Application of Lean Principles in the South African Construction Industry

 

 

I. Maradzano#; R.A. Dondofema; S. Matope*

Department of Industrial Engineering, University of Stellenbosch, South Africa

 

 


ABSTRACT

South Africa is a developing country that invests billions of rands annually in the construction industry. This industry consumes resources and, inevitably, waste is generated during the process. Although numerous approaches have been developed to improve quality, efficiency, and effectiveness in this industry, lean principles offer the ability to minimise and/or eliminate non-value adding work, thus increasing value for the client. This paper highlights the lean construction tools currently used worldwide, and the benefits of adopting lean construction. The study surveyed publications on the application of lean principles in the construction industry, and identified tools yet to be implemented in the South African construction industry with specific reference to electrical and mechanical engineering services. The study used a systematic review methodology to identify different lean construction concepts, and developed a lean implementation framework. The framework was then evaluated using a local case focusing on electrical and mechanical engineering services in the construction industry. The improved framework after evaluation consists of eight steps.


OPSOMMING

Suid-Afrika is 'n ontwikkelende land wat miljarde rande jaarliks in die konstruksiebedryf belê. Hierdie industrie verbruik hulpbronne en genereer afval tydens die proses. Alhoewel vele benaderings reeds ontwikkel is om die gehalte, effektiwiteit en doeltreffendheid in hierdie industrie te verbeter, bied lenige beginsels die vermoë om take wat nie waarde toevoeg nie te minimeer en/of te elimineer. Hierdie artikel beklemtoon die lenige konstruksietegnieke wat wêreldwyd gebruik word saam met die voortspruitende voordele. Publikasies rakende die toepassing van lenige beginsels in die konstruksiebedryf is nagevors en tegnieke (gespits op elektriese en meganiese ingenieursdienste) wat nog nie in die Suid-Afrikaanse bedryf toegepas is nie, is identifiseer. Hierdie studie het 'n sistematiese hersieningsmetodologie gebruik om die verskillende lenige konsepte te identifiseer en het daarmee saam 'n lenige implementeringsraamwerk ontwikkel. Hierdie raamwerk is evalueer aan die hand van 'n plaaslike gevallestudie. Die verbeterde raamwerk bestaan uit agt stappe.


 

 

1 INTRODUCTION

Lean manufacturing methodology helps to identify and eliminate or reduce waste in any production process. Waste can be defined as any non-value adding activity in any production process [26] [44]. These non-value adding activities do not improve value; they only increase cost and overall production time [40]. However, non-value adding activities should be distinguished from essential non-value adding activities and non-essential value adding activities [51]. By planning adequately, with proper supervision and correct decision-making based on accurate information and procedures, lean manufacturing principles, if implemented in the South African construction industry, have the potential to eliminate waste, which takes place through the removal of non-essential value adding activities; this leads to cost reduction and performance improvement [7]. Eventually this will improve the overall construction time and deliver quality projects timeously [61].

The construction industry has been lagging (compared with the manufacturing industry) in implementing and improving lean principles and methodologies [6]. This criticism has stimulated research on the application of lean manufacturing principles in the construction sector - hence the coining of the term 'lean construction' [52]. Lean construction's roots can be dated back to the late 1990s [48]. Koskela and Howell [48] proposed analyzing construction activities using production engineering analytical tools. Efforts were made to improve productivity and increase competitiveness in the construction industry. Currently, construction industry participants are exploring new techniques, practices, and processes to make the industry less wasteful [12]. Lean principles, when applied in the construction industry (which will be referred to as 'lean construction' in this paper), offer innovative ways to manage construction projects while reducing waste and improving quality, efficiency, and performance.

The South African construction industry contributes to a large extent to the economy of the country, particularly in setting up physical infrastructure [63]. On the other hand, while most of the activities of this industry have negative effects on the environment, these can be improved through changes in the management of waste [28]. The lean construction philosophy originated from the lean manufacturing concept - mainly from the Toyota production system [74] [70] [18]. The successful implementation of lean principles in the manufacturing industry, and the benefits resulting from their adoption, is one of the key reasons for the adoption of lean thinking in construction [33]. The term 'lean construction' was introduced by the International Group for Lean Construction at the first conference on lean construction in Finland in 1993 [8]. According to Koskela, Huovila and Leinonen [49], lean construction is "a way to design production systems to minimize waste of materials, time and effort to generate the maximum possible amount of value". Implementation of lean construction principles is paramount in decreasing waste and enhancing the South African construction industry's overall performance.

