South African Journal of Industrial Engineering

On-line version ISSN 2224-7890
Print version ISSN 1012-277X

S. Afr. J. Ind. Eng. vol.21 n.1 Pretoria  2010

 

CASE STUDIES

 

Quality performance: The case of construction projects in the electricity industry in Kenya

 

 

N.O. Ogano; L. Pretorius

Department of Engineering and Technology Management, University of Pretoria, South Africa. nomondi@kplc.co.ke, leon.pretorius@up.ac.za

 

 


ABSTRACT

Pressure from the Government of Kenya to have citizens connected to electricity as a means of improving their standard of living has resulted in a focus on the electricity utilities to expand the power distribution network. Contractors have therefore been approved to expedite the process. This has, however, resulted in sub-standard work being done by some of the contractors. The main objective of the research is to determine the critical factors that are instrumental in the delivery of quality construction projects for the electricity industry of Kenya. The results of the research reveal that there are areas in which the electricity utilities and the associated contractors perform poorly, indicating the need to improve the quality of completed projects.


OPSOMMING

Druk van die regering van Kenia om sy burgers se lewenstandaard te verhoog, het aanleiding gegee tot 'n behoefte aan die vermeerdering van elektriese aansluitings. Dit het verder daartoe aanleiding gegee dat elektrisiteitsverskaffers die elektrisiteitsverspreidingsnetwerk voortdurend moes vergroot. Om die proses te verhaas, is kontrakteurs aangestel om sekere werk te doen. Dit het egter daartoe gelei dat sekere subkontrakteurs substandaard werk lewer. Die hoofdoel van die navorsing is om kritiese faktore te identifiseer wat aflewering van kwaliteit konstruksieprojekte in die elektrisiteitsindustrie van Kenia beïnvloed. Die resultate van die navorsing dui daarop dat daar areas is waar die elektrisiteitsverskaffers self asook die kontrakteurs nie na wense presteer nie. Die behoefte aan kwaliteits-verbetering in die voltooiing van projekte word geïllustreer.


 

 

“Full text available only in PDF format”

 

 

REFERENCES

[1] Bland, F.M., Maynard, J. & Herbery, D.W. 1998. Quality costing of an administrative process, The TQM Magazine 10(5), pp. 367-377.         [ Links ]

[2] Cooper, D.R. & Schindler, P.S. 2001. Business research methods, 7th edition, Irwin/McGraw-Hill, Singapore.         [ Links ]

[3] David, G.A. & Artemis, M. 1986. A note on quality: The views of Deming, Juran and Crosby, Harvard Business school cases, Sept. 1986.         [ Links ]

[4] Giakatis, G., Enkawa, T. & Washitani, K. 2001. Hidden quality costs and the distinction between quality cost and quality loss, Total Quality Management 12(2), pp. 179-190        [ Links ]

[5] Jafaari, A. 1996. Human factors in the Australian construction industry: Towards total quality management, Australian Journal of Management, 21(2), pp. 159-85.         [ Links ]

[6] Jha, K. & Iyer, K. 2006. Critical factors affecting quality performance in construction projects, Total Quality Management, 17(9), pp.1155-1170.         [ Links ]

[7] Karim, K., Marosszeky, M. & Davis, S. 2006. Managing subcontractor supply chain for quality in construction, Engineering, Construction and Architectural Management, 13(1), pp.27-42.         [ Links ]

[8] Kaynak, E. & Kara. A. 2002. Consumer perceptions of foreign products: An analysis of product-country images and ethnocentrism, European Journal of Marketing. 36(7/8), pp.928-49.         [ Links ]

[9] Key, J.P. 1997. Research design in occupational education. Oklahoma State University.         [ Links ]

[10] Maina P.M. 2001. Perceived service quality: the case of Mobile Services. Unpublished MBA Project, University of Nairobi.         [ Links ]

[11] Mukhopadhyay, A.R. 2004. Estimation of cost of quality in an Indian textile industry for reducing cost of non-conformance. Total Quality Management, 15(2), pp. 229-234.         [ Links ]

[12] Mwaura A.K. 2002. Perceived service quality: The case of the taxi industry in Kenya. Unpublished MBA Project, University of Nairobi.         [ Links ]

[13] Pheng, S.L. & Tan, W. 1996. Public policies for managing construction quality: The grand strategy of Singapore, Construction Management and Economics, 14, pp. 295-309.         [ Links ]

[14] Satterfield, P.E. 2005. Quality control in construction projects, NESC Engineering Scientist, 5(2).         [ Links ]

[15] Serpell, A., Solminihac, H. & Figari, C. 2002. Quality in construction: The situation of the Chilean construction industry, Total Quality Management, 13(5), pp. 579- 587.         [ Links ]

[16] www.kplc.co.ke, 2008.         [ Links ]

 

 

* Corresponding author