client and the contractor is that contracting parties attempt to protect their own interest (Iwamatsu, Akiyama & Endo, 2008: 119). While clients seek to minimize construction costs, contractors aim to maximise their profits (Iwamatsu et al., 2008: 119; Powell & Nielsen, 2013). Different studies confirm the various interconnecting factors contributing to a dispute (CRCCI, 2007; Reid & Ellis, 2007; Murdoch & Hughes, 2008; Bvumbwe & Thwala, 2011: 35; Sithole, 2016: 25). Sithole (2016: 25) summarises the causes of disputes in construction contracts as:

Contractual issues - e.g. improperly or poorly drafted contracts

Management issues - e.g. poor management of time, targets, tendering, procedures

Design issues - e.g. change in design, scope, conditions, poor quality, errors, delays

Communication issues - e.g. poor communication from client and contractor, unclear site instructions, lack of information, unavailability of information

Quality issues - e.g. non-performance, defects, poor quality, control, and assurance

Payment issues - e.g. non-payment, delayed payments, claims

Human issues - e.g. conflicting cultural backgrounds, stress, behaviour, personalities, misunderstandings

External issues - e.g. project uncertainty, skills shortage, labour unrest, economic environment.

2.5 Dispute methods commonly used in the South African built environment

A study conducted by Van Zyl, Verster and Ramabodu (2010: 521) revealed that negotiation, conciliation, mediation, adjudication and arbitration are the most preferred ADR methods used in the built environment of South Africa. These methods can be divided into two main types of ADR, namely adjudicative and non-adjudicative. Table 2 illustrates the categories of ADR methods under adjudicative and non-adjudicative.

 

 

Although there are many different methods/procedures of ADR, Figure 1 shows a summary of the most common methods used in the South African built environment.

 

 

Once there is a better understanding of ADR and the benefits that it offers, the built environment can be positively adjusted and equipped for the settlement of disputes.

 

3. Research methodology

The purpose of this research was to identify the preferred application of ADR as indicated by architectural practitioners in the built environment of South Africa, with the specific focus on practitioners that have been involved with dispute settlements between 2012 and 2016. The study used a quantitative research approach which allows for the use of structured questionnaire surveys, enabling researchers to generalise their findings from a sample of a population (Courtright 2007: 273; Boubala 2010: 55; Edwards & Holt, 2010: 25-41; Hallowell, 2010: 27; Kheni, Gibb & Dainty, 2010: 1107; Creswell, 2014).

The survey tested the personal experience of architectural practitioners regarding their involvement with dispute resolution over the past five years (2012-2016) and identified the preferred ADR methods implemented by participating architectural practitioners. A quantitative research approach supports the use of dichotomous questions and checkboxes to measure data (Mathers, Fox & Hunn, 2009: 20). Quantitative research also allows for the use of descriptive statistics to analyse data (Brown, 2011: 11). Several data-analysis strategies are available. For this study, however, the frequencies were used to calculate percentages of preferences (Williams, 2007: 67; Bhattacharyya & Johnson, 2014).

3.1 Sampling method, population and response rate

A list of 13 622 architectural professionals and/or candidates, registered in South Africa, was obtained from the official body, The South African Council for the Architectural Profession (SACAP) (2015: 27) (Van Stade & Chiunda, 2016). Without placing any limitations, the questionnaire survey was administered to all 13 622 members. Responses from 396 participating architectural practitioners were received. The 396 participants represent 2.91% of registered SACAP members in South Africa. Krejcie & Morgan (1970: 608) state that a sample size of 370 is valid for a population of 15 000 for general research activities in the construction-related profession.

Statistician, Steffens (2017) also clarified that a response rate of less than 5% is not unusual in studies with a population this size. Steffens (2017) further stated that the response rate is acceptable to represent the respondents' views and opinions. These statements support the validity for a sampling size of 396 out of 13 622 architectural practitioners.

3.2 Data collection

An online-created structured questionnaire survey (SurveyMonkey, 2016) was distributed to the 13 622 participants by sharing the questionnaire link through e-mail.

The online survey was anonymous, allowing participants to feel comfortable and answer the questions truthfully. The need for a second data-collection method was recognised and made available in hardcopy format to practitioners who found the online survey method impractical, or who did not have electronic access. In an attempt to reach as wide as possible an audience, the hardcopies were distributed at relevant architectural conferences.