1.1 Review of lean techniques

Many projects in South Africa experience time delays and cost overruns and generate substantial amounts of waste. Lean construction has been introduced to address these challenges in the South African construction industry; however, it is still in its infancy. The construction industry is also characterised by poor quality work, poor safety, and negative effects on the environment [18]. From the available literature on lean construction implementation, the appropriateness of lean construction practices in the construction industry remains a subject of substantial discussion [62] [71] [69]. Table 1 summarises nineteen lean tools that are currently being implemented worldwide in lean construction, as identified in the literature. From these nineteen lean tools, only four have been found in the literature as being used in the South African construction industry. Higher level techniques such as Kanban and 'just in time' (JIT) are yet to be fully applied.

From the analysis in Table 1, the authors observed that the lean tools used in the construction industry are the Kanban system, value stream mapping, first run studies (plan-do-check-act), total quality management, poka-yoke, failure mode and effect analysis, 5 whys, JIT, increased visualisation, standardisation, last planner system, waste elimination, and continuous improvement. According to Salem, Solomon, Genaidy & Minkarah [69], three characteristics differentiate the construction industry from the manufacturing industry: 1) unique projects, 2) complexity, and 3) on-site production. These key differences make it difficult simply to transfer the lean tools in Table 1 from the manufacturing industry to the construction industry.

1.2 Benefits of lean construction

Lean construction has made significant improvements in terms of the timely completion of construction projects [5]. These improvements are facilitated by the way the construction site is managed and controlled, and are shown in Table 2 [1] [3] [7] [14] [29] [36] [41] [42] [45] [50] [52] [57] [58] [59] [69] [80] [81]. Applications of lean principles in construction have resulted in efficiency improvement of overall equipment effectiveness (OEE), as seen from Table 2. The main benefits of lean construction are reduction of waste, customer satisfaction, and overall project cost reduction. Lean construction helps construction companies to identify and analyse waste to improve productivity, reduce project duration, improve safety, improve quality, ensure customer satisfaction, and improve reliability.

1.3 Gap analysis

From the brief analysis of the literature on lean construction, it has been observed that there are limited frameworks for the implementation of lean construction for different construction projects in the South African construction industry. The authors observed that there is limited application of lean construction in the electrical and mechanical services (wet, fire, and heating, ventilation and air conditioning (HVAC) projects), which are also key components of the construction industry. Hence the aim of this study is to develop a lean construction implementation framework that can be used to implement lean principles in mechanical and electrical services projects.

 

2 METHODOLOGY

The research design employed for this study was a systematic literature review of published literature. A systematic literature review is an important scientific research approach that can be used to appraise, summarise, and communicate the findings and implications of a large number of research publications on a particular subject [39]. Second, evidence in the literature shows that previous authors [32] [35] [54] [67] have adopted a similar approach with their respective studies. A systematic literature review is used to gather and study a huge number of research studies and publications relating to a specific subject to answer predefined questions, by incorporating the practical evidence from all relevant studies [25].

A systematic literature review is a part of research in its own right and, by its nature, is able to address much wider questions than single empirical studies ever can. Without doubt, a systematic review is at the top of the 'hierarchy of evidence' compared with other research designs, because it has the potential to deliver the most important practical implications [25]. Thus the systematic literature review focused on reviewing available studies in the construction industry through different search engines. The study was conducted in six steps, as shown in Table 3.

 

3 CONDUCTING THE REVIEW

3.1 Data sources and data collection

To identify studies on lean construction, the authors used 'lean in construction industry' and 'lean construction' as search terms as shown in Table 4. The search fields used were article title, abstract, and keywords. The search engines used were Web of Science, Google Scholar, and Science Direct. The initial search yield is displayed in Table 4.

3.2 Selection criteria

Out of 536 publications found on the primary search, an extensive review was done to establish whether each publication was fit for the systematic literature review. The first screening criterion was to check whether or not the publication was related to the topic of lean construction implementation. The second vetting process was to check whether or not the publication was relevant to the scope of the study. A total of 343 publications were found to be unrelated to the topic of study. Of the 193 publications that were related to the topic, only 33 papers were relevant to the current study. Of the 33 papers found, only nine papers focused on lean construction in the South African construction industry. Figure 1 shows the document selection.

 

 

4 OUTCOMES OF THE SYSTEMATIC REVIEW

This section is divided into two sub-sections: descriptive statistics and conceptual aspects.

