SciELO - Scientific Electronic Library Online

 
vol.22 número1Planning empty container relocations under uncertaintyTwo-commodity perishable inventory system with bulk demand for one commodity índice de autoresíndice de assuntospesquisa de artigos
Home Pagelista alfabética de periódicos  

Serviços Personalizados

Artigo

Indicadores

Links relacionados

  • Em processo de indexaçãoCitado por Google
  • Em processo de indexaçãoSimilares em Google

Compartilhar


South African Journal of Industrial Engineering

versão On-line ISSN 2224-7890
versão impressa ISSN 1012-277X

S. Afr. J. Ind. Eng. vol.22 no.1 Pretoria  2011

 

An empirical study of factors and cognisant measures for project quality in the design phase: A case of building projects in the Department of Building and Engineering Services of Botswana

 

 

E.N.D. Dodoo; C.C. van Waveren; K-Y. Chan

Graduate School of Technology Management, University of Pretoria, South Africa. corro@up.ac.za, alice.chan@up.ac.za

 

 


ABSTRACT

There were numerous complaints regarding the quality of building projects performed by the Department of Building and Engineering Services (DBES) in Botswana. This empirical study has two objectives: first, to evaluate participants in DBES projects by using 16 identified factors in the project design phase that may influence the quality of building projects; second, to explore the inter-relationships between the 16 factors in the project design phase and the five measures of which the design phase takes cognisance. The study applied a quantitative research methodology. A total of 115 survey questionnaires were distributed to collect data. A descriptive and a multivariate analysis was performed.


OPSOMMING

In Botswana was daar verskeie klagtes ontvang aangaande die kwaliteit van bouprojekte soos uitgevoer deur die Departement van Bou- en Ingenieursdienste (DBES) in Botswana. Twee doelwitte is vir hierdie studie gestel: Eerstens om deelnemers in DBES projekte te evalueer aan die hand van 16 geïdentifiseerde faktore ten opsigte van die kwaliteit van bouprojekte tydens die ontwerpfase van hierdie projekte; en tweedens om die verwantskap te ondersoek tussen die 16 faktore in die ontwerpfase van bouprojekte en die vyf maatstawwe wat tydens die ontwerpfase in aanmerking geneem word. 'n Kwantitatiewe navorsingsmetodiek is tydens hierdie studie gebruik, waar 'n totaal van 115 vraelyste uitgestuur is. 'n Beskrywende en meerveranderlike analise is uitgevoer.


 

 

“Full text available only in PDF format”

 

 

REFERENCES

[1] Pinto, J. & Prescott, J.E. 1990. Planning and tacticle factors in the project implementation process, Journal of Management Studies, 27(3), pp. 305-327.         [ Links ]

[2] Chan, D.W.M. & Kumaraswamy, M.M. 1997. A comparative study of causes of time overruns in Hong Kong construction projects, International Journal of Project Management, 15 (1), pp. 55-63.         [ Links ]

[3] Ibbs, W., Kwak, Y.H., Ng, T. & Odabasi, A.M. 2003. Project delivery systems and project change: Quantitative analysis, Journal of Construction Engineering and Management, 129(4), pp. 382-387.         [ Links ]

[4] Ling, Y., Meng, F. & Shao, Y. 2009. Research on application of constructability in project design phase under EPC mode, Construction Economy, 2009-01-028.         [ Links ]

[5] Anderson, S. 2005. Botswana: Land of paradoxes, unpublished paper, Mercatus, George Mason University.         [ Links ]

[6] Steyn, H. et al. 2007. Project management: A multi-disciplinary approach, 2nd edition, FPM Publishing.         [ Links ]

[7] Leseure, M.J. & Brookes, N.J. 2004. Knowledge management benchmarks for project management, Journal of Knowledge Management, 8(1), pp. 103-116.         [ Links ]

[8] Carruthers, M.C. 1999. Principles of management for quality projects, London International Thomson Business Press.         [ Links ]

[9] Kloppenborg, T.J. & Petrick, J.A. 2002. Managing project quality, Management Concept Inc.         [ Links ]

[10] Darwish, M.I. et al. 2007. Factors affecting design and documentation quality in the construction industry, Construction Contracting Administration.         [ Links ]

[11] Chan, A.P.C., Scott, D. & Chan, A.P.L. 2004. Factors affecting the success of a construction project, Journal of Construction Engineering and Management, 130(1), pp. 153-155.         [ Links ]

[12] Dumont, P., Gibson, G. & Fish, J. 1997. Scope management using the project definition rating index (PDRI), ASCE Journal of Management in Engineering, 13(5), pp. 54 -60.         [ Links ]

[13] Cho, C.-S & Gibson, G.E., Jr. 2001. Building project scope definition using project definition rating index, Journal of Architectural Engineering, 7(4), pp. 115-125.         [ Links ]

[14] Hameri, A.-P. 1997. Project management in a long-term and global one-of-a-kind project, International Journal of Project Management, 15(3), pp. 151-157. 154        [ Links ]

 

 

* Corresponding author.
1 The author was enrolled enrolled for a MEng (Project Management) degree in the Graduate School of Technology Management, University of Pretoria)

Creative Commons License Todo o conteúdo deste periódico, exceto onde está identificado, está licenciado sob uma Licença Creative Commons