SciELO - Scientific Electronic Library Online

 
vol.24 issue2Investigating of eco- and energy-efficient lubrication strategies for the drilling of light metal alloysA location-inventory model including delivery delay cost and capacity constraints in a stochastic distribution network author indexsubject indexarticles search
Home Pagealphabetic serial listing  

Services on Demand

Article

Indicators

Related links

  • On index processCited by Google
  • On index processSimilars in Google

Share


South African Journal of Industrial Engineering

On-line version ISSN 2224-7890
Print version ISSN 1012-277X

S. Afr. J. Ind. Eng. vol.24 n.2 Pretoria Jan. 2013

 

GENERAL ARTICLES

 

Conceptualisation for implementing total productive maintenance through the ISO 9001:2008 standard-based quality management system

 

 

N.M. SivaramI, 1; S.R. DevadasanII; R. MurugeshIII

IDepartment of Production Engineering. PSG College of Technology. Coimbatore - 641 004, Tamil Nadu, India. nmsivaram@gmail.com
IIDepartment of Production Engineering. PSG College of Technology. Coimbatore - 641 004, Tamil Nadu, India. devadasan_srd@yahoo.com
IIIDarshan Institute of Engineering and Technology Rajkot - 363 650, Gujarat, India. drmurugesh_m@yahoo.com

 

 


ABSTRACT

This paper conceptualises the integration of total productive maintenance (TPM) and ISO 9001 certification by contributing a model called TPM 9001:2008. Through this conceptualisation, the eight TPM pillars are amended to the five major clauses of the ISO 9001:2008 standard. To illustrate this conceptualisation, the contents of a sub-clause of the TPM 9001:2008 model are presented, and the rationale behind its designation is appraised.


OPSOMMING

Hierdie artikel konseptualiseer die integrasie van Totale Produktiewe Instandhouding (TPI) en ISO 9001 sertifisering deur 'n model bekend as TPI 9001:2008 voor te stel. Deur hierdie konseptualisering word die agt TPI-pilare aangepas met die oog op die vyf belangrike klousules van die ISO 9001:2008 standaard. Ter illustrasie van die konseptualisering word die inhoud van 'n sub-klousule van die TPI 9001:2008 model voorgehou en die grondslag daarvan beoordeel.


 

 

1. INTRODUCTION

The customers of any business in the modern world expect products and services to meet the highest standards. The rapid rate of globalisation has prompted customers all over the world to develop these high expectations [40]. This phenomenon has forced organisations to provide products and services at a world class level [28,65], reached through adopting and implementing world class strategies. Total productive maintenance (TPM) and ISO 9001 certification are two of the strategies that propel organisations to reach this world class level [23,26].

The ISO 9001 standard was formally published in 1987 [6,23]. Since then, the rate of adoption of the ISO 9001 standard-based quality management system has been high, and 1,109,905 organisations in 178 countries have been certified to the ISO 9001 standard [31]. The success of the ISO 9001 certification can be attributed to its ability to transform any organisation into a world class organisation. Some of the evidence of superior performances by ISO 9001-certified organisations, reported by many researchers and practitioners, espouses the success of the ISO 9001 certification [22,24,61]. TPM has a similar history reported in the literature. TPM was developed in Japan in 1971 [67]. Later that year it was promoted throughout Japan by the Japanese Institute of Plant Maintenance (JIPM). Over the years, the application of TPM spread to many sectors, and its scope expanded from improving maintenance quality to enhancing the performance of organisations. At present, TPM is widely adopted to enhance the quality, productivity, and profit of an organisation through equipment maintenance. TPM is today regarded as a world class manufacturing (WCM) strategy due to its ability to enhance the performance of an organisation to be sustainable in the global competitive scenario [2,4].

Over the years, TPM has evolved by adopting the principles of various maintenance strategies. As a result, TPM has become a comprehensive strategy to aid enhanced quality in maintenance activities [2,16]. Along with maintenance, TPM facilitates plant management with the emphasis on quality, safety, and productivity, resulting in the overall enhancement of organisations' performance [26,35]. TPM is an application of TQM principles in the maintenance engineering field [26]. TQM principles, like employee involvement, continuous improvement, and customer focus, are encapsulated in the TPM model. The ISO 9001 certification can be regarded as an offshoot of TQM as it embraces eight quality management principles. In other words, ISO 9001 certification facilitates the building of a TQM culture in organisations [41]. These facets imply that TPM and ISO 9001 certification are built on TQM principles. Both TPM and ISO 9001 certification by themselves should thus have common elements. If these common elements are identified and suitably integrated, the synergistic benefits of implementing TPM and obtaining the ISO 9001 certificate can be more effectively obtained. In this context, it is presumed that the integration of TPM principles with the ISO 9001:2008 standard will help organisations to acquire world class manufacturing competencies. However, no research or practical work on this has so far been reported.