4.1 Descriptive statistics

From the systematic literature review, it was found that documents that related to lean construction were in the form of journal articles, conference papers, industry research reports, and book chapters. The review focused on lean implementation in the construction industry, the authors selected material with a rich content of empirical data on lean construction implementation. A total of 33 publications were relevant to the current study of lean construction implementation. These were published from 2012 to 2019. Of these publications, 58 per cent were journal articles, 39 per cent conference papers, and three per cent book chapters, as shown in Figure 2. From these papers, the next step was to read the whole paper to understand the study objective, the research approach used, key concepts, and the lean tools used in each paper.

 

 

Out of the 33 papers that were relevant to the current study, only nine focused on the South African construction industry. Figure 3 shows the sub-sectors in which lean construction has been applied in the South African construction industry. From these results it is evident that there is limited application of lean construction, particularly in the electrical and mechanical services (wet, fire, and heating, ventilation and air conditioning (HVAC)) in the South African construction industry. Construction and civil engineering projects involve the management of infrastructure such as roads, tunnels, bridges, airports, railroads, dams, and sewerage. Commercial buildings are those construction projects that involve building projects that can be leased or sold in the private sector. These spaces can be anything from offices and retail shopping centres to medical centres.

 

 

4.2 Conceptual aspects

Different concepts were identified from the systematic literature review, and were grouped into four categories, as shown in Table 5. Category 1 consists of the following concepts: understanding customer needs, identifying the value stream, and identifying value-adding and non-value-adding activities [7] [10] [21]. Category 2 focuses on investigating the current state of lean construction, identifying lean construction barriers, identifying lean construction implementation drivers, and implementing lean construction tools [2] [3] [62]. Lean implementing barriers include cultural barriers, resistance to change, and lack of knowledge about the lean construction philosophy. Category 3 highlights managerial support for the successful implementation of lean construction, government support, mind-set change, and change management of organisational culture and perception [15] [16] [17]. When the paradigm shifts, everything changes [54]. Training programmes should be made available to workforces at different levels to spread the required skills and techniques for minimising waste, such as cost and time control, scheduling, and risk analysis [54] [58] [72]. Category 4 consists of performance management, lean construction plan, lean project delivery system, project planning, and continuous improvement. There are nine lean construction key performance indicators. These are time, costs, quality, client satisfaction, environmental impact, waste, speed, value, and health and safety [36] [40] [75].

 

5 DEVELOPING THE FRAMEWORK

From the systematic literature review, the authors developed a framework that can be used in the mechanical and electrical services industries. Lean construction focuses on getting things right, in the right place, at the desired time, and in the desired quantity [23] [32]. The framework consists of seven steps, as shown in Figure 6. The first step is to identify waste practices on site. This will enable the person tasked to implement lean construction to determine the level of comprehension of construction waste among the contractors involved in the project. The second step, as shown in Table 6, is to educate project managers and team leaders about lean construction and its benefits. This step is crucial to get support from all teams involved in the project. The third step is to identify value from the customer's perspective. The fourth stage is to identify the value stream; this is made out of all the activities that create customer value and satisfy the demands and expectations of the customer. In this stage, value-adding activities should be distinguished from non-value-adding activities. This will lead to the discovery of the sources of waste. The fifth step is to establish flow by minimising waste - unnecessary waiting time, storage of material, unnecessary processes, unnecessary transportation of material, movement of labour workforces, etc. - and focusing on value-adding activities only. Maintaining a continuous flow of work on site, contractors can make use of different tools (such as plan-do-check-act) where everything is documented and responsibility is taken for each and every action. Contractors can identify possible sources of waste when they do their risk assessment on site. The sixth step will be to share with other workmates on site the waste likely to be encountered, and how to reduce this waste so that everyone on site is aware of lean construction. This will cultivate continuous learning on the construction site. The seventh step is to seek perfection; this is achieved by repeating steps one to six. It is through repeating these steps that Kaizen (continuous improvement) is achieved.

 

6 EVALUATING THE FRAMEWORK

6.1 Case description

This framework was evaluated using a project for the refurbishment of government offices in South Africa. One of the authors had participated in this project. The scope of the project was as follows:

Demolition of some walls to extend offices

Renovation and replacement of the roof

Mechanical engineering services: Installation of new air conditioning units, installation of new fire fighting equipment, and new plumbing pipes.

