SciELO - Scientific Electronic Library Online

 
vol.109 issue7 author indexsubject indexarticles search
Home Pagealphabetic serial listing  

Services on Demand

Article

Indicators

Related links

  • On index processCited by Google
  • On index processSimilars in Google

Share


Journal of the Southern African Institute of Mining and Metallurgy

On-line version ISSN 2411-9717
Print version ISSN 2225-6253

J. S. Afr. Inst. Min. Metall. vol.109 n.7 Johannesburg Jul. 2009

 

TECHICAL NOTE

 

Optimization of shovel-truck system for surface mining

 

 

S.G. ErcelebiI; A. BascetinII

IIstanbul Technical University, Mining Engineering Department, Maslak, Istanbul, Turkey
IIIstanbul University, Engineering Faculty, Mining Engineering Department, Avc
ılar, Istanbul, Turkey

 

 


SYNOPSIS

In surface mining operations, truck haulage is the largest item in the operating costs, constituting 50 to 60% of the total. In order to reduce this cost, it is necessary to allocate and dispatch the trucks efficiently. This paper describes shovel and truck operation models and optimization approaches for the allocation and dispatching of trucks under various operating conditions. Closed queuing network theory is employed for the allocation of trucks and linear programming for the purpose of truck dispatching to shovels. A case study was applied for the Orhaneli Open Pit Coal Mine in Turkey. This approach would provide the capability of estimating system performance measures (mine throughput, mean number of trucks, mean waiting time, etc.) for planning purposes when the truck fleet is composed of identical trucks. A computational study is presented to show how choosing the optimum number of trucks and optimum dispatching policy affect the cost of moving material in a truckshovel system.

Keywords: Open pit mine, equipment selection, dispatching, linear programming, closed queuing network theory


 

 

“Full text available only in PDF format”

 

 

References

ALARIE, S. and GAMACHE, M. (2002), Overview of solution strategies used in truck dispatching systems for open pit mines, International Journal of Surface Mining, Reclamation and Environment, vol. 16, no. 1, 2002. pp. 59-76.         [ Links ]

BASCETIN, A. An Applıcatıon of the Analytic Hierarchy Process in Equipment Selection at Orhaneli Open Pit Coal Mine, Transactions of the Institutions of Mining and Metallurgy-(AusIMM), Section A-Mining Technology. vol. 113, no. 3, 2004. pp.192-199(8).         [ Links ]

BASCETIN, A. Investigation of Costs of an Open Pit Mine by the 3D-Modelling of Mine Basin, Scientific Research, Istanbul University Research Fund, 2002, Project No : 1607/30042001.2002.         [ Links ]

BARNES, R.J., KING, M.S., and JOHNSON, T.B. Probability Techniques for Analyzing Open Pit Production Systems, Application of Computers and Operations Research in the Mineral Industry (16th APCOM Symposium), 1978. pp. 462-476.         [ Links ]

CARMICHAEL, D.G. Shovel-truck queues: a reconciliation of theory and practice, Constr. Mgmt. And Economics, vol. 4, 1986. pp. 161-177.         [ Links ]

CARMICHAEL, D.G. Engineering Queues in Construction and Mining, Ellis Horwood Ltd., Toronto, Canada, 1987.         [ Links ]

ELBROND, J. Haulage system analysis. Queuing theory, Surface Mining, 1990. pp. 743-748.         [ Links ]

KOENIGSBERG, E. Twenty Five Years of Cyclic Queues and Closed Queue Networks, A Review, Journal of Operational Research Society, vol. 33, 1982. pp. 605-619.         [ Links ]

MUDULI, P.K. and YEGULALP, T.M. Modeling truck-shovel systems as closed queuing network with multiple job classes, International Transactions in Operational Research, vol. 3, no. 1, 1999. pp. 89-98.         [ Links ]

NEONEN, L.K., GRAEFE, P.W.U., and CHAN, A.W. Interactive computer model for truck/shovel operations in an open-pit mine, Winter Simulation Conference. Proceedings of the 13th conference on Winter simulation, Atlanta, Georgia, vol. 1, 1981. pp. 133-139.         [ Links ]

RAMANI, R.V. Haulage system simulation analysis in surface mining, SME publications, B.A. Kennedy, (ed.), 1990. p. 724-742.         [ Links ]

SABAH, A., KHALIL, M., and MOHAMED, A.A. Computer model for selecting equipment for earthmoving operations using queuing theory, Construction Informatics Digital Library available at: http://itc.scix.net paper w78-2003-1.content. 2003 .         [ Links ]

SGUREV, V., VASSILEV, V., DOKEV, N., GENOVA, K., DRANGAJOV, S., KORSEMOV, C., and ATANASSOV, A. An automated system for real-time control of the industrial truck haulage in open-pit mines, Institute of Industrial Cybernetics and Robotics, Sofia, Bulgaria, 2003. p. 1113.         [ Links ]

SHANGYAO, Y., WEISHEN, L., and MAONAN, C. Production scheduling and truck dispatching of ready mixed concrete, Transportation Research: Part E (1366-5545), vol. 44, no. 1, 2008. pp. 164-179.         [ Links ]

SOUMIS, F., ETHIER, J., and ELBROND, J. Evaluation of the new truck dispatching in the Mount Wright mine, Application of Computers and Operations Research in the Mineral Industry (27th APCOM Symposium), 1989. pp. 674-682.         [ Links ]

WHITE, J.W., ARNOLD, M.J., and CLEVENGER, J.G. Automated Open Pit Truck Dispatching at Tyrone, Engineering and Mining Journal, vol. 6, 1982. pp. 76-84.         [ Links ]

Creative Commons License All the contents of this journal, except where otherwise noted, is licensed under a Creative Commons Attribution License