Topics on the preferred choice of ADR methods implemented by architectural practitioners were extracted from reviews of the literature and resulted in a two-section questionnaire. Section A requested information on the respondent's profile to obtain personal information on the category of SACAP registration, gender, educational background, and age. Section B established the involvement of architectural practitioners with dispute resolution over the past five years and investigated the preferred ADR methods implemented by architectural practitioners. In section B, the respondents were required to indicate their level of involvement, in practice, with ADR and ADR methods. The data from these measurements were tabulated. To reduce the respondent's bias, fixed closed-ended questions were preferred for Sections B of the questionnaire (Vicente & Reis, 2010: 260).

3.3 Data analysis and interpretation of findings

Microsoft Excel® (Microsoft Office® suite 2007) was used to determine the preferred ADR methods, using descriptive statistics (Bhattacharyya & Johnson, 2014).

For the questionnaire survey, Section A used dichotomous questions and checkboxes to obtain the respondents' personal information. In Section B, respondents answered a dichotomous question to determine their involvement with ADR and used the checkbox option to indicate their preferred ADR method. After tabulation of the data responses, a bar-chart presentation was compiled to show the calculated frequencies and percentages of the findings. These results form the data that was used to compare the 2012 study to the 2016 data in order to observe the change in preference of ADR methods used by architectural practitioners against ADR methods preferred by the built environment in 2012.

 

4. Findings

4.1 Respondents' profile

The first part of the questionnaire contained questions relative to the profile of the respondents, the people in the best position to indicate the current status of ADR in the architectural practice. Table 3 shows the category of SACAP registration of the respondents. It is obvious that the majority (39.7%) of the respondents were professional architects, male (69.9%), and had either a Master's degree (31.2%) or a Baccalaureus degree (33.2%); 35.8% of the respondents were aged between 25 and 35 years.

 

 

4.2 Involvement with ADR

The second part of the questionnaire first asked participants if they have recently been involved with dispute resolution. Figure 2 is a graphical summary indicating the percentage of architectural practitioners who have been involved in dispute settlements between 2012 and 2016.

 

 

The study revealed that the majority (63%) of the respondents have not been involved with dispute resolution. Only 37% of the respondents have been involved in some form of dispute resolution between 2012 and 2016. The researcher is of the opinion that a large number of architectural practitioners have not been involved with dispute resolution, due to their lack of knowledge on appropriate ADR methods and the benefits it could have. This statement is supported by a previous study conducted by Wilcocks (2016: 93), indicating that there is a strong link between the respondents' level of knowledge and their involvement in dispute resolution. The study proved that 70.9% of the respondents, who have hardly any or no knowledge regarding ADR, have not been involved with dispute resolution between 2012 and 2016.

Wilcocks' (2016: 45) study also indicated that only 39.3% of the architectural practitioners are familiar with ADR. This suggests that the majority of practitioners in the built environment do not have appropriate knowledge on this topic. Among other reasons, this could serve as an explanation as to why the majority (63%) of the participants have not been exposed to ADR mechanisms and its benefits.

4.3 Preference of ADR methods

The second part of the questionnaire asked which method(s) were preferred by architectural practitioners who have implemented ADR in an attempt to resolve a dispute. Figure 3 is a graphical summary of the ADR methods implemented by architectural practitioners between 2012 and 2016.

 

 

The majority of the participating architectural practitioners preferred negotiation (37.3%) and mediation (26.5%) as the means of resolving disputes in the South African butt environmei^it. Only 14.9% of trie respondents prefer arbitration and 8.2% prefer adjudication. The data revealed that, although litigation does not form part of ADR procedures, it is still implemented by 11.9% of the practitioners.

Negotiation is one of the most commonly used ADR mettods for resolvin g disputes, because iï is an informal method friat is used as a preventative measure to avoid fully flecdged disputes between parties (Chong & Zin, 2012: 430). Research also indicates that pattiesi who have been involved with disputesi favour mediation or neeotiation as a method of ADR (Brand, Steadman & Toedd, 2012; Rao, 2009:320).

Usin g a population size of 45 participants, a similar study for the built environment done in 2012j by du Preez and Verster (2013: 5) lists the preferred ADR methods as arbitration, adjudication, negotiation, and mediation. A comparison between the preferences of ADR methods in 2012 with the results of this study shows a change from arbitration (20.2%) and adjudication (19.3%) to negotiation (37.3%) and mediation (26.5%). Figure 4 shows a graphic representation comparing the current preference of ADR methods implemented by architectural practitioners to those in the built environment noted in the 2012 study by Du Preez and Verster.