To fulfill the need to integrate the TPM principles with the ISO 9001:2008 standard, a model called TPM 9001:2008 has been conceptualised in this paper, which has been organised into five sections. After this introduction, the details of a literature survey conducted before designing the TPM 9001:2008 model are briefly described. The information and knowledge gained by conducting this literature survey were used to design the TPM 9001:2008 model. These details are presented in the third section. The fourth section concludes the paper.

 

2. LITERATURE SURVEY

The literature survey reported here was carried out to study the developments that have occurred in the fields of ISO 9001 certification and TPM. After studying these developments, a search was made to identify any research that has resulted in the integration of TPM principles with the ISO 9001:2000 and ISO 9001:2008 standards. These details are described in the following subsections.

2.1 Origin and growth of the ISO 9000 series of standards

The origin of the ISO 9000 series of standards can be dated back to the time of the Second World War. The army procurement standards used in that war planted the seeds of what became the ISO 9000 series of standards. These army procurement standards were adopted in 1979 as the BS 5750 standard. In 1987, the ISO 9000 series of standards were formally published by adopting the contents of the BS 5750 standard. The first revised ISO 9000 series of standards were published in 1994. These standards were made available as ISO 9001, ISO 9002, and ISO 9003, giving quality management systems (QMS) specifications for 'design and development', 'production and installation', and 'final inspection' respectively. The ISO 9001:1994 standard contained 20 clauses. During its revision in 2000, these were replaced by five major clauses. The latest revised version of the ISO 9001 standard is ISO 9001:2008, published on November 15, 2008. The ISO 9001:2000 and ISO 9001:2008 standards do not differ much from each other, as the modifications made to the ISO 9001:2000 standard to evolve into the ISO 9001:2008 standard were minimal [6,47,48,56,61,69,70].

The number of companies obtaining ISO 9001 certification has grown extensively over the years [22]. The statistics provided by the ISO Survey 2009 also indicate this massive growth in ISO 9001 certification [31]. This can be related to the ability of the ISO 9001 certification to aid organisations in meeting global customer requirements. Presently, ISO 9001 certification has become near-mandatory for organisations' recognition and survival in the global market [48,61].

2.2 Benefits and criticisms of the ISO 9001 certification

Some of the benefits gained by companies through the ISO 9001 certification, as reported in the literature, are listed below. Organisations with internal motivation to implement and maintain the ISO 9001 certification have accrued more benefits than organisations that are externally motivated to implement and maintain this certification [72,73]:

  • Market expansion [12,37,38,46,48,52,66,70]
  • Improved product and service quality [25,36,37,46,48,51,66]
  • Cost reduction and financial benefits [25,34,38,51,66]
  • Improved customer satisfaction and confidence [25,38,46,52]
  • Enhanced employee involvement and morale [48,52,66,70]
  • On-time product delivery and improved product performance [25,37,52]
  • Systematic organisation [12,25,51,66].

Despite these benefits, a few criticisms of the ISO 9001 certification have appeared in the literature. These criticisms, as reported by some researchers and practitioners, are listed below:

  • ISO 9001 certification results in internal bureaucracy and documentation [14,23]
  • ISO 9001 certification is combined with very high implementation costs (cost of auditors, consultants, time, and resources) that are unaffordable for various organisations, especially small- and medium-scaled enterprises [14,39]
  • The ISO 9001 standard is generic in nature, not industry-specific [39]
  • The benefits of obtaining ISO 9001 certification are not clearly evidenced [39,58].

Despite these criticisms, ISO 9001 certification has grown exponentially worldwide, and has been increasingly adopted [48].

2.3 Origin and growth of TPM

TPM was first introduced in 1971 by Nippondenso Co., a company in the Toyota group. Later that year, Seiichi Nakajima promoted TPM throughout Japan. Four decades since its inception, TPM has become a renowned comprehensive maintenance management strategy [2,4,35,43]. Today TPM is successfully implemented in many countries, including the USA, China, India, Malaysia, South Africa, Libya, Nigeria, Ethiopia, Puerto Rico, Hong Kong, Greece, and Italy [1,2,3,16,21,30,45,59,62,63,67]. The 2010 TPM excellence awards have been awarded by the Japan Institute of Plant Maintenance (JIPM) to organisations in many countries, including Argentina, India, Brazil, Thailand, Turkey, Serbia, China, Romania, Saudi Arabia, and Egypt [32]. The success of TPM can be attributed to its comprehensive nature, combining the three aspects of maintenance, production, and resources. Another reason for TPM's success is that it has encapsulated the best practices of earlier maintenance strategies; breakdown maintenance, predictive maintenance, and preventive maintenance [2,4,26,49].