Electrical engineering services: Installation of new lighting inside and outside the building, upgrading of the existing distribution board, installation of access control, installation of new small power, and installation of a generator and an automatic transfer switch linked to the generator

Installation of new ceiling

Internal plastering and internal painting

External paving

Construction of a covered outdoor waiting area.

6.2 Understanding current waste reduction practices at the targeted construction site

Semi-structured interviews were conducted to determine the level of understanding of lean construction from the site foremen, site manager, and project manager. Each interviewee was briefed about lean thinking and different waste types based on the work of Liker & Meier [51] and Womack & Jones [74]. During the interviews, these team leaders were requested to provide waste examples from their experience.

6.3 Educating all contractors taking part in the project about lean construction and its benefits

The author made a presentation on lean construction and its benefits to all contractors on-site during the daily toolbox talks. The objective was to ensure that everyone on site understands lean construction principles and is on board for successful implementation of lean.

6.4 Specify value

'Value' stands for what the customer agrees to pay in return. The value in this construction project was to achieve heating, cooling, fresh air supply, ventilation, fire detection systems, fire protection systems, lighting, and power supply.

6.5 Identify value stream

A Gantt chart was used to help identify the value stream. Activities on the Gantt chart were shared on noticeboards on-site so that everyone had a chance to appreciate the value stream. The importance of finishing the project on time and of religiously following the Gantt chart was emphasised to everyone. Identification of sources of waste and of potential sources of waste was done on-site. Demonstration of value-adding, non-value-adding, and unnecessary activities for each construction process was done. Value-adding activities were defined as those activities that directly affect the final product of the construction process, increase the economic worth of the process, and are valued by the customer.

6.6 Establish flow of products

A continuous flow of work was created by revising the Gantt chart when necessary. Waste in construction is assumed to be physical - for example, waste of materials in the construction process - but in reality there are multiple activities that do not add any value and should be regarded as waste in this industry. The flow of products was defined as the movement of materials, information, and equipment through a system. This step is necessary, as it enhances the flow of materials and information in a construction process.

6.7 Pull production

Pull production aims to ensure just-in-time coordination between upstream and downstream tasks. The author was on site twice a week to ensure that everything was delivered just in time to avoid any delays. Materials and information were delivered to the next station at the right time, at the right place, and without delay or unnecessary storage. Architectural drawings and design drawings were delivered in time by the designing team to the contractor. The Kanban system was also used to achieve pull production. This helps in controlling and balancing the resources required in order to achieve project completion.

6.8 Seeking perfection

Continuous improvement (Kaizen) was done to provide a perfect solution without mistakes. The project deadline should be met, and the client's needs satisfied, saving on project costs and reducing project duration.

6.9 Improved lean implementation framework

The improved lean implementation framework is developed after the evaluation phase. This framework can be used in lean construction for electrical and mechanical engineering services.

 

Table 7

 

7 CONCLUSION

In this paper, a lean implementation framework has been developed and evaluated in the context of electrical and mechanical engineering services in the construction industry in South Africa. The benefits of adopting lean construction as highlighted in the paper are immense, and will make the industry more resource-efficient. From the systematic literature review done, it was evident that lean construction techniques have not been practised and implemented in the mechanical (HVAC) and electrical construction services. The study contributes to covering that gap by developing a lean construction framework. The next step in this study is to implement this framework fully, and further resynthesize and improve the framework. The authors also seek to refine the implementation of the high level tools of lean construction, such as JIT, in a project setting.

 

REFERENCES

[1] Abbasian-Hosseini, S.A., Nikakhtar, A. & Ghoddousi, P. 2014. Verification of lean construction benefits through simulation modeling: A case study of bricklaying process. KSCE Journal of Civil Engineering, 18(5), pp. 1248-1260.         [ Links ]

[2] Abdelhamid, T. & Salem, S. 2005. Lean construction: A new paradigm for managing construction projects. In: Proceedings of the International Workshop on Innovations in Materials and Design of Civil Infrastructure, Cairo Egypt, 28-29 December 2005, pp. 28-29.         [ Links ]

[3] Adamu, I. & Howell, G. 2012. Applying last planner in the Nigerian construction industry. Twentieth Annual Conference of the International Group for Lean Construction (IGLC-20), San Diego, CA, July 2005, pp. 18-22.         [ Links ]

[4] Adamu, S. & Hamid, R.A. 2012. Lean construction techniques: Implementation In Nigeria construction industry. Canadian Journal on Environmental, Construction and Civil Engineering, 3(4), pp. 186-193.         [ Links ]