 

 

This comparison displays tine ever-changing nature and implementation of various ADR methods within trie built environme nr of South Africa. Although Du Preez and Verster (2013: 5) argue that the construction industry is changing towards the implementation of adjudicahon as a preferred meRhod for resolving disputes, the comparative data covering the five years from 2012 to 2016 indicated a diffetent scenario. In 2012, Figure 4 sSows negotiation, also known as agent resolution, ranking as the third preferred method of ADR in the built environment while it became the most preferred ADR method implemented between 2y12 and 2016 by architectural practitioners. In 2d 12, mediation was the least preferred ADR method in the bu ilt environ ment, b0t between 201R and 2201 6, it has been the second most preterred ADR nsethod imple mented by/ architectural practitioners.

Negotiation is a private, voluntary and consensual process whereby parties attempt to resolve their differences personally by agreement without the intervention of an independent third party (Havenga & Havenga, 2010: 286; Ramsden, 2009: 2), while mediation is an ADR method in which a neutral third party, known as the mediator, seeks to resolve a dispute between the parties in conflict (Chong & Zin, 2012: 430).

The benefits of using negotiation is that both the discussion and the outcome can remain confidential (Havenga & Havenga, 2010: 286). The benefit of using mediation is that the parties are in agreement and willing to assist the mediator and mediation proceedings in reaching a settlement (Ramsden, 2009: 3; Chong & Zin, 2012: 430).

Despite its confidential benefit, negotiation is the simplest way of settling disputes, because the parties control the process and the outcome; the parties themselves are in the best position to know the strengths and weaknesses of their own cases (Wang, 2000: 191). The outcome of a case through mediation can result in the immediate resolution of the dispute, if the parties agree based on their interests and needs (LawTeacher, 2013: online). Because arbitration takes decision-making power away from the parties, parties do not learn how to resolve their own conflicts more effectively in the future, as does mediation (LawTeacher, 2013: online). Adjudication procedures have a 28-day timetable, which means that parties involved can lose considerable sums of money in a very short timescale (Expert Evidence, 2017: online).

This might be the reason for the change in ADR preferences, as more architectural practitioners are familiarising themselves with the process of ADR, and trying to avoid any formal court litigation.

 

5. Discussion and conclusion

Based on the findings of this study, it was concluded that architectural practitioners in the built environment in South Africa who were involved with ADR between 2012 and 2016 preferred to use negotiation and mediation as methods to resolve disputes.

A literature study reveals that available ADR mechanisms used to resolve disputes include arbitration, mediation, adjudication, negotiation, fact-finding, mini-trials, conciliation, neutral evaluation, and expert determination. Some benefits of using ADR methods include time and cost efficient, active participation of parties, confidential, and no courtrooms. Despite the benefits, some ADR methods may not be suitable to every form of dispute.

Although arbitration and adjudication were known in 2012 as the most preferred ADR methods to resolve construction disputes, architectural practitioners preferred negotiation and mediation in 2016. This points to the evolutionary challenges of ADR in the South African built environment. A study by Du Preez and Verster (2013: 5) suggests that arbitration and adjudication will remain profound as a support system to ADR.

 

6. Recommendations

It is recommended that architectural practitioners keep track of the continuous development of ADR methods. Depending on the circumstances of specific construction disputes, architectural practitioners should study the different types of ADR processes, methods and procedures, as ADR has a variety of attributes. These include, among others, avoiding formal court litigation, flexibility, cost effectiveness, time-saving, confidentiality, privacy, and the preservation of business relationships.

To limit the current lack of ADR knowledge, architectural practitioners should develop ADR implementation guidelines for their firms that focus on choice, procedure and methods best dealing with the interest of the parties involved in the dispute. These implementation guidelines should specifically focus on serving as a mechanism for avoiding formal court litigation.

It is recommended that SACAP and Voluntary Associations educate members through online training, continuing professional development (CPD) and bespoke ADR courses, mentorship programmes and workshops. This should be done on a regular basis, as ADR methods/procedures implemented are constantly changing, due to the changing nature of the South African construction industry.