2.4 Benefits and criticisms of TPM

Some of the benefits made available through successful TPM implementation are:

  • The creation of a defect-free, interruption-free, and accident-free production environment [2,26,35]
  • An improvement in end product quality [1,5,11,19,55,63,64]
  • An increase in overall productivity [1,2,11,19,63,64]
  • The creation of a sense of ownership among the operators through autonomous maintenance [5,15,16,55,62]
  • The promotion of employee education and training [16,19,20,55,68]
  • Multi-skilling of employees [11,16,20].
  • The enhancement of the levels of productivity, quality, financial performance, delivery performance, safety, and morale in the organisation. [2]

In the literature, criticisms of TPM implementation are scarce. Some of them are reported by the researchers below:

  • Resource scarcity increases if TPM is implemented simultaneously on too many machines. This can lead to low or even zero productivity improvement, and can result in the demotivation of TPM personnel, in turn leading to the total failure of the TPM programme [16,17].
  • Operators performing autonomous maintenance may become frustrated due to the increase in workload [49].

As the benefits override the criticisms, TPM continues to grow as a world class strategy [2].

2.5 Integration of TPM and ISO 9001 certification

TPM is regarded as a world class manufacturing strategy that assists organisations to achieve world class performance [2,71]. Contemporary researchers refer to TPM not only as a maintenance strategy, but also as a 'total productive manufacturing' strategy [71] due to its ability to enhance the levels of productivity, quality, financial performance, delivery performance, safety, and morale in an organisation [2]. The ISO 9001 standard is a widely-adopted international standard [22] that has evolved over the years as a successful standard for developing QMS in various organisations [31].

During the past few years, many researchers have worked on the integration of various strategies to gain synergy. The result is the optimisation of resources and non-duplication of procedures and processes. Some of the integrated models of these world class strategies are the lean Six Sigma [44], agile [28], Six Sigma maintenance [60], and the lean Six Sigma quality management systems [33]. This has led to a literature survey to identify any research reporting the integration of TPM elements with those of the ISO 9001:2008 standard. No model was found in the literature to integrate TPM and the ISO 9001 standard. However, three papers published by Bamber et al. in 2000 [9], 2002 [7], and 2004 [8] were found to emphasise the necessity of integrating TPM with an integrated management system (IMS). In these papers, IMS integrates with ISO 9001-based QMS, the ISO 14001-based environmental management system (EMS), the TPM and 5S-based maintenance management system, the operations management system incorporated with just-in-time and Kaizen, and the BS 8800-based occupational health and safety management system (OHSAS). The authors of these papers pointed out the importance of the roles played by the maintenance personnel in adopting IMS. In particular, the listing of 27 maintenance engineering documents in Bamber et al. [8] that correlate with the QMS, EMS, and OHSAS, is noteworthy. Yet these papers have not contributed any model that integrates TPM and IMS. As a consequence, relevant information and knowledge was gathered from the literature to design a model to integrate the elements of TPM with those of the ISO 9001:2008 standard. This model was named 'TPM 9001:2008'.

In the context of integrating TPM and the ISO 9001 certification, the relationship between the two was examined by reviewing the literature. This literature review revealed the existence of connections between TPM and ISO 9001 certification from four angles [57]. These are briefly described below.

2.5.1 Principle-based connections

Two of the TPM principles - small group activities and continuous improvement - coincide with the eight quality management principles on which the ISO 9001 standard has been developed [13,62].

2.5.2 Element- and technique-based connections

Some of the common elements and techniques of TPM and the ISO 9001:2008 standard found in the literature are total employee involvement, leadership and management commitment, continuous improvement, training, and education [5,41,42,47].

2.5.3 Connections through award-based quality frameworks

The quality management principles are similar to the principles of the quality frameworks; the Malcolm Baldrige National Quality Award, the European Quality Award, and the Deming Prize [10,13,24,27,54]. These quality framework principles are, in turn, common with 11 dimensions of the JIPM TPM award [53].

2.5.4 Plan-do-check-act (PDCA) cycle-based connections

TPM adopts the PDCA cycle in the 'quality maintenance' pillar [1], whereas the PDCA cycle is used in the ISO 9001:2008 standard [61] to portray the clauses of QMS requirements.

The existence of a relationship between TPM and ISO 9001 certification, and the absence of a model connecting their elements, initiated new research. In this context, the TPM 9001:2008 model was designed. The conceptual features of this model are illustrated in the next section.

 

3. CONCEPTUAL FEATURES OF THE TPM 9001:2008 MODEL

Researchers have established that the eight pillars of TPM form the foundation of world class performance (WCP) by organisations [2]. On the other hand, the process-based model encapsulated in the ISO 9001:2008 standard is found to be a reflection of Deming's plan-do-check-act (PDCA) cycle [61], which has been reported to have aided organisations to achieve WCP. On observing these findings, the TPM 9001:2008 model was designed by merging the principles of TPM with the process-based model of the ISO 9001:2008 standard. The details of designing this model are described in the following subsections.