[5] Ahiakwo, O., Oloke, D., Suresh, S. & Khatib, J. 2013. A case study of last planner system implementation in Nigeria. 21st Annual Conference of the International Group for Lean Construction, IGLC, Fortaleza, Brazil, 2013, pp. 699-707.         [ Links ]

[6] Ahmed, S. & Forbes, L. 2011. Modern construction: Lean project delivery and integrated practices. New York: CRC Press.         [ Links ]

[7] Akinradewo, O., Oke, A., Aigbavboa, C. & Ndalamba, M. 2018. Benefits of adopting lean construction technique in the South African construction industry. International Conference on Industrial Engineering and Operations Management, November 2018, pp. 1271 -1277.         [ Links ]

[8] Alarcon, L. 1997. Tools for the identification and reduction of waste in construction projects. Lean construction. 3rd edition. CRC Press Rotterdam, pp 374-383.         [ Links ]

[9] Al-Aomar, R. 2012. Analysis of lean construction practices at Abu Dhabi construction industry. Lean Construction Journal, 2012, pp. 105-121.         [ Links ]

[10] Alves, T. da C.L., Pestana, A.C.V.M.F., Gilbert, E. & Hamzeh, F. 2016. Lean principles for the management of construction submittals and RFIs. Journal of Professional Issues in Engineering Education and Practice, 142(4), pp 46-70.         [ Links ]

[11] Ansah, R.H. & Sorooshian, S. 2017. Effect of lean tools to control external environment risks of construction projects. Sustainable Cities and Society, 32, pp. 348-356.         [ Links ]

[12] Arbulu, R. 2002. Improving construction supply chain performance: Case study on pipe supports used in power plants. Master's of Engineering thesis, Construction Engineering and Management Program. Berkeley: University of California.         [ Links ]

[13] Arbulu, R., Ballard, G. & Harper, N. 2003. Kanban in construction. In: Proceedings of IGLC-11, Virginia Tech, Blacksburgh, Virginia, USA, pp. 16-17.         [ Links ]

[14] Arleroth, J. & Kristensson, H. 2011. Waste in lean construction: A case study of a PEAB construction site and the development of a lean construction tool. Master of Science Thesis in the Master of Supply Chain Management. Department of Technology Management and Economics, Chalmers University of Technology Gothenburg, Sweden.         [ Links ]

[15] Aziz, R.F. & Abdel-Hakam, A.A. 2016. Exploring delay causes of road construction projects in Egypt. Alexandria Engineering Journal, 55(2), pp. 1515-1539.         [ Links ]

[16] Aziz, R.F. & Hafez, S.M. 2013. Applying lean thinking in construction and performance improvement. Alexandria Engineering Journal, 52(4), pp. 679-695.         [ Links ]

[17] Babalola, O., Ibem, E.O. & Ezema, I.C. 2019. Implementation of lean practices in the construction industry: A systematic review. Building and Environment, 148(May 2018), pp. 34-43. https://doi.org/10.1016/j.buildenv.2018.10.051        [ Links ]

[18] Bajjou, M.S., Chafi, A. & En-Nadi, A. 2017a. A comparative study between lean construction and the traditional production system. International Journal of Engineering Research in Africa, 29, pp. 118-132.         [ Links ]

[19] Bajjou, M.S., Chafi, A., En-Nadi, A. & El Hammoumi, M. 2017b. The practical relationships between lean construction tools and sustainable development: A literature review. Journal of Engineering Science and Technology Review, 10(4), pp. 170-177.         [ Links ]

[20] Bajjou, M.S., Chafi, A. & En-Nadi, A. 2017c. The potential effectiveness of lean construction tools in promoting safety on construction sites. International Journal of Engineering Research in Africa, 33, pp. 179-193.         [ Links ]

[21] Bajjou, M.S. & Chafi, A. 2018. Lean construction implementation in the Moroccan construction industry: Awareness, benefits and barriers. Journal of Engineering, Design and Technology, 16(4), pp. 533-556.         [ Links ]

[22] Ballard, G. & Howell, G. 1994. Implementing lean construction: Stabilizing work flow. Lean construction. 2nd edition. CRC Press Rotterdam, pp. 105-114.         [ Links ]

[23] Ballard, G. & Howell, G. 2003. Lean project management. Building Research & Information, 31(2), pp. 119-133.         [ Links ]