Further studies should investigate possible activities to inform architectural practitioners of the benefits of ADR. This will ensure good working relationships between practitioners and clients as well as possibly limiting costly and time-consuming court procedures. Similar studies could also examine the possible impact when ADR methods are not implemented during construction disputes and how to address these issues. Thus, the study could be expanded by including the rest of the construction industry.

 

References

AOA (Association of Arbitrators). 2014. Becoming an arbitrator. [Online]. Available at: <http://www.arbitrators.co.za/membership/> [Accessed: 24 October 2018].         [ Links ]

Balogun, O.A., Anzari, N. & Thwala, W.D. 2017. Adjudication and arbitration as a technique in resolving construction industry disputes: A literature review. In: Proceedings of the Sixth International Conference on Advances in Civil, Structural and Environmental Engineering - ACSEE 2017.         [ Links ]

Bhattacharyya, G.K. & Johnson, R.A. 2014. Statistics: Principles and methods, 7th edition. DHoboken, NJ: John Wiley & Sons.         [ Links ]

Boubala, H.G.O. 2010. Risk management of SMMEs. Unpublished MTech thesis. Cape Town: Cape Peninsula University of Technology.         [ Links ]

Brand, J., Steadman, F. & Todd, C. 2012. Commercial mediation. A user's guide. Cape Town: Juta.         [ Links ]

Brown, J.D. 2011. Quantitative research in second language studies. In Hinkel, E. (Ed.). Handbook of research in second language teaching andlLearning. (Vol. 2). New York: Routledge.         [ Links ]

Bunni, N.G. 2000. Recent developments in construction disputology. Journal of International Arbitration, 17(4), pp. 105-115.         [ Links ]

Butler, D. & Finsen, E. 1993. Arbitration in South Africa: Law and practice. Cape Town: Juta.         [ Links ]

Bvumbwe, C. & Thwala, D.W. 2011. An exploratory study of dispute resolution methods in the South African construction industry, IPEDR, Vol. 21. Singapore: LACSIT Press.         [ Links ]

Chong, H. & Zin, R.M. 2012. Selection of dispute resolution methods: Factor analysis approach. Engineering, Construction and Architectural Management, 19(4), pp. 428-443. https://doi.org/10.1108/09699981211237120        [ Links ]

Courtright, C. 2007. Context in information behavior research. Annual Review of Information Science and Technology, 41(1), pp. 273-306. https://doi.org/10.1002/aris.2007.1440410113        [ Links ]

CRCCI (Cooperative Research Centre for onstruction Innovation). 2007. Dispute avoidance and resolution: A literature review (Report No. 1:2007-006-ep). Brisbane. [Online]. Available at: <http://www.constructioninnovation.info/images/pdfs/Literature_Review.pdf> [Accessed: 16 October 2018].         [ Links ]

Creswell, J.W. 2014. Research design: Qualitative, quantitative and mixed-methods approaches. 4th edition. Thousand Oaks, CA: Sage.         [ Links ]

De Oliveira, M. 2012. Dispute resolution under the general conditions of contract 2010. Potchefstroom: North-West University.         [ Links ]

Du Preez, O., Berrry, F.H. & Oosthuizen, P. 2010. Mediation and conciliation as methods of Alternate Dispute Resolution (ADR) in the construction industry. In: Proceedings of the 5thBuilt Environment Conference, 18-20 July, Durban, South Africa, pp. 162-177.         [ Links ]

Du Preez, O. & Verster, J.J.P. 2012. Alternate dispute resolution preferences: Conflict, claims and confusion. In: Michell, K., Bowen, P.A. & Cattell, K. (Eds). Proceedings of the joint CIB W070, W092 & TG72 international Conference, Cape Town, 23-25 January. Cape Town, UCT: Department of Construction Economics and Management, pp. 73-80.         [ Links ]

Du Preez, O. & Verster, J.J.P. 2013. ADR practice in the construction industry: A futuristic perspective. In: Proceedings of the CIB World Building Congress, Brisbane, Australia, 5-9 May 2013, under the responsibility of Working Commission W113 - Law and Dispute Resolution, pp. 19-30 [Online]. Available at: <http://site.cibworld.nl/dl/publications/pub_390.pdf> [Accessed: 19 September 2018].         [ Links ]

Edwards, D.J. & Holt, G.D. 2010. The case for '3D triangulation' when applied to construction management research. Construction Innovation, 10(1), pp. 25-41. https://doi.org/10.1108/14714171011018292        [ Links ]

