SciELO - Scientific Electronic Library Online

 
vol.110 número5The plasma manufacturing of titania pigment and nano-titania in a pilot plant índice de autoresíndice de materiabúsqueda de artículos
Home Pagelista alfabética de revistas  

Servicios Personalizados

Articulo

Indicadores

Links relacionados

  • En proceso de indezaciónCitado por Google
  • En proceso de indezaciónSimilares en Google

Compartir


Journal of the Southern African Institute of Mining and Metallurgy

versión On-line ISSN 2411-9717
versión impresa ISSN 2225-6253

J. S. Afr. Inst. Min. Metall. vol.110 no.5 Johannesburg may. 2010

 

JOURNAL PAPER

 

Plan compliance process for underground coal mines

 

 

A.A. Angelov; K. Naidoo

University of Pretoria, South Africa

 

 


SYNOPSIS

This paper presents a unique method of monitoring the effectiveness of the planning process as well as the execution of mine plans. The method primarily determines the degree of deviation from the original mine plans by comparing actual mined areas to initially planned mining areas. The performance of mining operations is also measured by comparing actual and planned tonnages for a particular period. Once the degree of deviation from mine plans has been established the cause/s of the deviation can be determined through a simple fault tree analysis. Accurate identification of the reasons of deviation can aid the mine in selecting possible methods to correct the deviation. It is, however, beyond the scope of this paper to discuss the methods employed in correcting such deviations, as each mining operation will have unique causes of plan deviation and methods of remedying them. Deviations from the plan greatly affect the yields obtainable, which in turn affects the life of mine, thus having negative economic and financial implications. Accordingly, this paper presents a project management method which aims to reduce risk by improving planning systems to ensure optimum overall extraction of coal reserves.


 

 

“Full text available only in PDF format”

 

 

References

1. BRINSDEN, W.K. Spotlight on grade control. Fifth annual seminar of The Australian Institute of Geoscientists 'Strategies for Grade Control', Observation City, Scarborough, Perth, 15 November 1990. pp. 177-180.         [ Links ]

2. MOHRING, R.P. Keynote Address: Coal mining-the future. J. South Afr. Inst. Min & Metall, vol. 101, 2001. pp. 19-24.         [ Links ]

3. MORLEY, C. SNOWDEN, V., and DAY, D. Financial impact of resource/reserve uncertainty. J. South Afr. Inst. Min & Metall, vol. 99, 1999. pp. 293-301        [ Links ]

4. OSBORNE, V. Plan Compliance Measurement-Draft BMA Guideline. Internal consultant report for BHP Billiton Energy Coal South Africa. 2007        [ Links ]

5. SCOTT, A. BTRAK Guide: The BMA Way for Tracking and Reconciling Coal Recovery. Version 1. Internal consultant report for BHP Billiton Energy Coal South Africa. 2004.         [ Links ]

6. SMITH, G.L., PEARSON-TAYLOR, J., ANDERSEN, D.C., and MARSH, A.M. Project valuation, capital investment and strategic alignment-tools and techniques at Anglo Platinum. Second International Platinum Conference 'Platinum Surges Ahead', 8-12 October 2006. pp.67-74.         [ Links ]

7. STEFFEN, O.K.H. Planning of open pit mines on a risk basis. J. South Afr. Inst. Min & Metall, vol. 97, 1997. pp. 47-56.         [ Links ]

8. STEYNFAARD, D.J., LOUW, W.C., KOTZE, J., SMITH, J., and HAVENGA, B.H.J. New developments on mine planning and grade control at Sishen Iron Ore Mine. J. South Afr. Inst. Min & Metall, vol. 103, 2003. pp. 53-62.         [ Links ]

9. TERBRUGGE, P.J., WESSELOO, J., VENTER, J., and STEFFEN, O.K.H. A risk consequence approach to open pit slope design. J. South Afr. Inst. Min & Metall, vol. 106, 2006. pp. 503-511.         [ Links ]

 

 

Paper received Oct. 2008
Revised paper received Feb. 2010

Creative Commons License Todo el contenido de esta revista, excepto dónde está identificado, está bajo una Licencia Creative Commons