3.1 The constituents of the ISO 9001:2008 standard

The ISO 9001:2000 standard rests on the eight quality management principles and on Deming's PDCA cycle. The five major clauses of the ISO 9001:2000 standard have been retained in the latest ISO 9001:2008 standard [47]. The clauses describing the requirements of the ISO 9001:2008 standard-based QMS are listed below [29]:

  • Quality management system
  • Management responsibility
  • Resource management
  • Product realisation
  • Measurement, analysis, and improvement.

The working of the ISO 9001:2008 standard-based quality management system is shown in Figure 1.

 

 

The four clauses - 'management responsibility', 'resource management', 'product realisation', and 'measurement, analysis, and improvement' - drive the continual improvement of the quality management system. The thrust of this drive comes from the requirements that serve as input to the QMS. The continual improvement of the QMS is realised in customer satisfaction. Any recommendations and feedback from satisfied (or unsatisfied) customers are input into this model. In this way, continual improvement is achieved - and the cycle continues.

3.2 TPM pillars and world class performance

Since its inception, TPM has been built on various pillars. Initially formulated with five, the current structure of TPM is built on eight pillars [2], which are listed below:

  • Autonomous maintenance
  • Planned maintenance
  • Focused improvement
  • Quality maintenance
  • Education and training
  • Safety, health, and environment
  • Office TPM
  • Development management

An effective TPM programme requires the implementation of these eight pillars, leading organisations to achieve zero breakdowns, zero defects, and zero accidents [2]. In other words, implementation of the TPM pillars enables the organisations to perform at world class level. This is pictorially depicted in Figure 2.

 

 

Five of the eight TPM pillars - 'autonomous maintenance', 'planned maintenance', 'focused improvement', 'education and training', and 'development management' - mainly enable interruption-free production through achieving zero breakdowns. (This zero-defect level is promoted by seven of the eight pillars; 'safety, health, and environment' does not do this.) The three remaining pillars - 'education and training', 'safety, health, and environment', and 'office TPM' - primarily reduce or eliminate accidents when implemented [32].

3.3 Amending the TPM pillars in the ISO 9001:2008 standard

The clause entitled 'product realisation' in the ISO 9001:2008 standard helps to fulfil customer requirements. As TPM pillars also facilitate performance at a world class level, it is appropriate to amend the TPM requirements to fit the 'product realisation' clause. Of all the TPM pillars, three ('education and training', 'office TPM', and 'safety, health and environment') are most concerned with the management of resources and the organisation's infrastructure. The 'resources management' clause of the ISO 9001:2008 standard encompasses the sub-clauses 'human resources', 'competence, training, and awareness', 'infrastructure', and 'work environment'. As the contents of these sub-clauses deal with the management of resources and infrastructure, the TPM pillars of 'autonomous maintenance', 'education and training', 'office TPM', and 'safety, health and environment' can be appropriately amended in the 'resource management' clause of the ISO 9001:2008 standard.

The TPM pillar of 'development management' aims to improve existing systems, to train employees to fit in to the improved system, and to initiate new maintenance improvement initiatives. The requirements of this 'development management' pillar will be fulfilled through the implementation of three clauses of the ISO 9001:2008 standard: 'resources management', 'product realisation', and 'measurement, analysis, and improvement'. TPM performance is measured using the 'overall equipment effectiveness' (OEE) parameter. OEE is measured and then analysed to determine the deficiencies, and the activities required to improve the maintenance quality. OEE is the product of three components; 'availability', 'performance efficiency', and 'quality rate' [2]. These three components of OEE measure variables relating to breakdowns and defects. However, OEE does not have a component that measures accidents or variables relating to health and safety [50]. Therefore any suitable measures for measuring health and safety performance are to be added to achieve 'zero breakdowns' - one of the results of TPM implementation. Hence OEE and appropriate measures for health and safety performance can be amended in the 'measurement, analysis, and improvement' clause of the ISO 9001:2008 standard. Successful TPM implementation also requires teams and small groups [2]. This requirement can be appropriately amended in the 'management responsibility' clause of the ISO 9001:2008 standard. In this way, amending TPM elements to match the ISO 9001:2008 standard was conceptualised in designing the TPM 9001:2008 model. The conceptual features of this model reflecting these amendments are shown in Figure 3.

3.4 The TPM 9001:2008 model

As mentioned in the previous section, the TPM 9001:2008 model has been developed by amending the elements of TPM in the clauses of the ISO 9001:2008 standard. To carry out this task, the activities to build each TPM pillar had to be delineated. During the literature survey, it was found that Ahuja & Khamba [2] had pinpointed the activities required to build TPM pillars as a result of their extensive research; and these are appropriate for adoption in organisations. So it was decided to incorporate their activities with small modifications into the TPM 9001:2008 model's design. Those activities are shown in Table 1.