[24] Barlow, J. 1996. Partnering, lean production and the high performance workplace. In: 4th Annual Conference of the International Group for Lean Construction. Birmingham, UK, pp. 24-37        [ Links ]

[25] Bearman, M. & Dawson, P. 2013. Qualitative synthesis and systematic review in health professions education. Medical Education, 47(3), pp. 252-260.         [ Links ]

[26] Bicheno, J. & Holweg, M. 2016. The lean toolbox: The handbook for lean transformation.5th Edition, Production and Inventory Control, Systems and Industrial Engineering (PICSIE) Books, Buckingham, England        [ Links ]

[27] Caldera, H.T.S., Desha, C. & Dawes, L. 2018. Exploring the role of lean thinking in sustainable business practice: A systematic literature review. Journal of Cleaner Production, 167, pp. 1546-1565.         [ Links ]

[28] Du Plessis, C (ed.) 2002. Agenda 21 for Sustainable Construction in Developing Countries, a discussion document. WSSD edition, CSIR Building and Construction Technology, Pretoria, South Africa, Boutek report No Bou E, 204(6).         [ Links ]

[29] Carneiro, S., Campos, I., Oliveira, D.D. & Neto, J. 2012. Lean and green: A relationship matrix. In: Proceedings of the 20th Annual Conference of IGLC, San Diego ,USA.18-20 July 2012,pp. 120-130        [ Links ]

[30] Conner, G. 2009. Lean manufacturing for the small shop. Dearborn: Society of Manufacturing Engineers.         [ Links ]

[31] Dakhli, Z., Lafhaj, Z. & Benrard, M. 2016. Application of lean to the bidding phase in building construction: A French contractor's experience. International Journal of Lean Six Sigma, 8(2), pp. 153-180.         [ Links ]

[32] Dondofema, R.A., Matope, S. & Akdogan, G. 2017. Lean applications: A survey of publications with respect to South African industry. South African Journal of Industrial Engineering, 28(1), pp. 103-113.         [ Links ]

[33] Egan, J. 1998. Rethinking construction. (The report of the construction task force). London: Department of Environment, Transport and Regions.         [ Links ]

[34] El-Kourd, R. 2009. A study of lean construction practices in Gaza Strip. Master's thesis. Gaza: Civil Engineering Department, Islamic University of Gaza, p. 121.         [ Links ]

[35] Emuze, F. & Smallwood, J. 2013. The integration of health and safety (H&S), lean and sustainability in construction: A literature review. In Proceedings IGLC-21, July 2013, Fortaleza, Brazil, pp. 853-862.         [ Links ]

[36] Erol, H., Dikmen, I. & Birgonul, M.T. 2017. Measuring the impact of lean construction practices on project duration and variability: A simulation-based study on residential buildings. Journal of Civil Engineering and Management, 23(2), pp. 241-251.         [ Links ]

[37] Ferng, J. & Price, A. 2005. An exploration of the synergies between six sigma, total quality management, lean construction and sustainable construction. International Journal of Six Sigma and Competitive Advantage, 1(2), pp. 167-187.         [ Links ]

[38] Fitchett, A. & Hartmann, D. 2017. The application of lean design to space planning and construction. Transactions of the Royal Society of South Africa, 72(3), 3 July 2017, pp. 255-265.         [ Links ]

[39] Green, S. 2005. Systematic review and meta-analysis. Singap. Med. J., 46(6), pp. 270-274.         [ Links ]

[40] Hosseini, S., Nikakhtar, A., Wong, K. & Zavichi, A. 2011. Implementing lean construction theory into construction processes' waste management. International Conference on Sustainable Design and Construction, Kansas City, Missouri, March 23-25 ,2011,pp. 414-420        [ Links ]

[41] Ikuma, L.H., Nahmens, I. & James, J. 2010. Use of safety and lean integrated kaizen to improve performance in modular homebuilding. Journal of Construction Engineering and Management, 137(7), pp. 551-560.         [ Links ]

[42] Issa, U.H. 2013. Implementation of lean construction techniques for minimizing the risks effect on project construction time. Alexandria Engineering Journal, 52(4), pp. 697-704.         [ Links ]

[43] Khanh, H.D. & Kim, S.Y. 2015. Development of waste occurrence level indicator in Vietnam construction industry. Engineering, Construction and Architectural Management, 22(6), pp. 715-731.         [ Links ]

