SciELO - Scientific Electronic Library Online

 
vol.116 número3HPGR-FAQApplication of the Palla™ vibrating mill in ultra fine grinding circuits índice de autoresíndice de materiabúsqueda de artículos
Home Pagelista alfabética de revistas  

Servicios Personalizados

Articulo

Indicadores

Links relacionados

  • En proceso de indezaciónCitado por Google
  • En proceso de indezaciónSimilares en Google

Compartir


Journal of the Southern African Institute of Mining and Metallurgy

versión On-line ISSN 2411-9717
versión impresa ISSN 2225-6253

J. S. Afr. Inst. Min. Metall. vol.116 no.3 Johannesburg mar. 2016

 

Final breakthrough at the Hallandsâs tunnel marks an outstanding pioneering achievement

 

 

The unshakable will of clients, powerful construction companies, and innovative tunnelling technology make it possible to deal with even the greatest challenges in tunnel construction. This is demonstrated by the successful completion of tunnelling work at the Hallandsâs Tunnel in Sweden. At the beginning of September 2013, tunnelling on one of the world's most complex and, due to the geological conditions, the most challenging tunnel projects was completed. In the Hallandsâs Tunnel project, the Herrenknecht Multi-mode-TBM cut through the last metres of rock to the target shaft, and this second breakthrough marked a victory of the people and the innovative tunnelling technology involved against a particularly intractable mountain massif. After 8 years of unyielding tunnelling, this is a grand triumph for all those involved in the project. The mountain massif had previously proved to be invincible against other tunnel construction methods.

 

Bâstad, Sweden / Schwanau, Germany, September 23, 2013

The railway route along the Swedish west coast from Malmö to Göteborg is one of the vital arteries for the country's passenger and freight traffic. When expanding this route, the Hallandsâs mountain range south of Bâstad in Sweden was the decisive bottleneck, since it could be passed only in one-track operation until now. With the breakthrough of the Herrenknecht TBM, the shell of the twin-bore Hallandsâs Tunnel - which will increase capacity - was completed on 4 September 2013. Transport Minister Catharina Elmsãter-Svãrd, representatives from the construction companies, the Swedish Transport Administration Trafikverket, and from the local and national administrations, as well as numerous representatives from the media celebrated this outstanding project success. 'We have shown that it is possible to build a tunnel of high quality trough the complicated Hallandsâs, while at the same time meeting the high environmental requirements. Our competent and dedicated co-workers are today worthy of every recognition for our common achievement', said Per Rydberg, project manager of the Swedish Transport Administration at the breakthrough ceremony.

Due to its geology, the project occupies a top position on the list of tunnel projects with extremely complex ground conditions. Large sections of the very abrasive rock formations (mainly gneiss and amphibolite) with high rock strengths of up to 250 MPa are extremely fissured. In addition, the tunnel is exposed to extreme groundwater pressures of more than 10 bar on large parts of the route. Earlier attempts to construct a tunnel failed to pass this hurdle and led to strict environmental requirements that limited the quantity of groundwater (to the litre) allowed to drain during tunnel construction between Förslöv and Bâstad, for example.

For the mechanized tunnelling - which was the last resort to implement the project - Herrenknecht developed and delivered a specially adapted tunnel boring machine (TBM) for the two remaining 5.5 km long sections of the overall 8.7 km long Hallandsâs Tunnels. The high-tech colossal machine (Multi-mode TBM, 0 10 530 mm) was designed to work in both the closed slurry mode with hydraulic removal of excavated material and the open hard-rock mode with belt conveyor removal. Permanently installed drilling and injection tools ensured water inflow could be controlled by grout injection when needed. As part of comprehensive test series, the sealing system of the machine was designed to withstand a groundwater pressure of up to 13 bar. Werner Burger, Head of Design Department Traffic Tunnelling at Herrenknecht said: 'The machine design for Hallandsâs was both a response to the extreme project requirements and a large technological advance: the concept aimed to provide a hard-rock machine with the potential to work safely and efficiently in loose rock and even under high groundwater pressure if needed. Hallandsâs has set the right course for later projects.'

The Swedish-French joint venture between the companies Skanska and Vinci started tunnelling on the first (eastern) tunnel in September 2005. Tunnelling teams and engineers approached the optimum working method in the tunnel in close and trusting cooperation of machine supplier and construction companies. The best results were obtained with the machine named 'Ása' in the open mode with cement injections that kept the groundwater at bay. High abrasivity and blocky rock on parts of the route caused an extremely high wear of material at the cutter head, and the maintenance and tool change intervals were correspondinglyshort. However, soon after the start of tunnelling, site reports showed regular progress, although time-consuming cement grouting and the required service intervals meant limited speed. Nevertheless, man and machine were able to force some hundred metres of tunnel per month.

Then, spring 2008 saw the first victory of many with the breakthrough into the cavern of a mid-adit, which had been excavated with conventional methods. On that occasion the highly worn cutter head was replaced by a new one with larger disc cutters (19 inch instead of 17 inch). Finally, in August 2010 the entire first tunnel was successfully completed. The machine was completely refurbished and again equipped with a new cutter head for excavating the second (western) tunnel. The Herrenknecht Field Service rendered active assistance on the site with competent staff and the supply of spare and wear parts: they assisted in the assembly of the machine on the site, during tunnelling in both tunnels, and in the restructuring and refurbishment work for the second drive.

From February 2011 onwards, specialists from the Skanska-Vinci joint venture drove the machine from Förslöv towards Bâstad for the second tunnel, where they were welcomed and celebrated by a large and festive party at final breakthrough on 4 September 2013. Dr.-Ing. E.h. Martin Herrenknecht was present at this outstanding event: 'This breakthrough is an absolutely great moment in my life. A big success for all those involved. It is like the moon landing of tunnel construction. Nobody else has been here before us.' After almost 8 years of tunnelling this finish marked an outstandingly pioneering achievement in the construction of underground infrastructure. Thanks to state-of-the-art tunnelling technology and trusting cooperation of all project partners, even a tunnel project which seemed to be impossible could be managed safely for people and the environment.

 

 