 

 

The activities listed in Table 1 were considered 'requirements', and were amended in the ISO 9001:2008 standard in accordance with the conceptual features shown in Figure 2. An excerpt from the TPM 9001:2008 model thus designed is presented in Table 2. As seen there, clause 6.2.2 of the TPM 9001:2008 model is obtained by amending appropriate TPM requirements of the ISO 9001:2008 standard. This aspect is shown pictorially in Figure 3; five of the TPM pillars are amended in the sixth and seventh clauses of the ISO 9001:2008 standard. Apart from the 'office TPM' pillar, the other four TPM pillars are amended under the sub-clauses numbered 6.2.2. f to l. The TPM pillars 'autonomous maintenance', 'focused improvement', 'planned maintenance', 'quality maintenance', and 'development management' are amended under the sub-clauses numbered 7.3.1. These TPM pillars amended in the 6.2.2. and 7.3.1. clauses of the ISO 9001:2008 standard are indicated in Table 2 using bold and italicised letters. An important fact to be observed in Table 2 is that the TPM pillars are amended with ISO 9001:2008 standard elements. This amendment ensures that the ISO 9001:2008-based QMS elements, including documentation, are not disturbed when the TPM 9001:2008 model is implemented in a company. Moreover, the same files used in the ISO 9001:2008-based QMS may be used while implementing the TPM 9001:2008 model in companies. This facility also indicates that the management representative of the ISO 9001:2008 standard-based QMS of the company can continue to perform as 'process facilitator' to facilitate the implementation of the TPM 9001:2008 model in the same company.

 

4. CONCLUSION

TPM and ISO 9001 certification are widely adopted globally, and the benefits gained from applying them indicate the capabilities of these two strategies [2,48]. Despite being recognised as world class strategies, TPM and ISO 9001 certification are applied separately in contemporary organisations. In a search through the literature, no system integrating TPM and ISO 9001 certification could be identified. Only a few authors [7,8,9] have emphasised the importance of linking a maintenance function into integrated management systems. To overcome this deficiency, the TPM 9001:2008 model, amending TPM requirements in the ISO 9001:2008 standard-based QMS, was conceptualised in this paper. The unique feature of the TPM 9001:2008 model is that, while implementing this model, the existing ISO 9001:2008-based QMS in the company is not modified or disturbed. This is because in the TPM 9001:2008 model, the TPM elements are only amended (not mixed) with the elements of the ISO 9001:2008 standard. The audit of the TPM 9001:2008 model may be conducted as a whole. Where the ISO 9001:2008 standard-based QMS is already audited in the company, the elements of this QMS may be excluded, and the remaining elements of the TPM 9001:2008 model may be audited. Thus the implementation of the TPM 9001:2008 model will not affect the ISO 9001:2008 standard-based QMS, but will bring the company benefits such as an increased OEE of the equipment, enhanced safety and health levels of the environment, and interruption-free production. The practical compatibility of this model will have to be checked by implementing it in several types of organisations.

 

REFERENCES

[1] Ahmed, S., Hassan, M.H. & Taha, Z. 2005. TPM can go beyond maintenance: Excerpt from a case implementation, Journal of Quality in Maintenance Engineering, 11(1), pp. 19-42.         [ Links ]

[2] Ahuja, I.P.S. & Khamba, J.S. 2008. Total productive maintenance: Literature review and directions, International Journal of Quality & Reliability Management, 25(7), pp. 709-756.         [ Links ]

[3] Ahuja, I.P.S. & Kumar, P. 2009. A case study of total productive maintenance implementation at precision tube mills, Journal of Quality in Maintenance Engineering, 15(3), pp. 241-258.         [ Links ]

[4] Ahuja, I.S. 2011. Total productive maintenance practices in manufacturing organisations: Literature review, International Journal of Technology, Policy and Management, 11(2), pp. 117-138.         [ Links ]

[5] Al-Hassan, K., Chan, J.F.L. & Metcalfe, A.V. 2000. The role of total productive maintenance in business excellence, Total Quality Management & Business Excellence, 11(4), pp. 596-601.         [ Links ]

[6] Al-Refaie, A., Ghnaimat, O. & Li, M. 2012. Effects of ISO 9001 certification and KAAE on performance of Jordanian firms, Jordan Journal of Mechanical and Industrial Engineering, 6(1), pp. 45-53.         [ Links ]

[7] Bamber, C., Sharp, J. & Hides, M. 2002. The role of the maintenance organisation in an integrated management system, Managerial Auditing Journal, 17(1/2). pp. 20-25.         [ Links ]

[8] Bamber, C.J., Sharp, J.M. & Castka, P. 2004. Third party assessment: The role of the maintenance function in an integrated management system, Journal of Quality in Maintenance Engineering, 10(1), pp. 26-36.         [ Links ]