[44] Koksal, G. & Egitman, A. 1998. Planning and design of industrial engineering education quality. Computers & Industrial Engineering, 35(3-4), pp. 639-642.         [ Links ]

[45] Howell, G. (1999). What is lean construction? Proceedings of the 7th Conference of the International Group for Lean Construction, Berkeley, California, USA ,26-28th July 1999,pp.1-10        [ Links ]

[46] Koskela, L. 1992. Application of the new production philosophy to construction. CIFE, Technical Report No. 72. Stanford: Stanford University, p. 75.         [ Links ]

[47] Koskela, L. 1994. Lean construction. Kensington: N.S.W. Institution of Engineers Australia.         [ Links ]

[48] Koskela, L. & Howell, G. 2000. Reforming project management: The role of lean construction. Proceedings of 8th Conference of International Group for Lean Construction, Brighton, Brazil,17-19th of July 2000,pp. 30-39.         [ Links ]

[49] Koskela, L., Huovila, P. & Leinonen, J. 2002. Design management in building construction: From theory to practice. Journal of Construction Research, 3(1), pp. 1-16.         [ Links ]

[50] Lehman, T. & Reiser, P. 2000. Maximizing value & minimizing waste: Value engineering and lean construction. New York: Lean Construction Institute.         [ Links ]

[51] Liker, J.K. & Meier, D. 2004. The Toyota way. 2nd ed., New York: McGraw Hill.         [ Links ]

[52] Love, P., Zahir, I. & David, E. 2003. Learning to reduce rework in projects: Analysis of firm's organizational learning and quality practices. Project Management Journal, 1(September), pp. 13-25.         [ Links ]

[53] Mandujano, M.G., Alarcon, L.F., Kunz, J. & Mourgues, C. 2016. Identifying waste in virtual design and construction practice from a lean thinking perspective: A meta-analysis of the literature. Journal of Construction, 15(3), pp. 107-118.         [ Links ]

[54] Marhani, M.A., Jaapar, A., Bari, N.A.A. & Zawawi, M. 2013. Sustainability through lean construction approach: A literature review. Procedia - Social and Behavioural Sciences, 101, pp. 90-99.         [ Links ]

[55] Marosszeky, M., Thomas, R., Karim, K., Davis, S. & McGeorge, D. 2002. Quality management tools for lean production: Moving from enforcement to empowerment. In: Proceedings, IGLC-10, 10th Conference of International Group for Lean Construction, Gramado, Brazil , 6-8th August 2002, pp. 87-99.         [ Links ]

[56] Miron, L.I.G., Kaushik, A. & Koskela, L. 2015. Target value design: The challenge of value generation. In: 23rd Annual Conference of the International Group for Lean Construction, Perth, Australia, July 29-31,pp. 815-825        [ Links ]

[57] Nahmens, I. & Ikuma, L.H. 2009. An empirical examination of the relationship between lean construction and safety in the industrialised housing industry. Lean Construction Journal, 1(June), pp. 1-12.         [ Links ]

[58] Nahmens, I. & Ikuma, L.H. 2012. Effects of lean construction on sustainability of modular homebuilding. Journal of Architectural Engineering, 18(2), pp. 155-163.         [ Links ]

[59] Nielsen, Y. & Tezel, A. 2013. Lean construction conformance among construction contractors in Turkey. Journal of Management in Engineering, 29(3), pp. 236-250.         [ Links ]

[60] Ogunbiyi, O.E. 2014. Implementation of the lean approach in sustainable construction: A conceptual framework. PhD thesis. Preston: University of Central Lancashire.         [ Links ]

[61] Paez, O., Solomon, J., Salem, S. & Genaidy, A. 2005. Moving from lean manufacturing to lean construction: Toward a common sociotechnological framework. Wiley Periodicals, Human Factors and Ergonomics, Manufacturing Journal, 15(2), pp. 233-245.         [ Links ]

[62] Picchi, F.A. & Granja, A.D. 2004. Construction sites: Using lean principles to seek broader implementations. In: Proceedings of the 12th Annual Conference of the International Group for Lean Construction (IGLC-12), Helsingor,Denmark,3-5th August 2004 ,pp.529-541.         [ Links ]

[63] Takim, R. & Akintoye, A. 2002. Performance indicators for successful construction project performance. In: 18th Annual ARCOM Conference, 2, pp. 545-555.         [ Links ]