Ehrlich, D. 2012. A guide to using Dispute Adjudication Board. Johannesburg. Sonnenbergs. [online]. Available at: <https://www.ensafrica.com/news/a-guide-to-using-a-dispute-adjudication-board?Id=577&STitle=construction%20ENSight> [Accessed: 27 August 2018].         [ Links ]

El-Adaway, I.H. & Kandil, A.A. 2009. Contractors' claims insurance: A risk retention approach. Journal of Construction Engineering and Management, 135(9), pp. 819-825. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000033        [ Links ]

Expert Evidence. 2017. Adjudication advantages and disadvantages. [online]. Available at: <http://expert-evidence.com/adjudication-advantages-and-disadvantages/Adjudication-disadvantages> [Accessed: 4 March 2019].         [ Links ]

Fenn, P., Lowe, D. & Speck, C. 1997. Conflict and dispute in construction. Construction Management and Economics, 15(6), pp. 513-518. https://doi.org/10.1080/014461997372719        [ Links ]

FIDIC (International Federation of Consulting Engineers). 2017. General conditions of contract for construction. 2nd edition (Red Book). Geneva: SAICE.         [ Links ]

Finsen, E. 2005. The building contract: A commentary on the JBCC Agreements. 2nd edition. Cape Town: Juta.         [ Links ]

Gebken, R.J. & Gibson, G.E. 2006. Quantification of costs for dispute resolution procedures in the construction industry. Journal of Professional Issues in Engineering Education and Practice, 132(3). pp. 264-271. https://doi.org/10.1061/(ASCE)1052-3928(2006)132:3(264)        [ Links ]

Goldsmith, J., Pointon G. & Ingen-Housz, A. 2006. ADR in business: Practice and issues across countries and cultures. The Netherlands: Kluwer Law International, p. 7.         [ Links ]

Group Five. 2013. Integrated Annual Report-2013, Johannesburg: Group Five. [Online]. Available at: <http://www.g5.co.za/reports/ar_2013/pdf/Group-Five-2013-supplementary-information.pdf> [Accessed: 19 September 2018].         [ Links ]

Hallowell, M. 2010. Cost-effectiveness of construction safety programme elements. Construction Management and Economics, 28(1), pp. 25-34. https://doi.org/10.1080/01446190903460706        [ Links ]

Havenga, P. & Havenga, M. 2010. General principles of commercial law. 7th edition. South Africa: Juta.         [ Links ]

Iwamatsu, J., Akiyama, T. & Endo, K. 2008. Construction claims and disputes and the business culture of construction in Japan. Journal of Professional Issues in Engineering Education and Practice, 134(1), pp. 119-127. https://doi.org/10.1061/(ASCE)1052-3928(2008)134:1(119)        [ Links ]

JBCC (Joint Building Contracts Committee). 2018. Principal Building Agreement: JBCC, Ed 6.2, May 2018. Johannesburg: JBCC.         [ Links ]

Kheni, N.A., Gibb, A.G.F. & Dainty, A.R.J. 2010. Health and safety management within small and medium-sized enterprises (SMEs) in developing countries: Study of contextual influences. Journal of Construction Engineering and Management, 136(10), pp. 1104-1115. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000218        [ Links ]

Krejcie, R.V. & Morgan, D.W. 1970. Determining sample size for research activities. Educational and Psychological Measurement, 30(3), pp. 607-610. https://doi.org/10.1177/001316447003000308        [ Links ]

LawTeacher. November 2013. Advantages and disadvantages of mediation ADR. [online]. Available at: <https://www.lawteacher.net/free-law-essays/contract-law/advantages-and-disadvantages-of-mediation-adr-contract-law-essay.php?vref=1> [Accessed: 4 March 2019].         [ Links ]

Loosemore, D.J. 2009. Briefing: Challenges to ADR in the UK and internationally - A personal view. Proceedings of the Institution of Civil Engineers - Management, Procurement and Law, 162(3), pp. 95-96. https://doi.org/10.1680/mpal.2009.162.3.95        [ Links ]

Maiketso, N.C. & Maritz, M.J. 2012. Adjudication as an alternative dispute resolution method in the South African construction industry. Journal of the South African Institution of Civil Engineering, 54(2), pp. 65-70.         [ Links ]

Maritz, M.J. 2007. An investigation into the adjudication of disputes in the South African construction industry. In: Proceedings of the Royal Institute of Chartered Surveyors Conference, 6-7 September 2007, Atlanta, Georgia. Atlanta, GA: Institute of Technology, pp. 419-426.         [ Links ]