[9] Bamber, C.J., Sharp, J.M. & Hides, M.T. 2000. Developing management systems towards integrated manufacturing: A case study perspective, Integrated Manufacturing Systems, 11(7), pp. 454-461.         [ Links ]

[10] Bayo-Moriones, A., Merino-Diaz-de-Cerio, J., Escamilla-de-Leon, S.A. & Selvam, R.M. 2011. The impact of ISO 9000 and EFQM on the use of flexible work practices, International Journal of Production Economics, 130(1), pp. 33-42.         [ Links ]

[11] Ben-Daya, M. 2000. You may need RCM to enhance TPM implementation, Journal of Quality in Maintenance Engineering, 6(2), pp. 82-85.         [ Links ]

[12] Bhuiyan, N. & Alam, N. 2005. An investigation into issues related to the latest version of ISO 9000, Total Quality Management, 16(2), pp. 199-213.         [ Links ]

[13] Biazzo, S. & Bernardi, G. 2003. Process management practices and quality systems standards: Risks and opportunities of the new ISO 9001 certification, Business Process Management Journal, 9(2), pp. 149-169.         [ Links ]

[14] Boiral, O. 2011. Managing with ISO systems: Lessons from practice, Long Range Planning, 44(3), pp. 197-220.         [ Links ]

[15] Brah, S.A. & Chong, W.K. 2004. Relationship between total productive maintenance and performance, International Journal of Production Research, 42(12), pp. 2383-2401.         [ Links ]

[16] Chan, F.T.S., Lau, H.C.W., Ip, R.W.L., Chan, H.K. & Kong, S. 2005. Implementation of total productive maintenance: A case study, International Journal of Production Economics, 95(1), pp. 71-94.         [ Links ]

[17] Cooke, F.L. 2000. Implementing TPM in plant maintenance: Some organizational barriers, International Journal of Quality and Reliability Management, 17(9), pp. 1003-1016.         [ Links ]

[18] Devadasan, S.R., Goshteeswaran, S. & Gokulachandran, J. 2005. Design for quality in agile manufacturing environment through modified orthogonal array-based experimentation, Journal of Manufacturing Technology Management, 16(6), pp. 576-597.         [ Links ]

[19] Eti, M.C., Ogaji, S.O.T. & Probert, S.D. 2004. Implementing total productive maintenance in Nigerian manufacturing industries, Applied Energy, 79(4), pp. 385-401.         [ Links ]

[20] Eti, M.C., Ogaji, S.O.T. & Probert, S.D. 2007. Integrating reliability, availability, maintainability and supportability with risk analysis for improved operation of the Afam thermal power-station, Applied Energy, 84(2), pp. 202-221.         [ Links ]

[21] Ferrari, E., Pareschi, A., Persona, A. & Regattiesi, A. 2002. TPM: Situation and procedure for soft implementation in Italian factories, The TQM Magazine, 14(6), pp. 350-358.         [ Links ]

[22] Fotopoulos, C. & Psomas, E. 2009. The use of quality management tools and techniques in ISO 9001:2000 certified companies: The Greek case, International Journal of Productivity and Performance Management, 58(6), pp. 564-580.         [ Links ]

[23] Franceschini, F., Galetto, M., Maisano, D. & Mastrogiacomo, L. 2011. A proposal of a new paradigm for national quality certification systems, International Journal of Quality & Reliability Management, 28(4), pp. 364-382.         [ Links ]

[24] Gotzamani, K. 2010. Results of an empirical investigation on the anticipated improvement areas of the ISO 9001:2000 standard, Total Quality Management, 21(6), pp. 687-704.         [ Links ]

[25] Gotzamani, K.D. & Tsiotras, G.D. 2002. The true motives behind ISO 9001 certification, International Journal of Quality and Reliability Management, 19(2), pp. 151-169.         [ Links ]

[26] Graisa, M. & Al-Habaibeh, A. 2011. An investigation into current production challenges facing the Libyan cement industry and the need for innovative total productive maintenance (TPM) strategy, Journal of Manufacturing Technology Management, 22(4), pp. 541-558.         [ Links ]

[27] Heras-Saizarbitoria, I., Casadesus, M. & Marimom, F. 2011. The impact of ISO 9001 standard and the EFQM model: The view of the assessors, Total Quality Management, 22(2), pp. 197-218.         [ Links ]

[28] Inman, R.A., Sale, R.S., Green Jr, K.W. & Whitten, D. 2011. Agile manufacturing: Relation to JIT, operational performance and firm performance, Journal of Operations Management, 29(4), pp. 343-355.         [ Links ]

[29] International Organization for Standardization (ISO). 2008. Quality Management Systems -Requirements, Geneva.         [ Links ]

[30] Ireland, F. & Dale, B.G. 2001. A study of total productive maintenance implementation, Journal of Quality in Maintenance Engineering, 7(3), pp. 183-191.         [ Links ]