[64] Tezel, A., Koskela, L. & Aziz, Z. 2018. Lean thinking in the highways construction sector: Motivation, implementation and barriers. Production Planning & Control, 29(3), pp. 247-269.         [ Links ]

[65] Alves, T. da C.L.A., Milberg, C. & Walsh, K.D. 2012. Exploring lean construction practice, research, and education. Engineering, Construction and Architectural Management, 19(5), pp. 512-525.         [ Links ]

[66] Tommelein, I.D. 2015. Journey toward lean construction: Pursuing a paradigm shift in the AEC industry. Journal of Construction Engineering and Management, 141(6), pp.926-948. https://doi.org/10.1061/(asce)co.1943-7862.0000926        [ Links ]

[67] Saieg, P., Sotelino, E.D., Nascimento, D. & Caiado, R.G.G. 2018. Interactions of building information modeling, lean and sustainability on the architectural, engineering and construction industry: A systematic review. J. Clean. Prod., 174, pp. 788-806.         [ Links ]

[68] Salem, O. & Zimmer, E. 2005. Application of lean manufacturing principles to construction. Lean Construction Journal, 2(October), pp. 51-54.         [ Links ]

[69] Salem, O., Solomon, J., Genaidy, A. & Minkarah, I. 2006. Lean construction: From theory to implementation. Journal of Management in Engineering, 22(4), pp. 168-175.         [ Links ]

[70] Sarhan, J.G., Xia, B., Fawzia, S. & Karim, A. 2017. Lean construction implementation in the Saudi Arabian construction industry. Construction Economics and Building, 17(1), pp. 46-69.         [ Links ]

[71] Shang, G. & Sui Pheng, L. 2014. Barriers to lean implementation in the construction industry in China. Journal of Technology Management in China, 9(2), pp. 155-173.         [ Links ]

[72] Umstot, D. 2013. Introduction to lean construction: What is lean construction and how can it benefit you? [Webinar] London: ABC Webinar.         [ Links ]

[73] Watson, M. 2003. Lean-examples in construction, A report of workshop organized by the Construction Productivity Network on the 23rd Sept 2003 at The Orange Studio. Caxton House, Cannon Street, Birmingham.         [ Links ]

[74] Womack, J. & Jones, D. 1996. Lean thinking. New York: Simon & Schuster.         [ Links ]

[75] Yu, H., Tweed, T., Al-Hussein, M. & Nasseri, R. 2009. Development of lean model for house construction using value stream mapping. Journal of Construction Engineering and Management, 135(8), pp. 782-790.         [ Links ]

[76] Zhang, L., Chen, X. & Suo, Y. 2017. Interrelationships among critical factors of work flow reliability in lean construction. Journal of Civil Engineering and Management, 23(5), pp. 621-632.         [ Links ]

[77] Emuze, F.A. & Smallwood, J.J. 2011. Clients' perceptions of non-value adding activities in South Africa. In: Proceedings of the 19th Conference of the International Group for Lean Construction (IGLC), 13-15 July, Lima, Peru, pp. 668- 677.         [ Links ]

[78] Construction Industry Development Board. 2004. SA construction industry status report - 2004: Synthesis review on the South African construction industry and its development. Pretoria: CIDB.         [ Links ]

[79] Othman, A.A.E. 2011. Lean principles as a strategic option for delivering innovative sustainable construction projects: A client value driven approach. In: Proceedings of the 6th Built Environment Conference of the Association of Schools of Construction of Southern Africa (ASOCSA), 31 July-2 August, Johannesburg, South Africa, pp. 174-184.         [ Links ]

[80] Emuze, F. & Ungerer, H. 2014. Change in South Africa construction: Lessons from lean thinking. 22nd Annual Conference of the International Group for Lean Construction: Understanding and Improving Project Based Production, IGLC 2014, (051), pp. 1121-1131.         [ Links ]

[81] Monyane, T., Awuzie, B. & Emuze, F. 2017. Performance indicators for lean construction in South Africa : Lessons from the Port Elizabeth province. In Proceedings of the 4th International Conference on Infrastructure Development and Investment Strategies for Africa ,Livingstone, Zambia, 30August -1 September, pp. 147-156.         [ Links ]

 

 

# The author was enrolled for an M Eng. (Research) Industrial Engineering degree in the Department of Industrial Engineering, Stellenbosch University, South Africa
* Corresponding author: smatope@sun.ac.za

Creative Commons License All the contents of this journal, except where otherwise noted, is licensed under a Creative Commons Attribution License