Maritz, M.J. 2009. Adjudication of disputes in the construction industry. Essays Innovate, 3(1), pp. 78-79.         [ Links ]

Mathers, N., Fox, N. & Hunn, A. 2009. Surveys and questionnaires. The NIHR RDS for the East Midlands/Yorkshire & the Humber.         [ Links ]

McCreary, S.T., Gamman, J.K. & Brooks, B. 2001. Refining and testing joint fact finding for environmental dispute resolution: Ten years of success. Mediation Quarterly, 18(4), pp. 329-348. https://doi.org/10.1002/crq.3890180403        [ Links ]

Murdoch, J. & Hughes, W. 2008. Construction contracts: Law and management. 4th edition. New York: Taylor and Francis.         [ Links ]

Murray & Roberts. 2013. Annual Integrated Report 2013. Murray & Roberts. [Online]. Available at: <http://www.murrob.com/pdflannual_reportslar_2013/2013-integrated-report.Pdf> [Accessed: 16 September 2018].         [ Links ]

Povey, A.L. 2005. An investigation into the mediation of disputes in the South African construction industry. Journal of the South African Institute of Civil Engineering, 47(1), pp. 2-7.         [ Links ]

Povey, A.L., Cattell, K.S. & Michell, K.A. 2006. Mediation practice in the South African construction industry. Acta Structilia, 13(1), pp. 44-64.         [ Links ]

Powell, M.R. & Nielsen, K.R. 2013. Special section on alternative dispute resolution for the engineering and construction industry - Part 1. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 5(1), p.1. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000108        [ Links ]

Pretorius, P. 1993. Dispute resolution. Cape Town: Juta.         [ Links ]

PROCSA (Professional Consultants Services Agreement Committee). 2017. Professional Client/Consultant Service Agreement, Ed. 4.0, October 2017. Pretoria: PROCSA.         [ Links ]

Quail, G.P. 1978. The building contract. Pretoria: Building Publications.         [ Links ]

Ramsden, P. 2009. Law of arbitration. Cape Town: Juta.         [ Links ]

Rao, P.C. 2009. Alternative to litigation in India. Edited by P.C. Rao and W. Seffield. New Delhi: Universal Law Publishing.         [ Links ]

Reid, A. & Ellis, R.C. 2007. Common sense applied to the definition of a dispute. Structural Survey, 25(3/4), pp. 239-252.         [ Links ]

Reynolds, M.P. 2010. Crossing the Rubicon. Construction Law Journal, 2. Oxford Brookes University: Keating Chambers.         [ Links ]

SACAP (South African Council for the Architectural Profession). 2015. Annual report 2014/2015. Johannesburg: SAIA.         [ Links ]

SAIA (The South African Institute of Architects). 2008. Client Architect Agreement 2008. Pretoria: SAIA.         [ Links ]

SAICE (South African Institution of Civil Engineering). 2015. General Conditions of Contract for Construction Works (GCC) (Simplified form). 3rd edition. Halfway House: SAICE.         [ Links ]

Seifert, B.M. 2005. International construction dispute adjudication under international federation of consulting engineers: Conditions of contract and the dispute adjudication board. Journal of Professional Issues in Engineering Education and Practice, 131(2), pp. 149-157. https://doi.org/10.1061/(ASCE)1052-3928(2005)131:2(149)        [ Links ]

Sithole, B.M. 2016. Sources of disputes in South African construction contracts and the resolution techniques employed between clients and contractors. M.Sc. thesis. Johannesburg: School of Construction Economics and Management, University of the Witwatersrand.         [ Links ]

Soo, G. & Lam, S. 2012. Essential body of legal knowledge. Proceedings of the Institution of Civil Engineers - Forensic Engineering, 165(3), pp. 115-121. https://doi.org/10.1680/feng.11.00030        [ Links ]

Sorsa, K. 2011. Proactive management and proactive business law: A handbook. Turker University of Applied Sciences Tampereen Yliopistopaino Oy. Tampere: Juvenes Print.         [ Links ]

Statistics South Africa. 2018. Economy disappoints in Q1 2018, contracting by 2.2%. Statistical Release P0441. 5 June. [Online]. Available at: <http://www.statssa.gov.za/?p=11202> [Accessed: 28 August 2018].         [ Links ]