[31] ISO Survey. 2010. http://www.iso.org/iso/survey2010.pdf (visited on February 13, 2012).         [ Links ]

[32] Japanese Institute of Plant Maintenance - Solutions, http://tpm.jipms.jp/nprize/index.html (visited on March 27, 2012).         [ Links ]

[33] Karthi, S., Devadasan, S.R. & Murugesh, R. 2011. Lean Six Sigma through ISO 9001 standard-based quality management system: An investigation for research, International Journal of Productivity and Quality Management, 8(2), pp. 180-204.         [ Links ]

[34] Koc, T. 2007. The impact of ISO 9000 quality management systems on manufacturing, Journal of Materials Processing Technology, 186(1-3), pp. 207-213.         [ Links ]

[35] Lazim, H.M. & Ramayah, T. 2010. Maintenance strategy in Malaysian manufacturing companies: A total productive maintenance (TPM) approach, Business Strategy Series, 11(6), pp. 387-396.         [ Links ]

[36] Lewis, W.G., Pun, K.F. & Lalla, T.R.M. 2005. An AHP-based study of TQM benefits in ISO 9001 certified SMEs in Trinidad and Tobago, The TQM Magazine, 17(6), pp. 558-572.         [ Links ]

[37] Magd, H. & Curry, A. 2003. An empirical analysis of management attitudes towards ISO 9001:2000 in Egypt, The TQM Magazine, 15(6), pp. 381-390.         [ Links ]

[38] Magd, H.A.E. 2008. ISO 9001:2000 in the Egyptian manufacturing sector: Perceptions and perspectives, International Journal of Quality and Reliability Management, 25(2), pp. 173-200.         [ Links ]

[39] Mak, B.L.M. 2011. ISO certification in the tour operator sector, International Journal of Contemporary Hospitality Management, 23(1), pp. 115-130.         [ Links ]

[40] Maletic, D., Maletic, M. & Gomiscek, B. 2012. The relationship between continuous improvement and maintenance performance, Journal of Quality in Maintenance Engineering, 18(1), pp. 30-41.         [ Links ]

[41] Martinez-Costa, M., Choi, T.Y., Martinez, J.A. & Martinez-Lorente, A.R.M. 2009. ISO 9000 / 1994, ISO 9001 / 2000 and TQM: The performance debate revisited, Journal of Operations Management, 27(6), pp. 495-511.         [ Links ]

[42] McKone, K.E., Schroedar, R.G. & Cua, K.O. 1999. Total productive maintenance: A contextual view, Journal of Operations Management, 17(2), pp. 123-144.         [ Links ]

[43] Muthu, S., Devadasan, S.R., Mendonca, P.S. & Sundararaj, G. 2001. Pre-auditing through a knowledge base system for successful implementation of a Qs 9000 based maintenance quality system, Journal of Quality in Maintenance Engineering, 7(2), pp. 90-103.         [ Links ]

[44] Pepper, M.P.J. & Spedding, T.A. 2010. The evolution of lean Six Sigma, International Journal of Quality and Reliability Management, 27(2), pp. 138-155.         [ Links ]

[45] Perez-Lafont, J.L. 1997. Installation of a TPM program in a Caribbean plant, Computers in Industrial Engineering, 33(1-2), pp. 315-318.         [ Links ]

[46] Piskar, F. & Dolinsek, S. 2006. Implementation of the ISO 9001: From QMS to business model, Industrial Management and Data Systems, 106(9), pp. 1333-1343.         [ Links ]

[47] Psomas, E.L. & Fotopoulos, C.V. 2009. A meta analysis of ISO 9001:2000 research - findings and future research proposals, International Journal of Quality and Service Sciences, 1(2), pp. 128144.         [ Links ]

[48] Psomas, E.L., Fotopoulos, C.V. & Kafetzopoulos, D.P. 2010. Critical factors for effective implementation of ISO 9001 in SME service companies, Managing Service Quality, 20(5), pp. 440-457.         [ Links ]

[49] Rodrigues, M. & Hatakeyama, K. 2006. Analysis of the fall of TPM in companies, Journal of Materials Processing Technology, 179(1-3), pp. 276-279.         [ Links ]

[50] Roe, S. & Mba, D. 2009. The environment, international standards, asset health management and condition monitoring: An integrated strategy, Reliability Engineering and System Safety, 94(2), pp. 474-478.         [ Links ]

[51] Rusjan, B. & Alic, M. 2010. Capitalising on ISO 9001 benefits for strategic results, International Journal of Quality and Reliability Management, 27(7), pp. 756-778.         [ Links ]

[52] Sampaio, P., Saraiva, P. & Rodrigues, A.G. 2009. ISO 9001 certification research: Questions, answers and approaches, International Journal of Quality & Reliability Management, 26(1), pp. 38-58.         [ Links ]

[53] Seth, D. & Tripathi, D. 2005. Relationship between TQM and TPM implementation factors and business performance of manufacturing industry in Indian context, International Journal of Quality and Reliability Management, 22(3), pp. 256-277.         [ Links ]

[54] Sharma, M. & Kodali, R. 2008. TQM implementation elements for manufacturing excellence, The TQM Magazine, 20(6), pp. 599-621.         [ Links ]

[55] Sharma, R.K., Kumar, D. & Kumar, P. 2006. Manufacturing excellence through TPM implementation: A practical analysis, Industrial Management and Data Systems, 106(2), pp. 256-280.         [ Links ]

[56] Singh, P.J., Power, D. & Chuong, S.C. 2011. A resource dependence theory perspective of ISO 9000 in managing organizational environment, Journal of Operations Management, 29(1-2), pp. 49-64.         [ Links ]

[57] Sivaram, N.M., Devadasan, S.R., Sreenivasa, C.G., Karthi, S. & Murugesh, R. 2012. A literature review on the integration of total productive maintenance elements with ISO 9001 standard, International Journal of Productivity and Quality Management, 9(3), pp.281-308.         [ Links ]

[58] Stevenson, T.H. & Barnes, F.C. 2002. What industrial marketers need to know now about ISO 9000 certification: A review, update, and integration with marketing, Industrial Marketing Management, 31(8), pp. 695-703.         [ Links ]

[59] Sun, H., Yam, R. & Wai-Keung, N. 2003. The implementation and evaluation of total productive maintenance (TPM) - An action case study in a Hong Kong manufacturing company, International Journal of Advanced Manufacturing Technology, 22(3-4), pp. 224-228.         [ Links ]

[60] Thomas, A., Barton, R. & Byard, P. 2008. Developing a Six Sigma maintenance model, Journal of Quality in Maintenance Engineering, 14(3), pp. 262-271.         [ Links ]

[61] To, W.M., Lee, P.K.C. & Yu, B.T.W. 2011. ISO 9001:2000 implementation in the public sector - A survey in Macao SAR, the People's Republic of China, The TQM Journal, 23(1), pp. 59-72.         [ Links ]

[62] Tsang, A.H.C. & Chan, P.K. 2000. TPM implementation in China: A case study, International Journal of Quality & Reliability Management, 17(2), pp. 144-157.         [ Links ]

[63] Tsarouhas, P. 2007. Implementation of total productive maintenance in food industry: A case study, Journal of Quality in Maintenance Engineering, 13(1), pp. 5-18.         [ Links ]

[64] Van der Wal, R.W.E. & Lynn, D. 2002. Total productive maintenance in a South African pulp and paper company: A case study, the TQM Magazine, 14(6), pp. 359-366.         [ Links ]

[65] Vinodh, S., Shivraman, K.R. & Viswesh, S. 2011. AHP-based lean concept selection in a manufacturing organization, Journal of Manufacturing Technology Management, 23(1), pp. 124-136.         [ Links ]

[66] Wahid, R.A. & Corner, J. 2009. Critical success factors and problems in ISO 9000 maintenance, International Journal of Quality and Reliability Management, 26(9), pp. 881-893.         [ Links ]

[67] Wakjira, M.W. & Singh, A.P. 2012. Total productive maintenance: A case study in manufacturing industry, Global Journal of Researches in Engineering, 12(1), pp. 1-9.         [ Links ]

[68] Yamashina, H. 1995. Japanese manufacturing strategy and the role of total productive maintenance, Journal of Quality in Maintenance Engineering, 1(1), pp.27-38.         [ Links ]

[69] Zeng, S.X., Tian, P. & Shi, J.J. 2005. Implementing integration of ISO 9001 and ISO 14001 for construction, Managerial Auditing Journal, 20(4), pp. 394-407.         [ Links ]

[70] Zeng, S.X., Tian, P. & Tam, C.M. 2007. Overcoming barriers to sustainable implementation of the ISO 9001 system, Managerial Auditing Journal, 22(3), pp. 244-254.         [ Links ]

[71] Willmott, P. & McCarthy, D. 2001. TPM: A route to world class performance, Butterworth-Heinemann, Oxford.         [ Links ]

[72] Fotopoulos, C.V., Psomas, E.L., & Vouzas, F.K. 2010. ISO 9001:2000 implementation in the Greek food sector, The TQM Journal, 22(2), pp. 129-142.         [ Links ]

[73] Starke, F. 2012. Impact of ISO 9000 certification on firm performance: Evidence from Brazil, Management Research Review, 35(10), pp. 974-997.         [ Links ]

 

 

1 The author is a PhD Research Scholar (Full Time) in the Department of Production Engineering, PSG College of Technology, Coimbatore, Tamil Nadu, India

Creative Commons License All the contents of this journal, except where otherwise noted, is licensed under a Creative Commons Attribution License