Steen, J. 1994. Five steps to resolving construction disputes - without litigation. Journal of Management in Engineering, 10(4), pp. 19-21. https://doi.org/10.1061/(ASCE)9742-597X(1994)10:4(19)        [ Links ]

Steffens, F. 2017. (Retired Professor and statistician at the University of Pretoria). Personal communication on response rates. Pretoria. [8 November 2016].         [ Links ]

Stewart, W.J. 2006. Collins Dictionary of Law. [Online]. Available at: <http://legaldictionary.thefreedictionary.com/alternative+dispute+resolution> [Accessed: 22 August 2016].         [ Links ]

Surveymonkey. 2016. About us. [Online]. Available at: <https://www.surveymonkey.com/mp/aboutus/> [Accessed: 28 August 2018].         [ Links ]

Thumbiran, I. 2015 Summary: Prompt payment. Unpublished paper presented to adjudication delegates at the University of Pretoria.         [ Links ]

Van Stade, B. & Chiunda, M. 2016. (Chief operations managers at SACAP). Personal communication on the number of architectural professionals in South Africa. Pretoria. [3 November 2016].         [ Links ]

Van Zyl, C.H., Verster, J.J.P. & Ramabodu, M.S. 2010. Dispute resolution alternatives: Problems, preference and process. Paper delivered at the Construction, Building and Real Estate Research Conference (COBRA) of the Royal Institution of Chartered Surveyors (RICS), 2-3 September, Université Paris-Dauphine.         [ Links ]

Verster, J.J.P. 2006. Managing cost, contracts, communication and claims: A quantity surveying perspective on future opportunities. In: Proceedings of the 1st ICEC & IPMA Global Congress on Project Management, 5th World Congress on Cost Engineering, Project Management and Quantity Surveying, 23-26 April 2006, Ljubljana, Slovenia, CD ROM.         [ Links ]

Verster, J.J.P., Ramabodu, M.S. & Van Zyl, C.H. 2013. Problems, preferences and processes related to dispute resolution in construction in South Africa. International Journal of Project Organisation and Management, 5(1/2), pp. 127-144. https://doi.org/10.1504/IJPOM.2013.053158        [ Links ]

Verster, J.J.P. & Van Zyl, C.H. 2007. Managing differences and disputes: A search for an effective and efficient construction dispute resolution method. In: Proceedings of Pacfic Association of Quantity Surveyors (PAQS) 2007 Congress: Construction from a different perspective. Auckland, New Zealand, 9-13 June.         [ Links ]

Vicente, P. & Reis, E. 2010. Using questionnaire design to fight nonresponse bias in web surveys. Social Science Computer Review, 28(2), pp. 251-267. DOI: 10.1177/0894439309340751.         [ Links ]

Victorian Law Reform Commission. 2008. Civil Justice Review, Report No. 14. Australia: VLRC.         [ Links ]

Wang, M. 2000. Are alternative dispute methods superior to litigation in resolving disputes in international commerce? No. 2. Arbitration International. Chartered Institute of Arbitrators, p. 189.         [ Links ]

WBHO. 2013. Operational review: Building and civil engineering WBHO. [Online]. Available at: <http://wbho.investoreports.com/wbho_ar_2013/reviews/operational-review/> [Accessed: 16 September 2018].         [ Links ]

Wiese, T. 2016. Alternative dispute resolution in South Africa: Negotiation, mediation, arbitration and ombudsmen. Cape Town: Juta.         [ Links ]

Wilcocks, T. 2016. Investigating the use of alternative dispute resolution methods in the architectural profession of South Africa. Unpublished M.Tech. dissertation. Pretoria: Tshwane University of Technology. https://doi.org/10.18820/24150487/as24i2.6        [ Links ]

Williams, C. 2007. Research methods. Journal of Business and Economic Research, 5(3), pp. 65-72.         [ Links ]

WIPO (World Intellectual Property Organization). 2012. Efficient resolution of disputes in R&D collaborations, licensing and other technology transfer. [Online]. Available at: <http://www.wipo.int/export/sites/www/amc/en/docs/ipr20121127.pdf> [Accessed: 22 August 2016].         [ Links ]

 

 

Peer reviewed and revised February 2019
Published June 2019

 

 

* The authors declared no conflict of interest for the article or title

Creative Commons License All the contents of this journal, except where otherwise noted, is licensed under a Creative Commons Attribution License